EP3725610 - TRACTION AND BRAKING CONTROL SYSTEM FOR A RAILWAY TRAIN SET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.01.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 18.02.2022 | ||
Former | Grant of patent is intended Status updated on 19.10.2021 | ||
Former | Request for examination was made Status updated on 23.04.2021 | ||
Former | The application has been published Status updated on 18.09.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Faiveley Transport Italia S.p.A. Via Volvera 51 10045 Piossasco (TO) / IT | [2022/12] |
Former [2020/43] | For all designated states Faiveley Transport Italia S.p.A. Via Volvera 51 10045 Piossasco (TO) / IT | Inventor(s) | 01 /
TIONE, Roberto Via Garibaldi 4 I-10020 LAURIANO (Torino) / IT | 02 /
GRASSO, Angelo Via Saracco 36 I-14053 CANELLI (Asti) / IT | [2020/43] | Representative(s) | Deambrogi, Edgardo, et al Jacobacci & Partners S.p.A. Corso Emilia 8 10152 Torino / IT | [2020/43] | Application number, filing date | 20172234.5 | 07.10.2016 | [2020/43] | Priority number, date | IT2015UB04278 | 09.10.2015 Original published format: IT UB20154278 | [2020/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3725610 | Date: | 21.10.2020 | Language: | EN | [2020/43] | Type: | B1 Patent specification | No.: | EP3725610 | Date: | 23.03.2022 | Language: | EN | [2022/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.06.2020 | Classification | IPC: | B60T13/66, B60T17/22 | [2020/43] | CPC: |
B60T13/665 (EP,RU,US);
B61L15/009 (US);
B60L15/32 (RU);
B60T17/228 (EP,US);
B61C17/12 (RU);
B61L15/0058 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/21] |
Former [2020/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ZUG- UND BREMSSTEUERUNGSSYSTEM FÜR EINEN EISENBAHNZUGVERBAND | [2020/43] | English: | TRACTION AND BRAKING CONTROL SYSTEM FOR A RAILWAY TRAIN SET | [2020/43] | French: | SYSTÈME DE RÉGLAGE DE TRACTION ET FREINAGE POUR UN CONVOI FERROVIAIRE | [2020/43] | Examination procedure | 20.04.2021 | Amendment by applicant (claims and/or description) | 20.04.2021 | Examination requested [2021/21] | 20.04.2021 | Date on which the examining division has become responsible | 20.10.2021 | Communication of intention to grant the patent | 14.02.2022 | Fee for grant paid | 14.02.2022 | Fee for publishing/printing paid | 14.02.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP16801300.1 / EP3359434 | Opposition(s) | 02.01.2023 | No opposition filed within time limit [2023/09] | Fees paid | Renewal fee | 30.04.2020 | Renewal fee patent year 03 | 30.04.2020 | Renewal fee patent year 04 | 25.08.2020 | Renewal fee patent year 05 | 31.10.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.10.2016 | AL | 23.03.2022 | CY | 23.03.2022 | CZ | 23.03.2022 | DK | 23.03.2022 | EE | 23.03.2022 | ES | 23.03.2022 | FI | 23.03.2022 | HR | 23.03.2022 | LT | 23.03.2022 | LV | 23.03.2022 | MC | 23.03.2022 | MK | 23.03.2022 | NL | 23.03.2022 | RO | 23.03.2022 | RS | 23.03.2022 | SE | 23.03.2022 | SI | 23.03.2022 | SK | 23.03.2022 | SM | 23.03.2022 | TR | 23.03.2022 | BG | 23.06.2022 | NO | 23.06.2022 | GR | 24.06.2022 | IS | 23.07.2022 | PT | 25.07.2022 | GB | 07.10.2022 | IE | 07.10.2022 | LU | 07.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | [2024/29] |
Former [2024/27] | HU | 07.10.2016 | |
AL | 23.03.2022 | ||
CY | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
MK | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
GB | 07.10.2022 | ||
IE | 07.10.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/25] | HU | 07.10.2016 | |
AL | 23.03.2022 | ||
CY | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
GB | 07.10.2022 | ||
IE | 07.10.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/21] | AL | 23.03.2022 | |
CY | 23.03.2022 | ||
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
GB | 07.10.2022 | ||
IE | 07.10.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/48] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
GB | 07.10.2022 | ||
IE | 07.10.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/47] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
GB | 07.10.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/42] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
LU | 07.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/35] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
LU | 07.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/30] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
LU | 07.10.2022 | ||
Former [2023/25] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
MC | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SI | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/07] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
DK | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2023/01] | AL | 23.03.2022 | |
CZ | 23.03.2022 | ||
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/51] | CZ | 23.03.2022 | |
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
IS | 23.07.2022 | ||
PT | 25.07.2022 | ||
Former [2022/49] | CZ | 23.03.2022 | |
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SK | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/48] | CZ | 23.03.2022 | |
EE | 23.03.2022 | ||
ES | 23.03.2022 | ||
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/47] | ES | 23.03.2022 | |
FI | 23.03.2022 | ||
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RO | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
SM | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
PT | 25.07.2022 | ||
Former [2022/44] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
NL | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/39] | FI | 23.03.2022 | |
HR | 23.03.2022 | ||
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/36] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
LV | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
GR | 24.06.2022 | ||
Former [2022/35] | HR | 23.03.2022 | |
LT | 23.03.2022 | ||
RS | 23.03.2022 | ||
SE | 23.03.2022 | ||
BG | 23.06.2022 | ||
NO | 23.06.2022 | ||
Former [2022/33] | LT | 23.03.2022 | |
NO | 23.06.2022 | Documents cited: | Search | [YA]US5950967 (MONTGOMERY STEPHEN R [US]) [Y] 1,2,6 * column 2, line 47 - column 4, line 26; figures 1-3 * [A] 3-5; | [A]DE10249714 (BRAEUTIGAM ANTRIEBS UND TRANSP [DE]) [A] 1-3* paragraph [0021] - paragraph [0031]; figures 1-3 *; | [YA]US2010235022 (SIDDAPPA CHANDRASHEKAR [US], et al) [Y] 1,2,6 * paragraph [0032] - paragraph [0043]; figures 1,2 * [A] 3-5; | [A]DE102012108395 (KNORR BREMSE SYSTEME [DE]) [A] 1-3 * paragraph [0002] - paragraph [0005]; claim 1 * * paragraph [0022] - paragraph [0033]; figures 1,2 * |