EP3919265 - EXTERIOR WALL SEGMENT FOR A RAILWAY VEHICLE, RAILWAY VEHICLE AND METHOD FOR MANUFACTURING AN EXTERIOR WALL SEGMENT [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 24.03.2023 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 10.06.2022 | ||
Former | The application has been published Status updated on 05.11.2021 | Most recent event Tooltip | 11.06.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Deutsches Zentrum für Luft- und Raumfahrt e.V. Linder Höhe 51147 Köln / DE | For all designated states ALSTOM Holdings 48 rue Albert Dhalenne 93400 Saint-Ouen-sur-Seine / FR | [2024/09] |
Former [2021/49] | For all designated states Deutsches Zentrum für Luft- und Raumfahrt e.V. Linder Höhe 51147 Köln / DE | ||
For all designated states ALSTOM Transport Deutschland GmbH Linke-Hofmann-Busch-Strasse 1 38239 Salzgitter / DE | Inventor(s) | 01 /
Beeh, Elmar 76307 Karlsbad / DE | 02 /
Käse, David 70199 Stuttgart / DE | 03 /
Piazza, Giovanni 72108 Ergenzingen / DE | 04 /
Boese, Ben 38239 Salzgitter / DE | 05 /
Albert, Torsten 38239 Salzgitter / DE | [2021/49] | Representative(s) | DTS Patent- und Rechtsanwälte PartmbB Brienner Straße 1 80333 München / DE | [N/P] |
Former [2021/49] | Hoeger, Stellrecht & Partner Patentanwälte mbB Uhlandstrasse 14c 70182 Stuttgart / DE | Application number, filing date | 20178594.6 | 05.06.2020 | [2021/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3919265 | Date: | 08.12.2021 | Language: | EN | [2021/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.11.2020 | Classification | IPC: | B32B1/00, B32B7/08, B32B7/12, B32B7/03, B32B15/10, B32B15/18, B32B15/20, B32B19/02, B32B19/04, B32B21/02, B32B21/04, B61D17/04, B61D17/06, B61D17/08, B32B21/00 | [2021/49] | CPC: |
B32B1/00 (EP);
B32B15/10 (EP);
B32B15/18 (EP);
B32B15/20 (EP);
B32B19/02 (EP);
B32B19/042 (EP);
B32B21/00 (EP);
B32B21/02 (EP);
B32B21/042 (EP);
B32B7/03 (EP);
B32B7/08 (EP);
B32B7/12 (EP);
B61D17/041 (EP);
B61D17/08 (EP);
B32B2250/03 (EP);
B32B2250/05 (EP);
B32B2260/021 (EP);
B32B2260/026 (EP);
B32B2260/046 (EP);
B32B2262/067 (EP);
B32B2262/106 (EP);
B32B2307/102 (EP);
B32B2307/304 (EP);
B32B2307/54 (EP);
B32B2307/718 (EP);
B32B2605/10 (EP);
B32B2607/00 (EP);
Y02T30/00 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/28] |
Former [2021/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | AUSSENWANDSEGMENT FÜR EIN SCHIENENFAHRZEUG, SCHIENENFAHRZEUG UND VERFAHREN ZUR HERSTELLUNG EINES AUSSENWANDSEGMENTS | [2021/49] | English: | EXTERIOR WALL SEGMENT FOR A RAILWAY VEHICLE, RAILWAY VEHICLE AND METHOD FOR MANUFACTURING AN EXTERIOR WALL SEGMENT | [2021/49] | French: | SEGMENT DE PAROI EXTÉRIEURE POUR UN VÉHICULE FERROVIAIRE, VÉHICULE FERROVIAIRE ET PROCÉDÉ DE FABRICATION D'UN SEGMENT DE PAROI EXTÉRIEURE | [2021/49] | Examination procedure | 08.06.2022 | Amendment by applicant (claims and/or description) | 08.06.2022 | Examination requested [2022/28] | 08.06.2022 | Date on which the examining division has become responsible | 24.03.2023 | Despatch of a communication from the examining division (Time limit: M06) | 25.10.2023 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 18.12.2023 | Reply to a communication from the examining division | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 18.12.2023 | Request for further processing filed | 18.12.2023 | Full payment received (date of receipt of payment) Request granted | 03.01.2024 | Decision despatched | Fees paid | Renewal fee | 10.05.2022 | Renewal fee patent year 03 | 09.06.2023 | Renewal fee patent year 04 | 11.06.2024 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XAI]EP1104374 (DAIMLER CHRYSLER AG [DE]) [X] 1,2,5-9,12,13,15 * paragraphs [0018] , [0 20] * * figures 1,2 * * claims 1, 4, 7, 8 * [A] 4,10,11 [I] 3,14; | [XAI]WO02058926 (BOMBARDIER TRANSP GMBH [DE], et al) [X] 1,5-9,15 * page 4, lines 14-15 * * page 4, lines 20-23 * * page 6, lines 3-4 * * figure 3 * * page 1; claim 1 * [A] 4,10,11 [I] 2,3,12-14; | [A]WO2012149634 (D ABBADIE D ARRAST MICHEL-ARNAUD [CA], et al) [A] 4 * paragraphs [0068] , [0 69] ** figure 1 * |