blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3782799

EP3782799 - BOTTOM ELEMENT FOR AN ADDITIVE MANUFACTURING SYSTEM, AND ADDITIVE MANUFACTURING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.02.2023
Database last updated on 18.10.2024
FormerThe patent has been granted
Status updated on  04.03.2022
FormerGrant of patent is intended
Status updated on  23.01.2022
FormerRequest for examination was made
Status updated on  02.07.2021
FormerThe application has been published
Status updated on  22.01.2021
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Kumovis GmbH
Flößergasse 4
81369 München / DE
[2022/06]
Former [2021/08]For all designated states
Kumovis GmbH
An der Mangmühle 34
82024 Taufkirchen / DE
Inventor(s)01 / FISCHER, Stefan
Staltacherstraße 55
82393 Iffeldorf / DE
02 / HAERST, Miriam
Hirschbergstraße 22
80634 München / DE
03 / LEONHARDT, Stefan
Prinzregentenstraße 153
81677 München / DE
04 / PAMMER, Sebastian
Geibelstraße 10
81679 München / DE
 [2021/08]
Representative(s)DTS Patent- und Rechtsanwälte PartmbB
Brienner Straße 1
80333 München / DE
[N/P]
Former [2021/08]DTS Patent- und Rechtsanwälte Schnekenbühl und Partner mbB
Marstallstrasse 8
80539 München / DE
Application number, filing date20186808.020.07.2020
[2021/08]
Priority number, dateDE20191012228620.08.2019         Original published format: DE102019122286
[2021/08]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3782799
Date:24.02.2021
Language:EN
[2021/08]
Type: B1 Patent specification 
No.:EP3782799
Date:06.04.2022
Language:EN
[2022/14]
Search report(s)(Supplementary) European search report - dispatched on:EP17.12.2020
ClassificationIPC:B29C64/245, B29C64/35, B33Y30/00, B33Y40/00, B22F3/105
[2021/08]
CPC:
B29C64/245 (EP,US); B29C64/25 (CN,US); B29C64/20 (US);
B22F10/20 (EP,CN); B22F10/68 (EP); B22F12/30 (EP,US);
B22F12/70 (EP); B29C64/35 (EP); B29C64/364 (US);
B33Y30/00 (EP,CN,US); B33Y40/00 (EP); B22F2999/00 (EP);
Y02P10/25 (EP) (-)
C-Set:
B22F2999/00, B22F12/70, B22F10/68 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/31]
Former [2021/08]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BODENELEMENT FÜR EIN SYSTEM ZUR GENERATIVEN FERTIGUNG SOWIE SYSTEM ZUR GENERATIVEN FERTIGUNG[2021/08]
English:BOTTOM ELEMENT FOR AN ADDITIVE MANUFACTURING SYSTEM, AND ADDITIVE MANUFACTURING SYSTEM[2021/08]
French:ÉLÉMENT INFÉRIEUR POUR UN SYSTÈME DE FABRICATION ADDITIVE ET SYSTÈME DE FABRICATION ADDITIVE[2021/08]
Examination procedure29.06.2021Amendment by applicant (claims and/or description)
29.06.2021Examination requested  [2021/31]
29.06.2021Date on which the examining division has become responsible
24.01.2022Communication of intention to grant the patent
22.02.2022Fee for grant paid
22.02.2022Fee for publishing/printing paid
22.02.2022Receipt of the translation of the claim(s)
Opposition(s)10.01.2023No opposition filed within time limit [2023/11]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.07.2020
AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
MK06.04.2022
MT06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
[2024/44]
Former [2024/26]HU20.07.2020
AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
MK06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2024/23]AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
MK06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2024/20]AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2024/11]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/33]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IE20.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/25]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
LU20.07.2022
BE31.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/21]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
LU20.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/17]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/11]AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/09]AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/07]AT06.04.2022
DK06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2022/51]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2022/50]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
PT08.08.2022
Former [2022/49]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
PT08.08.2022
Former [2022/47]AT06.04.2022
ES06.04.2022
FI06.04.2022
LT06.04.2022
NL06.04.2022
SE06.04.2022
NO06.07.2022
PT08.08.2022
Former [2022/44]NL06.04.2022
Documents cited:Search[XA]US2013287590  (NEUHAEUSLER STEFAN [DE], et al);
 [XAI]WO2014049159  (BUNDESREP DEUTSCHLAND [DE], et al);
 [XA]CN105170988  (UNIV SOUTH CHINA TECH);
 [XA]CN105598452  (UNIV XIAN JIAOTONG );
 [XA]US2017036404  (RENGERS STEVEN HUBERT [US], et al);
 [XA]CN109304468  (SHANDONG TAILI ADVANCED MANUFACTURING RES INSTITUTE CO LTD)
by applicantUS6033301
 US6722872
 US6817941
 EP2261009
 US2015110911
 WO2016063198
 EP3023228
 DE102015111504
 WO2017040675
 EP3173233
 WO2017108477
 DE102017122849
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.