EP3719330 - SCREW WITH DISCONTINUITY AT THE SECTION BETWEEN THREADS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 28.11.2021 | ||
Former | Request for examination was made Status updated on 16.10.2020 | ||
Former | The application has been published Status updated on 04.09.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC, TR | published on 17.07.2024 [2024/29] | Applicant(s) | For:DE
Adolf Würth GmbH & Co. KG Reinhold-Würth-Strasse 12-17 74653 Künzelsau / DE | For:AL
AT
BE
BG
CH
CY
CZ
DK
EE
ES
FI
FR
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Würth International AG Aspermontstrasse 1 7000 Chur / CH | [2020/41] | Inventor(s) | 01 /
Eckert, Rainer Honsbronn 52 97990 Weikersheim / DE | 02 /
Wunderlich, Andreas Lindenweg 3 74635 Kupferzell / DE | [2020/41] | Representative(s) | Dilg, Haeusler, Schindelmann Patentanwaltsgesellschaft mbH Leonrodstraße 58 80636 München / DE | [2020/41] | Application number, filing date | 20170501.9 | 11.12.2015 | [2020/41] | Priority number, date | DE201510100037 | 05.01.2015 Original published format: DE102015100037 | [2020/41] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3719330 | Date: | 07.10.2020 | Language: | DE | [2020/41] | Type: | B1 Patent specification | No.: | EP3719330 | Date: | 30.03.2022 | Language: | DE | [2022/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.09.2020 | Classification | IPC: | F16B25/00 | [2020/41] | CPC: |
F16B25/0015 (EP);
F16B25/0047 (EP);
F16B25/0078 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/47] |
Former [2020/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHRAUBE MIT DISKONTINUITÄT AN ZWISCHENGEWINDEABSCHNITT | [2020/41] | English: | SCREW WITH DISCONTINUITY AT THE SECTION BETWEEN THREADS | [2020/41] | French: | VIS AVEC UNE DISCONTINUITÉ SUR UNE SECTION DE FILETAGE INTERMÉDIAIRE | [2020/41] | Examination procedure | 12.10.2020 | Amendment by applicant (claims and/or description) | 12.10.2020 | Examination requested [2020/47] | 12.10.2020 | Date on which the examining division has become responsible | 29.11.2021 | Communication of intention to grant the patent | 22.02.2022 | Fee for grant paid | 22.02.2022 | Fee for publishing/printing paid | 22.02.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15199631.1 / EP3040563 | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Fees paid | Renewal fee | 21.04.2020 | Renewal fee patent year 03 | 21.04.2020 | Renewal fee patent year 04 | 21.04.2020 | Renewal fee patent year 05 | 24.12.2020 | Renewal fee patent year 06 | 24.12.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.12.2015 | AL | 30.03.2022 | CY | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | IT | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | MC | 30.03.2022 | MK | 30.03.2022 | NL | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | TR | 30.03.2022 | BG | 30.06.2022 | NO | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | GB | 11.12.2022 | IE | 11.12.2022 | LU | 11.12.2022 | BE | 31.12.2022 | [2024/29] |
Former [2024/27] | HU | 11.12.2015 | |
AL | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MK | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
IE | 11.12.2022 | ||
LU | 11.12.2022 | ||
BE | 31.12.2022 | ||
Former [2024/25] | HU | 11.12.2015 | |
AL | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
IE | 11.12.2022 | ||
LU | 11.12.2022 | ||
BE | 31.12.2022 | ||
Former [2024/21] | AL | 30.03.2022 | |
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
IE | 11.12.2022 | ||
LU | 11.12.2022 | ||
BE | 31.12.2022 | ||
Former [2023/49] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
IE | 11.12.2022 | ||
LU | 11.12.2022 | ||
BE | 31.12.2022 | ||
Former [2023/48] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
IE | 11.12.2022 | ||
LU | 11.12.2022 | ||
Former [2023/47] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
GB | 11.12.2022 | ||
LU | 11.12.2022 | ||
Former [2023/38] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
LU | 11.12.2022 | ||
Former [2023/35] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/25] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/44] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | |
NO | 30.06.2022 | Documents cited: | Search | [X]DE54903 (THE AMERICAN SCREW COMPANY IN PROVIDENCE) [X] 1-13 * figure - *; | [A]GB2042120 (GUTSHALL C E) [A] 1-13* figure - *; | [X]DE3615271 (MUELLER THOMAS [DE]) [X] 1,2,4-13 * figures 1,6 *; | [X]EP1892425 (HILTI AG [LI]) [X] 1-13 * figures 1-2 *; | [A]DE202011000982U (YAO CHENG CO [TW]) [A] 1-13 * figure 4 *; | [X]US2013336744 (PHUA CHENG SIONG [SG], et al) [X] 1,2,4-6,8-13 * figures 2,3a,10 * | by applicant | DE8103990U | DE3337534 | US5570983 | EP0589398 | US6669424 | DE10341401 | US2007147973 | DE102010028344 |