blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3750863

EP3750863 - REACTION PRODUCT PREPARATION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.05.2023
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  03.06.2022
FormerGrant of patent is intended
Status updated on  08.02.2022
FormerRequest for examination was made
Status updated on  21.05.2021
FormerThe application has been published
Status updated on  13.11.2020
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): BG
published on 21.08.2024 [2024/34]
Applicant(s)For all designated states
NGK Insulators, Ltd.
2-56, Suda-cho, Mizuho-ku
Nagoya-shi, Aichi 467-8530 / JP
[2020/51]
Inventor(s)01 / NIWA, Kousuke
c/o NGK INSULATORS, LTD.
2-56, Suda-cho Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
02 / KONDO, Yoshio
c/o NGK INSULATORS, LTD.
2-56, Suda-cho Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
03 / ISOBE, Hiroaki
c/o NGK INSULATORS, LTD.
2-56, Suda-cho Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
04 / AOKI, Michiro
c/o NGK INSULATORS, LTD.
2-56, Suda-cho Mizuho-ku
Nagoya-city, Aichi 467-8530 / JP
 [2020/51]
Representative(s)Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
[2022/27]
Former [2020/51]Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
Application number, filing date20189998.602.08.2017
[2020/51]
Priority number, dateJP2016015252203.08.2016         Original published format: JP 2016152522
[2020/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3750863
Date:16.12.2020
Language:EN
[2020/51]
Type: B1 Patent specification 
No.:EP3750863
Date:06.07.2022
Language:EN
[2022/27]
Search report(s)(Supplementary) European search report - dispatched on:EP24.09.2020
ClassificationIPC:C07B61/00, C07C17/08, C07C19/075, G01N21/35, H05B3/10
[2020/51]
CPC:
C07C17/08 (EP,US); B01J19/128 (US); C07C17/02 (US);
C07C19/075 (EP,US); G01N21/35 (EP,US); H05B3/03 (US);
H05B3/10 (EP,US); H05B3/26 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/25]
Former [2020/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:REAKTIONSPRODUKTHERSTELLUNGSVERFAHREN[2020/51]
English:REACTION PRODUCT PREPARATION METHOD[2020/51]
French:PROCÉDÉ DE PRÉPARATION D'UN PRODUIT DE RÉACTION[2020/51]
Examination procedure14.05.2021Amendment by applicant (claims and/or description)
14.05.2021Examination requested  [2021/25]
14.05.2021Date on which the examining division has become responsible
09.02.2022Communication of intention to grant the patent
26.05.2022Fee for grant paid
26.05.2022Fee for publishing/printing paid
26.05.2022Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP17837016.9  / EP3495339
Opposition(s)11.04.2023No opposition filed within time limit [2023/24]
Fees paidRenewal fee
07.08.2020Renewal fee patent year 03
07.08.2020Renewal fee patent year 04
20.08.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.08.2017
AL06.07.2022
AT06.07.2022
BG06.07.2022
CY06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
BE31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
[2024/34]
Former [2024/26]HU02.08.2017
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
BE31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/23]AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
BE31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/20]AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
BE31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/42]AL06.07.2022
AT06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
BE31.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/37]AL06.07.2022
AT06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/29]AL06.07.2022
AT06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/23]AT06.07.2022
CZ06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
LU02.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/22]AT06.07.2022
CZ06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
LU02.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/21]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
LU02.08.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/20]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/12]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/11]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/10]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/09]ES06.07.2022
FI06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
PT07.11.2022
Former [2023/08]ES06.07.2022
FI06.07.2022
LT06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
Former [2023/06]NL06.07.2022
Documents cited:Search[A]  - KEIGO FUGAMI ET AL, "Selective C-O Bond Activation by Means of Mid-IR Pulse Laser Irradiation", SYMPOSIUM ON PHYSICAL ORGANIC CHEMISTRY YOSHISHU, England, (20090101), XP055590044 [A] 1-4 * the whole document *
by applicantJP2016152522
    - FUGAMI, KEIGO, "Birth of selective organic synthesis chemistry involving mid-infrared pulse laser light", Grants-in-Aid for Scientific Research Database, 2006 Annual Research Report, (20080507), URL: https://kaken.nii.ac.jp/ja/report/KAKENHI-PROJECT-18655036/RECORD-186550362006jisseki
    - FUGAMI, KEIGO, "Birth of selective organic synthesis chemistry involving mid-infrared pulse laser light", Grants-in-Aid for Scientific Research Database, KAKEN 2007 Annual Research Report, (20100203), URL: https://kaken.nii.ac.jp/ja/report/KAKENHI-PROJECT-18655036/RECORD-186550362007jisseki
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.