EP3741914 - MACHINE TRAIN CONSISTING OF A ROAD MILLING MACHINE AND A PAVER AND METHOD FOR OPERATING A ROAD MILLING MACHINE AND A PAVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 02.01.2022 | ||
Former | Request for examination was made Status updated on 23.10.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Wirtgen GmbH Reinhard-Wirtgen-Strasse 2 53578 Windhagen / DE | [2020/48] | Inventor(s) | 01 /
MENZENBACH, Christoph Panau 6 53577 Neustadt (Wied) / DE | 02 /
MÜLLER, René Michaelstr. 4a 53560 Vettelschoß / DE | 03 /
BARIMANI, Cyrus Kantering 37 53639 Königswinter / DE | [2020/48] | Representative(s) | Oppermann, Frank OANDO Oppermann & Oppermann Wilhelminenstrasse 1a 65193 Wiesbaden / DE | [N/P] |
Former [2020/48] | Oppermann, Frank OANDO Oppermann & Oppermann LLP Wilhelminenstrasse 1a 65193 Wiesbaden / DE | Application number, filing date | 20180921.7 | 18.05.2018 | [2020/48] | Priority number, date | DE20171005015 | 26.05.2017 Original published format: DE102017005015 | [2020/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3741914 | Date: | 25.11.2020 | Language: | DE | [2020/48] | Type: | B1 Patent specification | No.: | EP3741914 | Date: | 27.04.2022 | Language: | DE | [2022/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.10.2020 | Classification | IPC: | E01C23/088, E01C19/48, E01C19/00 | [2020/48] | CPC: |
E01C23/088 (EP,CN,US);
E01C19/004 (EP,US);
E01C19/006 (US);
E01C19/48 (EP,US);
E01C19/4866 (CN);
E01C23/01 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/48] | Title | German: | MASCHINENZUG AUS EINER STRASSENFRÄSMASCHINE UND EINEM STRASSENFERTIGER UND VERFAHREN ZUM BETREIBEN EINER STRASSENFRÄSMASCHINE UND EINES STRASSENFERTIGERS | [2020/48] | English: | MACHINE TRAIN CONSISTING OF A ROAD MILLING MACHINE AND A PAVER AND METHOD FOR OPERATING A ROAD MILLING MACHINE AND A PAVER | [2020/48] | French: | TRAIN DE MACHINES COMPRENANT UNE FRAISEUSE ROUTIÈRE ET UNE FINISSEUSE DE ROUTE ET PROCÉDÉ DE FONCTIONNEMENT D'UNE FRAISEUSE ROUTIÈRE ET D'UNE FINISSEUSE DE ROUTE | [2022/02] |
Former [2020/48] | TRAIN DE MACHINE D'UNE FRAISEUSE ROUTIÈRE ET D'UNE FINISSEUSE DE ROUTE ET PROCÉDÉ DE PONCTIONNEMENT D'UNE FRAISEUSE ROUTIÈRE ET D'UNE FINISSEUSE DE ROUTE | Examination procedure | 18.06.2020 | Examination requested [2020/48] | 20.04.2021 | Amendment by applicant (claims and/or description) | 03.01.2022 | Communication of intention to grant the patent | 22.03.2022 | Fee for grant paid | 22.03.2022 | Fee for publishing/printing paid | 22.03.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18173127.4 / EP3406799 | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 18.06.2020 | Renewal fee patent year 03 | 21.05.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.05.2018 | AL | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | TR | 27.04.2022 | IE | 18.05.2022 | LU | 18.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/29] |
Former [2024/25] | HU | 18.05.2018 | |
AL | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 18.05.2022 | ||
LU | 18.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/23] | AL | 27.04.2022 | |
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 18.05.2022 | ||
LU | 18.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/20] | AL | 27.04.2022 | |
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 18.05.2022 | ||
LU | 18.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 18.05.2022 | ||
LU | 18.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/20] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 18.05.2022 | ||
LU | 18.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 18.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | CZ | 27.04.2022 | |
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 18.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/08] | DK | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
LU | 18.05.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | DK | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | FI | 27.04.2022 | |
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | FI | 27.04.2022 | |
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | FI | 27.04.2022 | |
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | FI | 27.04.2022 | |
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [A]EP1959056 (WIRTGEN GMBH [DE]) [A] 1-20 * paragraphs [0001] , [0004] , [0005] , [0010] , [0013] , [0015] , [0016] , [0017] , [0035] - [0037] - [0047] , [0049] , [0063] , [0070] * * figures 1-2 *; | [XAI]US2009317186 (GLEE KATHERINE C [US], et al) [X] 1-4,8,13-15 * paragraphs [0001] , [0002] , [0007] , [0012] - [0017] - [0025] , [0028] , [0031] * * figures 1,2 * [A] 9,10,19 [I] 5-7,11,12,16-18,20; | [A]DE102016006006 (CATERPILLAR PAVING PRODUCTS INC [US]) [A] 1-20 * paragraphs [0001] , [0008] , [0015] , [0016] , [0028] , [0048] , [0049] , [0069] * * figures 1,3; claim 1 *; | [AP]WO2017100312 (CATERPILLAR PAVING PRODUCTS INC [US]) [AP] 1-20* the whole document * | by applicant | EP0542297 | EP0542378 | DE102006020293 |