blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3713318

EP3713318 - METHOD AND APPARATUS OF HANDLING DEVICE-TO-DEVICE FEEDBACK TRANSMISSION IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.06.2022
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  16.07.2021
FormerGrant of patent is intended
Status updated on  30.03.2021
FormerRequest for examination was made
Status updated on  04.12.2020
FormerThe application has been published
Status updated on  21.08.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
Taipei City 112 / TW
[2021/33]
Former [2020/39]For all designated states
ASUSTek Computer Inc.
No. 15, Lite Road
Peitou Dist.
Taipei City 112 / TW
Inventor(s)01 / LI, Ming-Che
c/o ASUSTek Computer Inc.
No. 15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
02 / HUANG, Chun-Wei
c/o ASUSTek Computer Inc.
No. 15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
 [2021/33]
Former [2020/39]01 / LI, Ming-Che
c/o ASUSTek Computer Inc.
No. 15, Lite Rd.
Peitou District
112 Taipei City / TW
02 / HUANG, Chun-Wei
c/o ASUSTek Computer Inc.
No. 15, Lite Rd.
Peitou District
112 Taipei City / TW
Representative(s)Hoefer & Partner Patentanwälte mbB
Pilgersheimer Straße 20
81543 München / DE
[2020/39]
Application number, filing date20162313.911.03.2020
[2020/39]
Priority number, dateUS201962821731P21.03.2019         Original published format: US 201962821731 P
[2020/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3713318
Date:23.09.2020
Language:EN
[2020/39]
Type: B1 Patent specification 
No.:EP3713318
Date:18.08.2021
Language:EN
[2021/33]
Search report(s)(Supplementary) European search report - dispatched on:EP21.07.2020
ClassificationIPC:H04W72/02, H04W72/04, H04L1/18, // H04W92/18, H04W76/14
[2021/16]
CPC:
H04W72/02 (EP,US); H04L1/1861 (KR); H04B7/0417 (CN);
H04L1/0027 (US); H04L1/1614 (EP); H04L1/1812 (KR);
H04L1/1854 (EP); H04L1/1887 (EP); H04L5/0044 (EP,KR);
H04L5/0048 (CN); H04L5/0053 (KR); H04L5/0055 (EP);
H04L5/0057 (EP,CN); H04L5/0082 (US); H04W72/0446 (KR);
H04W72/0453 (EP,KR); H04W92/18 (EP,KR,US); H04L1/0026 (EP);
H04W76/14 (EP) (-)
Former IPC [2020/39]H04W72/02, H04W72/04, // H04W92/18, H04W76/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/01]
Former [2020/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR HANDHABUNG EINER VORRICHTUNG-ZU-VORRICHTUNG-RÜCKKOPPLUNGSÜBERTRAGUNG IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM[2020/39]
English:METHOD AND APPARATUS OF HANDLING DEVICE-TO-DEVICE FEEDBACK TRANSMISSION IN A WIRELESS COMMUNICATION SYSTEM[2020/39]
French:PROCÉDÉ ET APPAREIL DE GESTION DE LA TRANSMISSION DE RÉTROACTION DE DISPOSITIF À DISPOSITIF DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2020/39]
Examination procedure01.12.2020Amendment by applicant (claims and/or description)
01.12.2020Examination requested  [2021/01]
01.12.2020Date on which the examining division has become responsible
31.03.2021Communication of intention to grant the patent
09.07.2021Fee for grant paid
09.07.2021Fee for publishing/printing paid
09.07.2021Receipt of the translation of the claim(s)
Opposition(s)19.05.2022No opposition filed within time limit [2022/30]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.03.2020
AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
MK18.08.2021
MT18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
TR18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
[2024/44]
Former [2024/29]HU11.03.2020
AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
MK18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
TR18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
Former [2024/25]HU11.03.2020
AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
MK18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
Former [2024/23]AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
MK18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
Former [2024/20]AL18.08.2021
AT18.08.2021
CY18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
Former [2023/10]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
BE31.03.2022
Former [2023/08]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
IE11.03.2022
LU11.03.2022
Former [2022/47]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
MC18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/36]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SI18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/29]AL18.08.2021
AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/25]AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
SM18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/24]AT18.08.2021
CZ18.08.2021
DK18.08.2021
EE18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RO18.08.2021
RS18.08.2021
SE18.08.2021
SK18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/21]AT18.08.2021
DK18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/10]AT18.08.2021
FI18.08.2021
HR18.08.2021
LT18.08.2021
LV18.08.2021
PL18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
GR19.11.2021
IS18.12.2021
PT20.12.2021
Former [2022/09]AT18.08.2021
FI18.08.2021
LT18.08.2021
RS18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
PT20.12.2021
Former [2022/08]AT18.08.2021
FI18.08.2021
LT18.08.2021
SE18.08.2021
BG18.11.2021
NO18.11.2021
Former [2022/07]AT18.08.2021
LT18.08.2021
NO18.11.2021
Documents cited:Search[A]US2017295601  (KIM HAKSEONG [KR], et al) [A] 1-15 * the whole document *;
 [XAI]WO2019029652  (HUAWEI TECH CO LTD [CN]) [X] 12 * abstract * * paragraphs [0002]-[0004], [0011]-[0014], [0020], [0022], [0035], [0069], [0070], [0093], [0094], [0097], [0106], [0107], [0113]-[0119], [0130], [0142], [0144], [0147], [0151], [0153], [0154], [0167], [0169], [0176]-[0178] * * figures 17a,17b * * claims 1-25 * [A] 1-11 [I] 13-15;
 [A]EP3451563  (IND TECH RES INST [TW]) [A] 1-15 * the whole document *;
 [A]  - HUAWEI ET AL, "Design and contents of PSCCH and PSFCH", vol. RAN WG1, no. Athens, Greece; 20190225 - 20190301, (20190215), 3GPP DRAFT; R1-1903071, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F96/Docs/R1%2D1903071%2Ezip, (20190215), XP051600767 [A] 1-15 * the whole document *
by applicant   - "E-UTRA; Physical layer procedures (Release 15", TS 36.213
    - "E-UTRA; Physical layer; Multiplexing and channel coding (Release 15", TS 36.212
    - "E-UTRA; Physical layer; Physical channels and modulation (Release 15", TS 36.211
    - "E-UTRA); Physical layer; Measurements (Release 15", TS 36.214
    - LG ELECTRONICS, "Revised SID: Study on NR V2X", RP-182111
    - SAMSUNG, "Considerations on sidelink HARQ procedure", Rl-1901052
    - VIVO, "Physical layer procedure for NR sidelink", R1-1901683
    - LG ELECTRONICS, "Discussion on physical layer procedure for NR V2X", Rl-1901931
    - CATT, "Discussion on physical layer procedures in NR V2X", Rl-1901993
    - LG ELECTRONICS, "Feature lead summary #3 for agenda item 7.2.4.1.1 Physical layer structure", Rl-1903769
    - LG ELECTRONICS, "Feature lead summary #2 for agenda item 7.2.4.1.2 Physical layer procedures", Rl-1903597
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.