EP3738751 - A PORTION UNIT AND METHOD OF MANUFACTURING A PORTION UNIT OF A WASHING AGENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.04.2024 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 19.05.2023 | ||
Former | Grant of patent is intended Status updated on 05.02.2023 | ||
Former | Request for examination was made Status updated on 16.10.2020 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Henkel AG & Co. KGaA Henkelstraße 67 40589 Düsseldorf / DE | [2023/25] |
Former [2020/47] | For all designated states Henkel AG & Co. KGaA Henkelstrasse 67 40589 Düsseldorf / DE | Inventor(s) | 01 /
Meier, Frank Am Steinebrück 17c 40589 Düsseldorf / DE | 02 /
Sunder, Matthias Koblenzer Straße 41 40593 Düsseldorf / DE | [2020/47] | Application number, filing date | 20171557.0 | 27.04.2020 | [2020/47] | Priority number, date | DE201910207162 | 16.05.2019 Original published format: DE102019207162 | [2020/47] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3738751 | Date: | 18.11.2020 | Language: | DE | [2020/47] | Type: | B1 Patent specification | No.: | EP3738751 | Date: | 21.06.2023 | Language: | DE | [2023/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.10.2020 | Classification | IPC: | B29C65/00, B29C69/00, B65B47/00, B65D65/46, B65D81/32, C11D17/04, B65B11/50, B65B51/14, B29C51/26, // B29C65/02, B29C51/08, B29K29/00 | [2023/04] | CPC: |
B29C66/73793 (EP,US);
B65B3/022 (US);
B29C43/003 (US);
B29C43/10 (US);
B29C51/08 (EP);
B29C51/266 (EP);
B29C66/0014 (EP,US);
B29C66/0016 (EP,US);
B29C66/0324 (EP,US);
B29C66/242 (EP,US);
B29C66/24221 (EP);
B29C66/24241 (EP);
B29C66/24244 (EP);
B29C66/244 (EP);
B29C66/433 (EP,US);
B29C66/53461 (EP);
B29C66/54 (EP);
B29C66/71 (EP);
B29C66/83221 (EP);
B29C66/849 (EP);
B29C66/919 (EP,US);
B29C69/00 (EP);
B65B11/50 (EP,US);
B65B3/04 (US);
B65B51/10 (US);
B65B51/14 (EP);
B65B9/023 (US);
B65B9/042 (US);
B65D65/46 (EP,US);
C11D17/042 (US);
C11D17/045 (EP);
B29C65/02 (EP);
B29C66/723 (EP,US);
| C-Set: |
B29C66/71, B29K2029/04 (EP)
|
Former IPC [2020/47] | B29C65/00, B29C69/00, B65B47/00, B65D65/46, B65D81/32, C11D17/04, // B29C65/02, B29C51/08, B29K29/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/47] | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER PORTIONSEINHEIT EINES WASCHMITTELS UND PORTIONSEINHEIT | [2020/47] | English: | A PORTION UNIT AND METHOD OF MANUFACTURING A PORTION UNIT OF A WASHING AGENT | [2020/47] | French: | PROCÉDÉ DE FABRICATION D'UNE PORTION UNITAIRE D'UN DÉTERGENT ET PORTION UNITAIRE | [2020/47] | Examination procedure | 27.04.2020 | Examination requested [2020/47] | 03.12.2020 | Amendment by applicant (claims and/or description) | 06.02.2023 | Communication of intention to grant the patent | 10.05.2023 | Fee for grant paid | 10.05.2023 | Fee for publishing/printing paid | 10.05.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.03.2024 | No opposition filed within time limit [2024/22] | Fees paid | Renewal fee | 25.04.2022 | Renewal fee patent year 03 | 23.03.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 21.06.2023 | DK | 21.06.2023 | EE | 21.06.2023 | ES | 21.06.2023 | FI | 21.06.2023 | HR | 21.06.2023 | LT | 21.06.2023 | LV | 21.06.2023 | NL | 21.06.2023 | PL | 21.06.2023 | RO | 21.06.2023 | RS | 21.06.2023 | SE | 21.06.2023 | SI | 21.06.2023 | SK | 21.06.2023 | SM | 21.06.2023 | NO | 21.09.2023 | GR | 22.09.2023 | IS | 21.10.2023 | PT | 23.10.2023 | [2024/25] |
Former [2024/22] | CZ | 21.06.2023 | |
DK | 21.06.2023 | ||
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/10] | CZ | 21.06.2023 | |
EE | 21.06.2023 | ||
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
PL | 21.06.2023 | ||
RO | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
PT | 23.10.2023 | ||
Former [2024/09] | CZ | 21.06.2023 | |
ES | 21.06.2023 | ||
FI | 21.06.2023 | ||
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
IS | 21.10.2023 | ||
Former [2024/08] | FI | 21.06.2023 | |
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
SK | 21.06.2023 | ||
SM | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2024/03] | FI | 21.06.2023 | |
HR | 21.06.2023 | ||
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2024/01] | HR | 21.06.2023 | |
LT | 21.06.2023 | ||
LV | 21.06.2023 | ||
NL | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/52] | HR | 21.06.2023 | |
NL | 21.06.2023 | ||
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/51] | HR | 21.06.2023 | |
RS | 21.06.2023 | ||
SE | 21.06.2023 | ||
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/50] | SE | 21.06.2023 | |
NO | 21.09.2023 | ||
GR | 22.09.2023 | ||
Former [2023/48] | SE | 21.06.2023 | |
NO | 21.09.2023 | Documents cited: | Search | [A]WO2016055346 (HENKEL AG & CO KGAA [DE]) [A] 1-10* figure 4; claims 7,9 *; | [A]EP3025848 (HENKEL AG & CO KGAA [DE]) [A] 1-10 * paragraph [0015]; figures 1-4; claim 1 * |