EP3719340 - PROTECTION DEVICE BRAKING MECHANISM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2024 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 28.04.2023 | ||
Former | Grant of patent is intended Status updated on 16.11.2022 | ||
Former | Examination is in progress Status updated on 30.06.2022 | ||
Former | Request for examination was made Status updated on 04.09.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Honeywell International Inc. 115 Tabor Road M/S 4D3 P.O. Box 377 Morris Plains, NJ 07950 / US | [2020/41] | Inventor(s) | 01 /
MIZIN, Denis HONEYWELL INTERNATIONAL INC. P.O. Box 377 115 Tabor Road M/S 4D3 Morris Plains, NJ New Jersey 07950 / US | 02 /
HRUZA, Vaclav HONEYWELL INTERNATIONAL INC. P.O. Box 377 115 Tabor Road M/S 4D3 Morris Plains, NJ New Jersey 07950 / US | 03 /
SVOBODA, Radim HONEYWELL INTERNATIONAL INC. P.O. Box 377 115 Tabor Road M/S 4D3 Morris Plains, NJ New Jersey 07950 / US | 04 /
MARAK, Pavel HONEYWELL INTERNATIONAL INC. P.O. Box 377 115 Tabor Road M/S 4D3 Morris Plains, NJ New Jersey 07950 / US | [2020/41] | Representative(s) | Haseltine Lake Kempner LLP Cheapside House 138 Cheapside London EC2V 6BJ / GB | [2023/22] |
Former [2020/41] | Haseltine Lake Kempner LLP 138 Cheapside London EC2V 6BJ / GB | Application number, filing date | 20167848.9 | 02.04.2020 | [2020/41] | Priority number, date | US201916376359 | 05.04.2019 Original published format: US201916376359 | [2020/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3719340 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Type: | A3 Search report | No.: | EP3719340 | Date: | 16.12.2020 | Language: | EN | [2020/51] | Type: | B1 Patent specification | No.: | EP3719340 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.11.2020 | Classification | IPC: | F16D59/00, B66D5/04, B60T1/14, B60T7/12, B60T8/1761, B60T8/32, B60T8/72, B60T8/74, B60T8/86, B60T13/06, F16D59/02 | [2020/51] | CPC: |
B60T1/14 (EP);
A62B35/00 (CN);
F16D63/008 (EP,US);
A62B1/14 (US);
B60T13/06 (EP);
B60T7/126 (EP);
B61H9/02 (EP,US);
E04G21/32 (CN);
F16D59/02 (EP);
B61B7/00 (US)
(-)
|
Former IPC [2020/41] | F16D59/00, B66D5/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/41] | Title | German: | BREMSVORRICHTUNG FÜR EINE SCHUTZVORRICHTUNG | [2020/41] | English: | PROTECTION DEVICE BRAKING MECHANISM | [2020/41] | French: | MÉCANISME DE FREINAGE D'UN DISPOSITIF DE PROTECTION | [2020/41] | Examination procedure | 02.04.2020 | Examination requested [2020/41] | 08.06.2021 | Amendment by applicant (claims and/or description) | 29.06.2022 | Despatch of a communication from the examining division (Time limit: M03) | 06.09.2022 | Reply to a communication from the examining division | 17.11.2022 | Communication of intention to grant the patent | 13.03.2023 | Fee for grant paid | 13.03.2023 | Fee for publishing/printing paid | 13.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2024 | No opposition filed within time limit [2024/19] | Fees paid | Renewal fee | 11.03.2022 | Renewal fee patent year 03 | 24.04.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | IT | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | NO | 31.08.2023 | GR | 01.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | [2024/26] |
Former [2024/25] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/10] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/08] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/03] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/01] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/52] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/51] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/50] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
PL | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/48] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
Former [2023/46] | ES | 31.05.2023 | Documents cited: | Search | [A]US4282953 (LICHTI R D, et al) [A] 1-15 * the whole document *; | [A]US5186289 (WOLNER JAMES T [US], et al) [A] 1-15* the whole document *; | [A]GB2376051 (QM GROUP LTD [GB]) [A] 1-15 * the whole document *; | [A]WO2013047222 (NABTESCO CORP [JP], et al) [A] 1-15 * the whole document *; | [A]EP3088763 (JOHNSON ELECTRIC SA [CH]) [A] 1-15 * the whole document *; | [XYI]US2018135708 (JACOBSON EVAN E [US]) [X] 1,4,8,13 * paragraphs 31 and 43-46 and figures 2 and 3 * [Y] 2,6,7 [I] 5,9,14,15; | [XYI]US2018180116 (HSU SHENG-CHIA [TW]) [X] 10,11 * figures 5A and 5B together with paragraphs 13, 26 and claim 7 * [Y] 2,6,7 [I] 12; | [X]CN108869579 (UNIV EAST CHINA JIAOTONG) [X] 1,13 * figures 1,2,3 and 10 * |