blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3799173

EP3799173 - FUEL CELL WITH PCB TYPE SUPPORT PLATES COMPRISING COMPARTMENTS FOR SUPPLY AND DRAINAGE OF REACTANT FLUIDS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.02.2023
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  04.03.2022
FormerGrant of patent is intended
Status updated on  13.10.2021
FormerRequest for examination was made
Status updated on  26.02.2021
Most recent event   Tooltip05.07.2024Lapse of the patent in a contracting state
New state(s): HU
published on 07.08.2024 [2024/32]
Applicant(s)For all designated states
Commissariat à l'Energie Atomique et aux Energies Alternatives
Bâtiment Le Ponant D
25 rue Leblanc
75015 Paris / FR
[2021/13]
Inventor(s)01 / VINCENT, Rémi
c/o CEA GRENOBLE
17 rue des Martyrs
38054 GRENOBLE Cedex 09 / FR
02 / GARNIER, Laurent
c/o CEA GRENOBLE
17 rue des Martyrs
38054 GRENOBLE Cedex 09 / FR
03 / GERARD, Mathias
c/o CEA-Grenoble
17 rue des Martyrs
38054 GRENOBLE Cedex 09 / FR
 [2021/13]
Representative(s)INNOV-GROUP
310, avenue Berthelot
69372 Lyon Cedex 08 / FR
[2021/13]
Application number, filing date20198586.828.09.2020
[2021/13]
Priority number, dateFR2019001082630.09.2019         Original published format: FR 1910826
[2021/13]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3799173
Date:31.03.2021
Language:FR
[2021/13]
Type: B1 Patent specification 
No.:EP3799173
Date:06.04.2022
Language:FR
[2022/14]
Search report(s)(Supplementary) European search report - dispatched on:EP24.02.2021
ClassificationIPC:H01M8/0223, H01M8/0258, H01M8/0202, H01M8/2418, H01M8/0256, H01M8/2483, H01M8/04089, // H01M8/1018
[2021/13]
CPC:
H01M8/0223 (EP); H01M8/0256 (EP); H01M8/0258 (EP);
H01M8/0269 (EP); H01M8/04097 (EP); H01M8/2418 (EP);
H01M8/2483 (EP); H01M2008/1095 (EP); Y02E60/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/13]
TitleGerman:BRENNSTOFFZELLE MIT HALTEPLATTEN VOM LEITERPLATTENTYP MIT ZU- UND ABLEITUNGSKAMMERN FÜR REAKTIVE FLUIDE[2021/13]
English:FUEL CELL WITH PCB TYPE SUPPORT PLATES COMPRISING COMPARTMENTS FOR SUPPLY AND DRAINAGE OF REACTANT FLUIDS[2021/13]
French:PILE A COMBUSTIBLE A PLAQUES DE MAINTIEN DE TYPE PCB COMPORTANT DES COMPARTIMENTS D'ALIMENTATION ET D'EVACUATION EN FLUIDES REACTIFS[2021/13]
Examination procedure28.09.2020Examination requested  [2021/13]
04.11.2021Communication of intention to grant the patent
25.02.2022Fee for grant paid
25.02.2022Fee for publishing/printing paid
25.02.2022Receipt of the translation of the claim(s)
Opposition(s)10.01.2023No opposition filed within time limit [2023/11]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.09.2020
AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
MK06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
BE30.09.2022
[2024/32]
Former [2024/27]AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
MK06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
BE30.09.2022
Former [2024/21]AL06.04.2022
AT06.04.2022
CY06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
BE30.09.2022
Former [2024/11]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
IT06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
BE30.09.2022
Former [2023/42]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
BE30.09.2022
Former [2023/33]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
IE28.09.2022
LU28.09.2022
Former [2023/30]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
LU28.09.2022
Former [2023/25]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SI06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/22]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
MC06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/17]AL06.04.2022
AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/09]AT06.04.2022
CZ06.04.2022
DK06.04.2022
EE06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
PL06.04.2022
RO06.04.2022
RS06.04.2022
SE06.04.2022
SK06.04.2022
SM06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2023/07]AT06.04.2022
DK06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
PL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2022/51]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
PL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
IS06.08.2022
PT08.08.2022
Former [2022/50]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
PL06.04.2022
RS06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
PT08.08.2022
Former [2022/49]AT06.04.2022
ES06.04.2022
FI06.04.2022
HR06.04.2022
LT06.04.2022
LV06.04.2022
NL06.04.2022
SE06.04.2022
BG06.07.2022
NO06.07.2022
GR07.07.2022
PT08.08.2022
Former [2022/47]AT06.04.2022
ES06.04.2022
FI06.04.2022
LT06.04.2022
NL06.04.2022
SE06.04.2022
NO06.07.2022
PT08.08.2022
Former [2022/44]NL06.04.2022
Documents cited:Search[A]US2004175606  (KOMURA TAKASHI [JP], et al) [A] 1-14 * figures 4-6,19 ** paragraphs [0028] , [0067] - [0072] *;
 [A]US2004224190  (SASAHARA JUN [JP], et al) [A] 1-14 * figures 3-12 * * paragraphs [0089] - [0093] - [0129] - [0133] *;
 [A]DE102006035636  (NAN YA PRINTED CIRCUIT BOARD C [TW]) [A] 1-14 * figures 1,4-7,10 * * paragraphs [0042] - [0047] *;
 [A]EP3429006  (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [A] 1-14 * figure 4 * * paragraphs [0025] - [0030] - [0 57] - [0062] *
by applicantUS2005202297
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.