blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3915747

EP3915747 - QUICK CLAMPING DEVICE, GRANULATING DEVICE WITH SUCH A QUICK CLAMPING DEVICE, CLAMPING METHOD AND TENSIONING LEVER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.01.2024
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  10.02.2023
FormerGrant of patent is intended
Status updated on  03.10.2022
FormerRequest for examination was made
Status updated on  03.06.2022
FormerThe application has been published
Status updated on  29.10.2021
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): BE, FR
published on 19.06.2024  [2024/25]
Applicant(s)For all designated states
Nordson Corporation
28601 Clemens Road
Westlake, OH 44145-1119 / US
[2021/48]
Inventor(s)01 / Schnellbach, Nikolai
48308 Senden / DE
 [2021/48]
Representative(s)Eisenführ Speiser
Patentanwälte Rechtsanwälte PartGmbB
Postfach 10 60 78
28060 Bremen / DE
[2021/48]
Application number, filing date20176919.727.05.2020
[2021/48]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3915747
Date:01.12.2021
Language:DE
[2021/48]
Type: B1 Patent specification 
No.:EP3915747
Date:15.03.2023
Language:DE
[2023/11]
Search report(s)(Supplementary) European search report - dispatched on:EP18.01.2021
ClassificationIPC:B29B9/06, E05C19/14, // B29C48/00, B29C48/25
[2022/42]
CPC:
B29B9/065 (EP,US); F16B2/185 (US); E05C19/14 (EP);
B29C48/0022 (EP); B29C48/256 (EP)
Former IPC [2021/48]B29B9/06, E05C19/14, B01J2/20, F16B2/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/27]
Former [2021/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHNELLSPANNVORRICHTUNG, GRANULIERVORRICHTUNG MIT EINER SOLCHEN SCHNELLSPANNVORRICHTUNG, BETREFFENDES VERSPANNVERFAHREN UND SPANNHEBEL[2021/48]
English:QUICK CLAMPING DEVICE, GRANULATING DEVICE WITH SUCH A QUICK CLAMPING DEVICE, CLAMPING METHOD AND TENSIONING LEVER[2021/48]
French:DISPOSITIF DE SERRAGE RAPIDE, DISPOSITIF DE GRANULATION DOTÉ D'UN TEL DISPOSITIF DE SERRAGE RAPIDE, PROCÉDÉ DE SERRAGE ASSOCIÉ ET LEVIER DE SERRAGE[2021/48]
Examination procedure01.06.2022Amendment by applicant (claims and/or description)
01.06.2022Examination requested  [2022/27]
01.06.2022Date on which the examining division has become responsible
04.10.2022Communication of intention to grant the patent
02.02.2023Fee for grant paid
02.02.2023Fee for publishing/printing paid
02.02.2023Receipt of the translation of the claim(s)
Opposition(s)18.12.2023No opposition filed within time limit [2024/08]
Fees paidRenewal fee
25.05.2022Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ15.03.2023
DK15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
MC15.03.2023
NL15.03.2023
PL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SI15.03.2023
SK15.03.2023
SM15.03.2023
IE27.05.2023
LU27.05.2023
BE31.05.2023
FR31.05.2023
NO15.06.2023
GR16.06.2023
IS15.07.2023
PT17.07.2023
[2024/25]
Former [2024/21]CZ15.03.2023
DK15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
MC15.03.2023
NL15.03.2023
PL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SI15.03.2023
SK15.03.2023
SM15.03.2023
IE27.05.2023
LU27.05.2023
NO15.06.2023
GR16.06.2023
IS15.07.2023
PT17.07.2023
Former [2024/10]CZ15.03.2023
DK15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
MC15.03.2023
NL15.03.2023
PL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SI15.03.2023
SK15.03.2023
SM15.03.2023
LU27.05.2023
NO15.06.2023
GR16.06.2023
IS15.07.2023
PT17.07.2023
Former [2024/08]CZ15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
MC15.03.2023
NL15.03.2023
PL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SK15.03.2023
SM15.03.2023
LU27.05.2023
NO15.06.2023
GR16.06.2023
IS15.07.2023
PT17.07.2023
Former [2023/50]CZ15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
NL15.03.2023
PL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SK15.03.2023
SM15.03.2023
NO15.06.2023
GR16.06.2023
IS15.07.2023
PT17.07.2023
Former [2023/49]CZ15.03.2023
EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
NL15.03.2023
RO15.03.2023
RS15.03.2023
SE15.03.2023
SM15.03.2023
NO15.06.2023
GR16.06.2023
PT17.07.2023
Former [2023/48]EE15.03.2023
ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
NL15.03.2023
RS15.03.2023
SE15.03.2023
SM15.03.2023
NO15.06.2023
GR16.06.2023
PT17.07.2023
Former [2023/46]ES15.03.2023
FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
NL15.03.2023
RS15.03.2023
SE15.03.2023
SM15.03.2023
NO15.06.2023
GR16.06.2023
PT17.07.2023
Former [2023/38]FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
NL15.03.2023
RS15.03.2023
SE15.03.2023
NO15.06.2023
GR16.06.2023
Former [2023/37]FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
RS15.03.2023
SE15.03.2023
NO15.06.2023
GR16.06.2023
Former [2023/36]FI15.03.2023
HR15.03.2023
LT15.03.2023
LV15.03.2023
RS15.03.2023
SE15.03.2023
NO15.06.2023
Former [2023/35]HR15.03.2023
LT15.03.2023
RS15.03.2023
NO15.06.2023
Former [2023/34]LT15.03.2023
RS15.03.2023
Former [2023/33]LT15.03.2023
Documents cited:Search[XY]DE4116933  (WERNER & PFLEIDERER [DE]) [X] 1-11,16-27 * column 1, lines 3-5 * * column 2, line 53 - column 4, line 6 * * figures 1-3; claims 1-7 * * abstract * [Y] 12-15;
 [A]DE102009057781  (AUTOMATIK PLASTICS MACHINERY [DE]) [A] 1-27 * abstract *;
 [XY]CN103273586  (ZHANGJIAGANG CITY YILI MACHINERY CO LTD) [X] 1-11,16-27 * paragraphs [0002] , [0015] - [0018] * * figures 1,2; claims 1-5 * [Y] 12-15;
 [Y]FR3025845  (EVEILLE MARC JACQUES [FR]) [Y] 12,15 * page 2, lines 37-40 * * figures 1,2; claims 1-3 * * abstract *;
 [Y]EP3050839  (JUNGHEINRICH AG [DE]) [Y] 13,14 * paragraphs [0001] , [0015] , [0026] , [0027] * * figures 1-6; claims 1-7 * * abstract *;
 [XY]CN208392593U  (NANJING YONGJIE CHEMICAL MACHINERY MFG CO LTD) [X] 1-11,16-27 * paragraphs [0001] , [0006] - [0027] - [0035] - [0045] * * figures 1-4; claims 1-8 * [Y] 12-15;
 [A]EP3511139  (NORDSON CORP [US]) [A] 1-27* abstract *;
 [XY]CN209320046U  (WUXI SANXI GUM BASE MFT CO LTD) [X] 1-11,16-27 * paragraphs [0001] , [0006] - [0027] - [0034] - [0045] * * figures 1-3; claims 1-8 * [Y] 12-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.