blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3919265

EP3919265 - EXTERIOR WALL SEGMENT FOR A RAILWAY VEHICLE, RAILWAY VEHICLE AND METHOD FOR MANUFACTURING AN EXTERIOR WALL SEGMENT [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  24.03.2023
Database last updated on 19.10.2024
FormerRequest for examination was made
Status updated on  10.06.2022
FormerThe application has been published
Status updated on  05.11.2021
Most recent event   Tooltip11.06.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Deutsches Zentrum für Luft- und Raumfahrt e.V.
Linder Höhe
51147 Köln / DE
For all designated states
ALSTOM Holdings
48 rue Albert Dhalenne
93400 Saint-Ouen-sur-Seine / FR
[2024/09]
Former [2021/49]For all designated states
Deutsches Zentrum für Luft- und Raumfahrt e.V.
Linder Höhe
51147 Köln / DE
For all designated states
ALSTOM Transport Deutschland GmbH
Linke-Hofmann-Busch-Strasse 1
38239 Salzgitter / DE
Inventor(s)01 / Beeh, Elmar
76307 Karlsbad / DE
02 / Käse, David
70199 Stuttgart / DE
03 / Piazza, Giovanni
72108 Ergenzingen / DE
04 / Boese, Ben
38239 Salzgitter / DE
05 / Albert, Torsten
38239 Salzgitter / DE
 [2021/49]
Representative(s)DTS Patent- und Rechtsanwälte PartmbB
Brienner Straße 1
80333 München / DE
[N/P]
Former [2021/49]Hoeger, Stellrecht & Partner Patentanwälte mbB
Uhlandstrasse 14c
70182 Stuttgart / DE
Application number, filing date20178594.605.06.2020
[2021/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3919265
Date:08.12.2021
Language:EN
[2021/49]
Search report(s)(Supplementary) European search report - dispatched on:EP20.11.2020
ClassificationIPC:B32B1/00, B32B7/08, B32B7/12, B32B7/03, B32B15/10, B32B15/18, B32B15/20, B32B19/02, B32B19/04, B32B21/02, B32B21/04, B61D17/04, B61D17/06, B61D17/08, B32B21/00
[2021/49]
CPC:
B32B1/00 (EP); B32B15/10 (EP); B32B15/18 (EP);
B32B15/20 (EP); B32B19/02 (EP); B32B19/042 (EP);
B32B21/00 (EP); B32B21/02 (EP); B32B21/042 (EP);
B32B7/03 (EP); B32B7/08 (EP); B32B7/12 (EP);
B61D17/041 (EP); B61D17/08 (EP); B32B2250/03 (EP);
B32B2250/05 (EP); B32B2260/021 (EP); B32B2260/026 (EP);
B32B2260/046 (EP); B32B2262/067 (EP); B32B2262/106 (EP);
B32B2307/102 (EP); B32B2307/304 (EP); B32B2307/54 (EP);
B32B2307/718 (EP); B32B2605/10 (EP); B32B2607/00 (EP);
Y02T30/00 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/28]
Former [2021/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:AUSSENWANDSEGMENT FÜR EIN SCHIENENFAHRZEUG, SCHIENENFAHRZEUG UND VERFAHREN ZUR HERSTELLUNG EINES AUSSENWANDSEGMENTS[2021/49]
English:EXTERIOR WALL SEGMENT FOR A RAILWAY VEHICLE, RAILWAY VEHICLE AND METHOD FOR MANUFACTURING AN EXTERIOR WALL SEGMENT[2021/49]
French:SEGMENT DE PAROI EXTÉRIEURE POUR UN VÉHICULE FERROVIAIRE, VÉHICULE FERROVIAIRE ET PROCÉDÉ DE FABRICATION D'UN SEGMENT DE PAROI EXTÉRIEURE[2021/49]
Examination procedure08.06.2022Amendment by applicant (claims and/or description)
08.06.2022Examination requested  [2022/28]
08.06.2022Date on which the examining division has become responsible
24.03.2023Despatch of a communication from the examining division (Time limit: M06)
25.10.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
18.12.2023Reply to a communication from the examining division
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
18.12.2023Request for further processing filed
18.12.2023Full payment received (date of receipt of payment)
Request granted
03.01.2024Decision despatched
Fees paidRenewal fee
10.05.2022Renewal fee patent year 03
09.06.2023Renewal fee patent year 04
11.06.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]EP1104374  (DAIMLER CHRYSLER AG [DE]) [X] 1,2,5-9,12,13,15 * paragraphs [0018] , [0 20] * * figures 1,2 * * claims 1, 4, 7, 8 * [A] 4,10,11 [I] 3,14;
 [XAI]WO02058926  (BOMBARDIER TRANSP GMBH [DE], et al) [X] 1,5-9,15 * page 4, lines 14-15 * * page 4, lines 20-23 * * page 6, lines 3-4 * * figure 3 * * page 1; claim 1 * [A] 4,10,11 [I] 2,3,12-14;
 [A]WO2012149634  (D ABBADIE D ARRAST MICHEL-ARNAUD [CA], et al) [A] 4 * paragraphs [0068] , [0 69] ** figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.