blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3725610

EP3725610 - TRACTION AND BRAKING CONTROL SYSTEM FOR A RAILWAY TRAIN SET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  19.10.2021
FormerRequest for examination was made
Status updated on  23.04.2021
FormerThe application has been published
Status updated on  18.09.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Faiveley Transport Italia S.p.A.
Via Volvera 51
10045 Piossasco (TO) / IT
[2022/12]
Former [2020/43]For all designated states
Faiveley Transport Italia S.p.A.
Via Volvera 51
10045 Piossasco (TO) / IT
Inventor(s)01 / TIONE, Roberto
Via Garibaldi 4
I-10020 LAURIANO (Torino) / IT
02 / GRASSO, Angelo
Via Saracco 36
I-14053 CANELLI (Asti) / IT
 [2020/43]
Representative(s)Deambrogi, Edgardo, et al
Jacobacci & Partners S.p.A.
Corso Emilia 8
10152 Torino / IT
[2020/43]
Application number, filing date20172234.507.10.2016
[2020/43]
Priority number, dateIT2015UB0427809.10.2015         Original published format: IT UB20154278
[2020/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3725610
Date:21.10.2020
Language:EN
[2020/43]
Type: B1 Patent specification 
No.:EP3725610
Date:23.03.2022
Language:EN
[2022/12]
Search report(s)(Supplementary) European search report - dispatched on:EP26.06.2020
ClassificationIPC:B60T13/66, B60T17/22
[2020/43]
CPC:
B60T13/665 (EP,RU,US); B61L15/009 (US); B60L15/32 (RU);
B60T17/228 (EP,US); B61C17/12 (RU); B61L15/0058 (US);
B61L15/0094 (US); B60T15/32 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/21]
Former [2020/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ZUG- UND BREMSSTEUERUNGSSYSTEM FÜR EINEN EISENBAHNZUGVERBAND[2020/43]
English:TRACTION AND BRAKING CONTROL SYSTEM FOR A RAILWAY TRAIN SET[2020/43]
French:SYSTÈME DE RÉGLAGE DE TRACTION ET FREINAGE POUR UN CONVOI FERROVIAIRE[2020/43]
Examination procedure20.04.2021Amendment by applicant (claims and/or description)
20.04.2021Examination requested  [2021/21]
20.04.2021Date on which the examining division has become responsible
20.10.2021Communication of intention to grant the patent
14.02.2022Fee for grant paid
14.02.2022Fee for publishing/printing paid
14.02.2022Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP16801300.1  / EP3359434
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
30.04.2020Renewal fee patent year 03
30.04.2020Renewal fee patent year 04
25.08.2020Renewal fee patent year 05
31.10.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.10.2016
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
TR23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
IE07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
[2024/29]
Former [2024/27]HU07.10.2016
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
IE07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/25]HU07.10.2016
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
IE07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/21]AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
IE07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/48]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
IE07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/47]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB07.10.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/42]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU07.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/35]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU07.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/30]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU07.10.2022
Former [2023/25]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/49]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/44]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Documents cited:Search[YA]US5950967  (MONTGOMERY STEPHEN R [US]) [Y] 1,2,6 * column 2, line 47 - column 4, line 26; figures 1-3 * [A] 3-5;
 [A]DE10249714  (BRAEUTIGAM ANTRIEBS UND TRANSP [DE]) [A] 1-3* paragraph [0021] - paragraph [0031]; figures 1-3 *;
 [YA]US2010235022  (SIDDAPPA CHANDRASHEKAR [US], et al) [Y] 1,2,6 * paragraph [0032] - paragraph [0043]; figures 1,2 * [A] 3-5;
 [A]DE102012108395  (KNORR BREMSE SYSTEME [DE]) [A] 1-3 * paragraph [0002] - paragraph [0005]; claim 1 * * paragraph [0022] - paragraph [0033]; figures 1,2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.