EP3708501 - SEAL SYSTEM FOR VARIABLE GEOMETRY GAPS IN AIRCRAFT SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 06.01.2022 | ||
Former | Request for examination was made Status updated on 26.11.2021 | ||
Former | Grant of patent is intended Status updated on 25.07.2021 | ||
Former | Request for examination was made Status updated on 12.02.2021 | ||
Former | The application has been published Status updated on 14.08.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
Former [2020/38] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | Inventor(s) | 01 /
GEORGE, Nevin M. 100 North Riverside Plaza Chicago, IL 60606-1596 / US | [2020/38] | Representative(s) | St Clair Jones, Gregory Arthur Langley, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [2020/38] | Application number, filing date | 20172268.3 | 10.10.2018 | [2020/38] | Priority number, date | US201715788539 | 19.10.2017 Original published format: US201715788539 | [2020/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3708501 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3708501 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.07.2020 | Classification | IPC: | B64D33/04, F02K1/80, F01D11/00 | [2021/30] | CPC: |
B64D33/04 (EP,CN,KR,RU,US);
F02K1/805 (EP,KR,RU,US);
F16J15/061 (RU,US);
B64D27/16 (RU,US);
B64D29/00 (RU,US);
F01D11/003 (EP,RU,US);
|
Former IPC [2020/38] | B64D33/04, F02K1/80 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/11] |
Former [2020/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DICHTUNGSSYSTEM FÜR VARIABLE GEOMETRIEABSTÄNDE IN FLUGZEUGSYSTEMEN | [2020/38] | English: | SEAL SYSTEM FOR VARIABLE GEOMETRY GAPS IN AIRCRAFT SYSTEMS | [2020/38] | French: | SYSTÈME D'ÉTANCHÉITÉ POUR DES ESPACES À GÉOMÉTRIE VARIABLE DANS DES SYSTÈMES D'AÉRONEF | [2020/38] | Examination procedure | 08.02.2021 | Amendment by applicant (claims and/or description) | 08.02.2021 | Examination requested [2021/11] | 08.02.2021 | Date on which the examining division has become responsible | 26.07.2021 | Communication of intention to grant the patent | 25.11.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.01.2022 | Communication of intention to grant the patent | 18.03.2022 | Fee for grant paid | 18.03.2022 | Fee for publishing/printing paid | 18.03.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18199556.4 / EP3473551 | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 27.10.2020 | Renewal fee patent year 03 | 27.10.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.10.2018 | AL | 27.04.2022 | AT | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | TR | 27.04.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | IE | 10.10.2022 | LU | 10.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | [2024/29] |
Former [2024/27] | HU | 10.10.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 10.10.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/25] | HU | 10.10.2018 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 10.10.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/21] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 10.10.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 10.10.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/48] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 10.10.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/42] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
LU | 10.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/35] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
LU | 10.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/30] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
LU | 10.10.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [A]US4098076 (YOUNG JOHN H, et al) [A] 13,14 * the whole document *; | [XA]US4290612 (STEVENS MARTIN L [US]) [X] 13-15 * column 1, line 13 - line 23; figure 8 * [A] 1-12; | [XAY]DE69205901T (GEN ELECTRIC [US]) [X] 13,14 * paragraph [0003]; figure 4 * [A] 5,11,12,15 [Y] 1-4,6-10; | [A]US6702300 (STEINETZ BRUCE M [US], et al) [A] 13,14 * figures 1,2,5,6 *; | [XA] - "DYNAMIC, HIGH-TEMPERATURE, FLEXIBLE SEAL", NTIS TECH NOTES, US DEPARTMENT OF COMMERCE. SPRINGFIELD, VA, US, (19891001), ISSN 0889-8464, page 859, XP000074165 [X] 13,15 * the whole document * [A] 1-12 | [Y] - Unknown, "Federn (1) - tec.Lehrerfreund", (20080822), URL: https://www.lehrerfreund.de/technik/1s/federn-1/3131, (20200709), XP055713508 [Y] 1-4,6-10 * page 2 * |