blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3793116

EP3793116 - SYSTEMS AND METHODS FOR IMPLEMENTING HYBRID AUTOMATIC REPEAT REQUEST RETRANSMISSION SCHEDULING [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  23.02.2024
Database last updated on 24.08.2024
FormerGrant of patent is intended
Status updated on  09.11.2023
FormerExamination is in progress
Status updated on  10.03.2023
FormerRequest for examination was made
Status updated on  17.09.2021
FormerThe application has been published
Status updated on  12.02.2021
Most recent event   Tooltip08.08.2024Lapse of the patent in a contracting state
New state(s): SE
published on 11.09.2024 [2024/37]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
[2021/11]
Inventor(s)01 / DUAN, Ruchen
2443 Diane Marie Way
Santa Clara, CA 95050 / US
02 / LEE, Wook Bong
5019 Montreal Dr.
San Jose, CA 95130 / US
03 / RANGANATH, Ashok
1350 Oak Knoll Dr.
San Jose, CA 95129 / US
04 / IBRAHIM, Mostafa Sayed Roshdy
3473 N 1st St., Apt. 411
San Jose, CA 95134 / US
05 / KANDALA, Srinivas
18833 White Moon Drive
Morgan Hill, CA 95037 / US
 [2023/48]
Former [2021/11]01 / DUAN, Ruchen
2443 Diane Marie Way
Santa Clara, CA, 95050 / US
02 / LEE, Wook Bong
5019 Montreal Dr.
San Jose, CA, 95130 / US
03 / RANGANATH, Ashok
1350 Oak Knoll Dr.
San Jose, CA, 95129 / US
04 / IBRAHIM, Mostafa Sayed Roshdy
3473 N 1st St., Apt. 411
San Jose, CA, 95134 / US
05 / KANDALA, Srinivas
18833 White Moon Drive
Morgan Hill, CA, 95037 / US
Representative(s)Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB
Prinz-Ludwig-Straße 40A
85354 Freising / DE
[2021/11]
Application number, filing date20187836.027.07.2020
[2021/11]
Priority number, dateUS201962900288P13.09.2019         Original published format: US 201962900288 P
US20201693502421.07.2020         Original published format: US202016935024
[2021/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3793116
Date:17.03.2021
Language:EN
[2021/11]
Type: B1 Patent specification 
No.:EP3793116
Date:27.03.2024
Language:EN
[2024/13]
Search report(s)(Supplementary) European search report - dispatched on:EP09.02.2021
ClassificationIPC:H04L1/18
[2021/11]
CPC:
H04L1/1812 (EP,CN); H04L1/1819 (KR,US); H04L1/0008 (KR);
H04L1/1685 (KR); H04L1/1825 (EP,KR); H04L1/1829 (CN);
H04L1/1864 (KR); H04L1/1867 (CN); H04L1/188 (KR);
H04L1/1887 (KR); H04L1/1893 (EP,KR); H04L1/1896 (EP);
H04L5/0055 (US); H04L5/0092 (US); H04W28/04 (CN);
H04W8/24 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/42]
Former [2021/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEME UND VERFAHREN ZUR IMPLEMENTIERUNG EINER HYBRIDEN AUTOMATISCHEN WIEDERHOLUNGSANFORDERUNGSNEUÜBERTRAGUNGSPLANUNG[2021/11]
English:SYSTEMS AND METHODS FOR IMPLEMENTING HYBRID AUTOMATIC REPEAT REQUEST RETRANSMISSION SCHEDULING[2021/11]
French:SYSTÈMES ET PROCÉDÉS POUR LA MISE EN OEUVRE D'UNE PROGRAMMATION DE RETRANSMISSION DE DEMANDE DE RÉPÉTITION AUTOMATIQUE HYBRIDE[2023/49]
Former [2021/11]SYSTÈMES ET PROCÉDÉS POUR LA MISE EN UVRE D'UNE PROGRAMMATION DE RETRANSMISSION DE DEMANDE DE RÉPÉTITION AUTOMATIQUE HYBRIDE
Examination procedure10.09.2021Examination requested  [2021/42]
10.09.2021Date on which the examining division has become responsible
15.09.2021Amendment by applicant (claims and/or description)
13.03.2023Despatch of a communication from the examining division (Time limit: M04)
31.05.2023Reply to a communication from the examining division
10.11.2023Communication of intention to grant the patent
20.02.2024Fee for grant paid
20.02.2024Fee for publishing/printing paid
20.02.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
16.06.2022Renewal fee patent year 03
14.06.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipBG27.03.2024
FI27.03.2024
HR27.03.2024
LT27.03.2024
LV27.03.2024
SE27.03.2024
NO27.06.2024
RS27.06.2024
GR28.06.2024
[2024/37]
Former [2024/36]BG27.03.2024
FI27.03.2024
HR27.03.2024
LT27.03.2024
LV27.03.2024
NO27.06.2024
RS27.06.2024
GR28.06.2024
Former [2024/34]BG27.03.2024
FI27.03.2024
HR27.03.2024
LT27.03.2024
NO27.06.2024
RS27.06.2024
GR28.06.2024
Former [2024/33]LT27.03.2024
NO27.06.2024
Documents cited:Search[I]US2007110324  (KWON CHANG-YEUL [KR], et al);
 [XAI]US2016261724  (LEE DAE WON [US], et al);
 [I]US2017170932  (CHU LIWEN [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.