EP3745798 - A RESOURCE ALLOCATION METHOD, APPARATUS, SYSTEM AND COMPUTER STORAGE MEDIUM [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 13.01.2023 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 04.06.2021 | ||
Former | The application has been published Status updated on 30.10.2020 | Most recent event Tooltip | 16.10.2024 | Change - representative | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [N/P] |
Former [2020/49] | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan shenzhen Guangdong 518057 / CN | Inventor(s) | 01 /
CHEN, Lin ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong, 518057 / CN | 02 /
LI, Dapeng ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong, 518057 / CN | 03 /
HUANG, Ying ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong, 518057 / CN | 04 /
WU, Shuanshuan ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong, 518057 / CN | [2020/49] | Representative(s) | Aipex B.V. Vestdijk 51 5611 CA Eindhoven / NL | [N/P] |
Former [2020/49] | Gevers Patents Intellectual Property House Holidaystraat 5 1831 Diegem / BE | Application number, filing date | 20186208.3 | 28.08.2014 | [2020/49] | Priority number, date | CN20141043224 | 29.01.2014 Original published format: CN201410043224 | [2020/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3745798 | Date: | 02.12.2020 | Language: | EN | [2020/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.08.2020 | Classification | IPC: | H04W72/12, H04W76/14 | [2020/49] | CPC: |
H04W76/14 (EP,US);
H04W72/04 (CN,US);
H04W72/20 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/27] |
Former [2020/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RESSOURCENZUWEISUNGSVERFAHREN, VORRICHTUNG, SYSTEM UND COMPUTERSPEICHERMEDIUM | [2020/49] | English: | A RESOURCE ALLOCATION METHOD, APPARATUS, SYSTEM AND COMPUTER STORAGE MEDIUM | [2020/49] | French: | PROCÉDÉ, APPAREIL ET SYSTÈME D'ATTRIBUTION DE RESSOURCE ET SUPPORT D'INFORMATIONS INFORMATIQUE | [2020/49] | Examination procedure | 01.06.2021 | Examination requested [2021/27] | 01.06.2021 | Date on which the examining division has become responsible | 02.06.2021 | Amendment by applicant (claims and/or description) | 17.01.2023 | Despatch of a communication from the examining division (Time limit: M04) | 17.05.2023 | Reply to a communication from the examining division | Parent application(s) Tooltip | EP14880686.2 / EP3101969 | Fees paid | Renewal fee | 16.07.2020 | Renewal fee patent year 03 | 16.07.2020 | Renewal fee patent year 04 | 16.07.2020 | Renewal fee patent year 05 | 16.07.2020 | Renewal fee patent year 06 | 16.07.2020 | Renewal fee patent year 07 | 14.07.2021 | Renewal fee patent year 08 | 13.07.2022 | Renewal fee patent year 09 | 17.07.2023 | Renewal fee patent year 10 | 11.07.2024 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [Y]US2013287012 (PRAGADA RAVIKUMAR V [US], et al) [Y] 3-5 * paragraphs [0084] , [0139] , [0206] - [0212] *; | [Y]US2013322276 (PELLETIER BENOIT [CA], et al) [Y] 6 * paragraphs [0080] , [0084] , [0089] *; | [XAY] - ZTE CORPORATION, "On resource allocation for D2D discovery", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R2-134212 ON RESOURCE ALLOCATION IN D2D DISCOVERY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20131113), XP050736960 [X] 1,2,13,14 * sections 2.1 and 2.2 * [A] 8 [Y] 3-6 | [A] - ZTE, "Consideration on the SI of LTE Device to Device Proximity Services", vol. RAN WG3, no. Barcelona, Spain; 20130819 - 20130823, (20130809), 3GPP DRAFT; R3-131457, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG3_Iu/TSGR3_81/Docs/, (20130809), XP050719525 [A] 2 * sections 1 to 4.3 * | [XI] - ETRI, "Fully scheduled D2D transmission in LTE-coverage", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R2-134095, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20131113), XP050736894 [X] 7-10,15 * sections 2 to 2.2 * [I] 11,12 | [A] - HUAWEI ET AL, "Group management consideration and protocol stack design", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R2-134140, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN2/Docs/, (20131113), XP050736920 [A] 7 * sections 2 to 3.2 * |