EP3782799 - BOTTOM ELEMENT FOR AN ADDITIVE MANUFACTURING SYSTEM, AND ADDITIVE MANUFACTURING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 04.03.2022 | ||
Former | Grant of patent is intended Status updated on 23.01.2022 | ||
Former | Request for examination was made Status updated on 02.07.2021 | ||
Former | The application has been published Status updated on 22.01.2021 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Kumovis GmbH Flößergasse 4 81369 München / DE | [2022/06] |
Former [2021/08] | For all designated states Kumovis GmbH An der Mangmühle 34 82024 Taufkirchen / DE | Inventor(s) | 01 /
FISCHER, Stefan Staltacherstraße 55 82393 Iffeldorf / DE | 02 /
HAERST, Miriam Hirschbergstraße 22 80634 München / DE | 03 /
LEONHARDT, Stefan Prinzregentenstraße 153 81677 München / DE | 04 /
PAMMER, Sebastian Geibelstraße 10 81679 München / DE | [2021/08] | Representative(s) | DTS Patent- und Rechtsanwälte PartmbB Brienner Straße 1 80333 München / DE | [N/P] |
Former [2021/08] | DTS Patent- und Rechtsanwälte Schnekenbühl und Partner mbB Marstallstrasse 8 80539 München / DE | Application number, filing date | 20186808.0 | 20.07.2020 | [2021/08] | Priority number, date | DE201910122286 | 20.08.2019 Original published format: DE102019122286 | [2021/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3782799 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Type: | B1 Patent specification | No.: | EP3782799 | Date: | 06.04.2022 | Language: | EN | [2022/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.12.2020 | Classification | IPC: | B29C64/245, B29C64/35, B33Y30/00, B33Y40/00, B22F3/105 | [2021/08] | CPC: |
B29C64/245 (EP,US);
B29C64/25 (CN,US);
B29C64/20 (US);
B22F10/20 (EP,CN);
B22F10/68 (EP);
B22F12/30 (EP,US);
B22F12/70 (EP);
B29C64/35 (EP);
B29C64/364 (US);
B33Y30/00 (EP,CN,US);
B33Y40/00 (EP);
B22F2999/00 (EP);
Y02P10/25 (EP)
(-)
| C-Set: |
B22F2999/00, B22F12/70, B22F10/68 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/31] |
Former [2021/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BODENELEMENT FÜR EIN SYSTEM ZUR GENERATIVEN FERTIGUNG SOWIE SYSTEM ZUR GENERATIVEN FERTIGUNG | [2021/08] | English: | BOTTOM ELEMENT FOR AN ADDITIVE MANUFACTURING SYSTEM, AND ADDITIVE MANUFACTURING SYSTEM | [2021/08] | French: | ÉLÉMENT INFÉRIEUR POUR UN SYSTÈME DE FABRICATION ADDITIVE ET SYSTÈME DE FABRICATION ADDITIVE | [2021/08] | Examination procedure | 29.06.2021 | Amendment by applicant (claims and/or description) | 29.06.2021 | Examination requested [2021/31] | 29.06.2021 | Date on which the examining division has become responsible | 24.01.2022 | Communication of intention to grant the patent | 22.02.2022 | Fee for grant paid | 22.02.2022 | Fee for publishing/printing paid | 22.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.07.2020 | AL | 06.04.2022 | AT | 06.04.2022 | CY | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | ES | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | IT | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | MK | 06.04.2022 | MT | 06.04.2022 | NL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | BG | 06.07.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IE | 20.07.2022 | LU | 20.07.2022 | BE | 31.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | [2024/44] |
Former [2024/26] | HU | 20.07.2020 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/23] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/20] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/11] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/33] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IE | 20.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/25] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
LU | 20.07.2022 | ||
BE | 31.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/21] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
LU | 20.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/17] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/11] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/09] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/07] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/51] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/50] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/49] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/47] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
LT | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
NO | 06.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [XA]US2013287590 (NEUHAEUSLER STEFAN [DE], et al); | [XAI]WO2014049159 (BUNDESREP DEUTSCHLAND [DE], et al); | [XA]CN105170988 (UNIV SOUTH CHINA TECH); | [XA]CN105598452 (UNIV XIAN JIAOTONG ); | [XA]US2017036404 (RENGERS STEVEN HUBERT [US], et al); | [XA]CN109304468 (SHANDONG TAILI ADVANCED MANUFACTURING RES INSTITUTE CO LTD) | by applicant | US6033301 | US6722872 | US6817941 | EP2261009 | US2015110911 | WO2016063198 | EP3023228 | DE102015111504 | WO2017040675 | EP3173233 | WO2017108477 | DE102017122849 |