EP3705683 - HORIZONTAL DRILLING SYSTEM [Right-click to bookmark this link] | Status | Opposition rejected Status updated on 17.05.2024 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 23.07.2021 | ||
Former | Grant of patent is intended Status updated on 14.06.2021 | ||
Former | Request for examination was made Status updated on 20.11.2020 | ||
Former | The application has been published Status updated on 07.08.2020 | Most recent event Tooltip | 17.05.2024 | Opposition rejected | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Dekena, Marvin Nettelburger Str. 2 26427 Esens / DE | [2021/43] |
Former [2020/37] | For all designated states Dekena, Wilfried Esenser Str. 17 26427 Stedesdorf / DE | ||
For all designated states Dekena, Marvin Rotkehlchenstr. 11 26427 Stedesdorf / DE | Inventor(s) | 01 /
DEKENA, Wilfried Esenser Str. 17 26427 Stedesdorf / DE | 02 /
DEKENA, Marvin Nettelburger Str. 2 26427 Esens / DE | [2021/43] |
Former [2020/37] | 01 /
see applicant ... | Representative(s) | Jabbusch, Matthias Jabbusch Siekmann & Wasiljeff Patentanwälte Hauptstrasse 85 26131 Oldenburg / DE | [2020/37] | Application number, filing date | 20161566.3 | 06.03.2020 | [2020/37] | Priority number, date | DE201920101322U | 08.03.2019 Original published format: DE 202019101322 U | [2020/37] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3705683 | Date: | 09.09.2020 | Language: | DE | [2020/37] | Type: | B1 Patent specification | No.: | EP3705683 | Date: | 25.08.2021 | Language: | DE | [2021/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.07.2020 | Classification | IPC: | E21B7/04, E21B7/02 | [2020/37] | CPC: |
E21B7/02 (EP);
E21B7/046 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/52] |
Former [2020/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HORIZONTALBOHRANLAGE | [2020/37] | English: | HORIZONTAL DRILLING SYSTEM | [2020/37] | French: | INSTALLATION DE FORAGE HORIZONTALE | [2020/37] | Examination procedure | 13.11.2020 | Amendment by applicant (claims and/or description) | 13.11.2020 | Examination requested [2020/52] | 13.11.2020 | Date on which the examining division has become responsible | 15.06.2021 | Communication of intention to grant the patent | 13.07.2021 | Fee for grant paid | 13.07.2021 | Fee for publishing/printing paid | 13.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
24.05.2022
27.05.2022
ADMISSIBLE AT-Boretec Inh. Andreas Tigges e.K. Im Brauke 11c 57392 Schmallenberg / DE Opponent's representative Graefe, Jörg, et al, et al Fritz Patent- und Rechtsanwälte Partnerschaft mbB Postfach 1580 59705 Arnsberg / DE | [2022/27] |
Former [2022/26] | |||
Opponent(s) | 01
24.05.2022
AT-Boretec Inh. Andreas Tigges e.K. Im Brauke 11c 57392 Schmallenberg / DE Opponent's representative Graefe, Jörg, et al, et al Fritz Patent- und Rechtsanwälte Partnerschaft mbB Postfach 1580 59705 Arnsberg / DE | 10.06.2022 | Invitation to proprietor to file observations on the notice of opposition | 29.08.2022 | Reply of patent proprietor to notice(s) of opposition | 16.01.2024 | Legal effect of rejection of opposition [2024/25] | 16.01.2024 | Date of oral proceedings | 14.02.2024 | Despatch of minutes of oral proceedings | 14.02.2024 | Date of despatch of rejection of opposition |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 25.08.2021 | CY | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | RS | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | IS | 25.12.2021 | IE | 06.03.2022 | [2024/23] |
Former [2024/20] | AL | 25.08.2021 | |
CY | 25.08.2021 | ||
MC | 25.08.2021 | ||
RS | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
IE | 06.03.2022 | ||
Former [2023/09] | AL | 25.08.2021 | |
MC | 25.08.2021 | ||
RS | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
IE | 06.03.2022 | ||
Former [2022/47] | AL | 25.08.2021 | |
MC | 25.08.2021 | ||
RS | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/36] | AL | 25.08.2021 | |
RS | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/29] | AL | 25.08.2021 | |
RS | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/26] | RS | 25.08.2021 | |
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/24] | RS | 25.08.2021 | |
SK | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/10] | RS | 25.08.2021 | |
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
Former [2022/09] | RS | 25.08.2021 | |
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
Former [2022/07] | NO | 25.11.2021 | Documents cited: | Search | [I]US4953638 (DUNN RICHARD P [US]) [I] 1 * column 4, line 1 - line 8 * * figures 1, 2 *; | [Y]US5018588 (HABERER JOHANN [DE]) [Y] 11* column 2, line 49 - line 56; figures 1, 2 *; | [Y]US5226488 (LESSARD WILLIE J [US], et al) [Y] 3,4,8,9 * column 2, line 57 - column 3, line 35 * * figure 1 *; | [IY]EP0757155 (TRACTO TECHNIK [DE]) [I] 1,2,5-7,10 * the whole document * [Y] 3,4,8,9,11; | [I]DE102010019514 (TRACTO TECHNIK [DE]) [I] 1 * paragraph [0003] - paragraph [0004] * * figure 1 * | Opposition | US5226488 | DE19917538 | US6257350 | DE10159202 | DE10195926T | DE10325560 | US2008066967 | DE10325576 | WO2012075289 | DE112011101697T | US2016356191 | US9598905 | US9945180 | DE202016008527U | US2018363443 | EP3428382 | DE112013005362 | US10563458 | - D8x12 Navigator Horizontal Direc- watch?v=nLPJQ9ARPPo tional Drill | Vermeer Underground Equipment, (20180602), URL: https://www.youtube.com, XP055934873 | - Vermeer D8x12 Navigator Horizon- watch?v=h9N57GPT10Q tal Directional Drill, (20171017), URL: https://www.youtube.com, XP055934877 | - Vermeer, "D8x12 NAVIGATOR - HORIZONTALSPÜLBOHRANLAGE", (20180101), pages 1 - 2, XP055934898 | - Vermeer, "D8x12 NAVIGATOR - HORIZONTAL DIRECTIONAL DRILL", (20180101), pages 1 - 2, XP055934895 |