EP3780545 - FLOW SPECIFICATION PROTOCOL-BASED COMMUNICATIONS METHOD, AND DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.03.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 07.04.2023 | ||
Former | Grant of patent is intended Status updated on 01.12.2022 | ||
Former | Examination is in progress Status updated on 18.11.2022 | ||
Former | Grant of patent is intended Status updated on 14.07.2022 | ||
Former | Examination is in progress Status updated on 15.04.2022 | ||
Former | Request for examination was made Status updated on 15.01.2021 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT, SI | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2021/07] | Inventor(s) | 01 /
LI, Zhenbin HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
ZHUANG, Shunwan HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 03 /
CHEN, Xia HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 04 /
WU, Nan HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 05 /
LIANG, Qiandeng HUAWEI TECHNOLOGIES CO., LTD. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2021/07] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [2023/19] |
Former [2021/07] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | Application number, filing date | 20181581.8 | 16.03.2017 | [2021/07] | Priority number, date | CN201610160664 | 21.03.2016 Original published format: CN201610160664 | [2021/07] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3780545 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Type: | B1 Patent specification | No.: | EP3780545 | Date: | 10.05.2023 | Language: | EN | [2023/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.11.2020 | Classification | IPC: | H04L9/40, H04L12/46 | [2022/16] | CPC: |
H04L12/4641 (EP,CN,US);
H04L69/03 (CN,US);
H04L45/04 (US);
H04L12/4645 (EP);
H04L45/54 (US);
H04L45/586 (US);
H04L45/64 (US);
H04L69/06 (CN);
H04L69/325 (CN);
H04L9/40 (US)
(-)
|
Former IPC [2021/07] | H04L29/06, // H04L12/713, H04L12/715, H04L12/741, H04L12/46 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/07] | Title | German: | AUF FLUSSSPEZIFIKATIONSPROTOKOLL BASIERENDES KOMMUNIKATIONSVERFAHREN, UND -VORRICHTUNG | [2021/07] | English: | FLOW SPECIFICATION PROTOCOL-BASED COMMUNICATIONS METHOD, AND DEVICE | [2021/07] | French: | PROCÉDÉ ET DISPOSITIF DE COMMUNICATION BASÉS SUR UN PROTOCOLE DE SPÉCIFICATION DE FLUX | [2021/07] | Examination procedure | 23.06.2020 | Examination requested [2021/07] | 06.08.2021 | Amendment by applicant (claims and/or description) | 26.04.2022 | Despatch of a communication from the examining division (Time limit: M02) | 20.06.2022 | Reply to a communication from the examining division | 15.07.2022 | Communication of intention to grant the patent | 08.09.2022 | Fee for grant paid | 08.09.2022 | Fee for publishing/printing paid | 18.11.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.12.2022 | Communication of intention to grant the patent | 13.03.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17769372.8 / EP3422660 | Divisional application(s) | EP22211033.0 / EP4213449 | Opposition(s) | 13.02.2024 | No opposition filed within time limit [2024/16] | Fees paid | Renewal fee | 23.06.2020 | Renewal fee patent year 03 | 23.06.2020 | Renewal fee patent year 04 | 29.03.2021 | Renewal fee patent year 05 | 30.03.2022 | Renewal fee patent year 06 | 31.03.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 10.05.2023 | CZ | 10.05.2023 | DK | 10.05.2023 | EE | 10.05.2023 | ES | 10.05.2023 | FI | 10.05.2023 | HR | 10.05.2023 | IT | 10.05.2023 | LT | 10.05.2023 | LV | 10.05.2023 | NL | 10.05.2023 | PL | 10.05.2023 | RO | 10.05.2023 | RS | 10.05.2023 | SE | 10.05.2023 | SI | 10.05.2023 | SK | 10.05.2023 | SM | 10.05.2023 | NO | 10.08.2023 | GR | 11.08.2023 | IS | 10.09.2023 | PT | 11.09.2023 | [2024/26] |
Former [2024/10] | AT | 10.05.2023 | |
CZ | 10.05.2023 | ||
DK | 10.05.2023 | ||
EE | 10.05.2023 | ||
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RO | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/08] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/03] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/01] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/51] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
HR | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/50] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/48] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
NL | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
PT | 11.09.2023 | ||
Former [2023/46] | ES | 10.05.2023 | |
PT | 11.09.2023 | Documents cited: | Search | [IA] - LUCY S ZHUANG W HAO HUAWEI TECHNOLOGIES Y, "BGP Flowspec Redirect to VPN RD Extended Community; draft-yong-idr-flowspec-redirect-vpn-rd-00.txt", BGP FLOWSPEC REDIRECT TO VPN RD EXTENDED COMMUNITY; DRAFT-YONG-IDR-FLOWSPEC-REDIRECT-VPN-RD-00.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20160317), pages 1 - 9, XP015111828 [I] 1-3,9-11,17-19,24-26 * page 4 - page 7 * [A] 4-8,12-16,20-23,27-30 | [A] - MARQUES CISCO SYSTEMS N SHETH JUNIPER NETWORKS R RASZUK CISCO SYSTEMS B GREENE JUNIPER NETWORKS J MAUCH NTT AMERICA D MCPHERSON AR, "Dissemination of Flow Specification Rules; rfc5575.txt", DISSEMINATION OF FLOW SPECIFICATION RULES; RFC5575.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20090801), XP015065653 [A] 1-30 * page 7 - page 12 * |