blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3756899

EP3756899 - CONTAINER AND TAPE RIBBON SET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.03.2024
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  31.03.2023
FormerGrant of patent is intended
Status updated on  14.12.2022
FormerRequest for examination was made
Status updated on  23.04.2021
FormerThe application has been published
Status updated on  27.11.2020
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Seiko Epson Corporation
1-6, Shinjuku 4-chome
Shinjuku-ku
Tokyo 160-8801 / JP
[2021/01]
Inventor(s)01 / YANAGISAWA, Atsushi
c/o Seiko Epson Corporation
3-5 Owa 3-chome
Suwa-shi, Nagano 392-8502 / JP
02 / ISHIMOTO, Akio
c/o Seiko Epson Corporation
3-5 Owa 3-chome
Suwa-shi, Nagano 392-8502 / JP
03 / BIZEN, Mizuki
c/o Seiko Epson Corporation
3-5 Owa 3-chome
Suwa-shi, Nagano 392-8502 / JP
 [2021/01]
Representative(s)Lewis Silkin LLP
Arbor
255 Blackfriars Road
London SE1 9AX / GB
[N/P]
Former [2021/01]Miller Sturt Kenyon
9 John Street
London WC1N 2ES / GB
Application number, filing date20180675.918.06.2020
[2021/01]
Priority number, dateJP2019011353919.06.2019         Original published format: JP 2019113539
JP2019014721709.08.2019         Original published format: JP 2019147217
[2021/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3756899
Date:30.12.2020
Language:EN
[2020/53]
Type: B1 Patent specification 
No.:EP3756899
Date:03.05.2023
Language:EN
[2023/18]
Search report(s)(Supplementary) European search report - dispatched on:EP26.11.2020
ClassificationIPC:B41J17/32, B41J15/04, B41J32/00, B65D83/08
[2021/01]
CPC:
B41J17/32 (EP); B41J3/4075 (KR); B41J15/044 (EP,CN,KR,US);
B41J15/02 (US); B41J29/13 (US); B41J32/00 (EP,CN,US);
B41J32/02 (KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/21]
Former [2021/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEHÄLTER UND TAPE-BAND-KASSETTE[2021/01]
English:CONTAINER AND TAPE RIBBON SET[2021/01]
French:RÉCIPIENT ET ENSEMBLE DE RUBAN DE BANDE[2021/01]
Examination procedure19.04.2021Amendment by applicant (claims and/or description)
19.04.2021Examination requested  [2021/21]
19.04.2021Date on which the examining division has become responsible
15.12.2022Communication of intention to grant the patent
21.03.2023Fee for grant paid
21.03.2023Fee for publishing/printing paid
21.03.2023Receipt of the translation of the claim(s)
Opposition(s)06.02.2024No opposition filed within time limit [2024/15]
Fees paidRenewal fee
07.06.2022Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
IT03.05.2023
LT03.05.2023
LV03.05.2023
MC03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SI03.05.2023
SK03.05.2023
SM03.05.2023
IE18.06.2023
LU18.06.2023
BE30.06.2023
CH30.06.2023
FR03.07.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
[2024/26]
Former [2024/25]AT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
MC03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SI03.05.2023
SK03.05.2023
SM03.05.2023
IE18.06.2023
LU18.06.2023
BE30.06.2023
CH30.06.2023
FR03.07.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/21]AT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
MC03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SK03.05.2023
SM03.05.2023
IE18.06.2023
LU18.06.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/15]AT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
MC03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SK03.05.2023
SM03.05.2023
LU18.06.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/14]AT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
MC03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SK03.05.2023
SM03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/10]AT03.05.2023
CZ03.05.2023
DK03.05.2023
EE03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
NL03.05.2023
PL03.05.2023
RO03.05.2023
RS03.05.2023
SE03.05.2023
SK03.05.2023
SM03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/08]AT03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
NL03.05.2023
PL03.05.2023
RS03.05.2023
SE03.05.2023
SK03.05.2023
SM03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/03]AT03.05.2023
ES03.05.2023
FI03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
NL03.05.2023
PL03.05.2023
RS03.05.2023
SE03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2024/01]AT03.05.2023
ES03.05.2023
HR03.05.2023
LT03.05.2023
LV03.05.2023
NL03.05.2023
PL03.05.2023
RS03.05.2023
SE03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2023/51]AT03.05.2023
ES03.05.2023
HR03.05.2023
NL03.05.2023
PL03.05.2023
RS03.05.2023
SE03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2023/50]AT03.05.2023
ES03.05.2023
NL03.05.2023
PL03.05.2023
SE03.05.2023
NO03.08.2023
GR04.08.2023
IS03.09.2023
PT04.09.2023
Former [2023/48]AT03.05.2023
ES03.05.2023
NL03.05.2023
SE03.05.2023
NO03.08.2023
PT04.09.2023
Former [2023/46]ES03.05.2023
PT04.09.2023
Documents cited:Search[Y]US3948455  (SCHWARTZ RICHARD J) [Y] 1,2,5,6,8,9 * column 4, line 10 - line 38; figure 6 *;
 [A]US4360278  (PAQUE MICHAEL W) [A] 1-9* column 6, line 18 - line 45; figure 7 *;
 [AD]JPH0839878  (MAX CO LTD) [AD] 1-9 * abstract *;
 [YA]JPH09216444  (SEIKO EPSON CORP) [Y] 1,2,5,6,8,9 * abstract * [A] 3,4,7
by applicantJPH0839878
 JP20190113539
 JP20190147217
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.