EP3818960 - DENTAL PROSTHETIC SYSTEM WITH A BRIDGE STRUCTURE REMOVABLE FROM A BASE STRUCTURE [Right-click to bookmark this link] | Status | Grant of patent is intended Status updated on 22.11.2023 Database last updated on 22.05.2024 | |
Former | Examination is in progress Status updated on 02.12.2022 | ||
Former | Request for examination was made Status updated on 11.02.2022 | ||
Former | The application has been published Status updated on 09.04.2021 | Most recent event Tooltip | 16.04.2024 | New entry: Application deemed to be withdrawn: despatch of communication + time limit | Applicant(s) | For all designated states Dental Vision B.V.B.A. Bijlkensveldstraat 4 3080 Tervuren / BE | [2021/19] | Inventor(s) | 01 /
DE CLERCK, René Dental Vision B.V.B.A. Bijlkensveldstraat 4 3080 Tervuren / BE | [2021/19] | Representative(s) | Callewaert, Koen, et al Bureau Callewaert b.v.b.a. Brusselsesteenweg 108 3090 Overijse / BE | [2021/19] | Application number, filing date | 20206095.0 | 06.11.2020 | [2021/19] | Priority number, date | BE20190005768 | 06.11.2019 Original published format: BE 201905768 | [2021/19] | Filing language | NL | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3818960 | Date: | 12.05.2021 | Language: | EN | [2021/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.02.2021 | Classification | IPC: | A61C8/00, A61C13/225 | [2021/19] | CPC: |
A61C8/0048 (EP);
A61C8/0028 (US);
A61C13/225 (EP);
A61C8/0068 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/11] |
Former [2021/19] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ZAHNPROTHESENSYSTEM MIT EINER BRÜCKENSTRUKTUR, DIE VON EINER GRUNDSTRUKTUR ENTFERNT WERDEN KANN | [2021/19] | English: | DENTAL PROSTHETIC SYSTEM WITH A BRIDGE STRUCTURE REMOVABLE FROM A BASE STRUCTURE | [2021/19] | French: | SYSTÈME DE PROTHÈSE DENTAIRE AVEC STRUCTURE DE BRIDGE AMOVIBLE D'UNE STRUCTURE DE BASE | [2021/19] | Examination procedure | 13.11.2021 | Amendment by applicant (claims and/or description) | 13.11.2021 | Examination requested [2022/11] | 13.11.2021 | Date on which the examining division has become responsible | 02.12.2022 | Despatch of a communication from the examining division (Time limit: M06) | 14.09.2023 | Reply to a communication from the examining division | 23.11.2023 | Communication of intention to grant the patent | 15.04.2024 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 14.09.2023 | Request for further processing filed | 14.09.2023 | Full payment received (date of receipt of payment) Request granted | 21.09.2023 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees SK, MT, MK, MC, LV, LU, LT, IT, IS, IE, TR, SM, SI, SE, RS, RO, PT, PL, NO, NL, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 03.02.2022 | Request for further processing filed | 03.02.2022 | Full payment received (date of receipt of payment) Request granted | 12.04.2022 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the examination fee | 03.02.2022 | Request for further processing filed | 03.02.2022 | Full payment received (date of receipt of payment) Request granted | 12.04.2022 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 03.02.2022 | Request for further processing filed | 03.02.2022 | Full payment received (date of receipt of payment) Request granted | 12.04.2022 | Decision despatched | 03.02.2022 | Request for further processing filed | 03.02.2022 | Full payment received (date of receipt of payment) Request granted | 12.04.2022 | Decision despatched | Fees paid | Renewal fee | 30.11.2022 | Renewal fee patent year 03 | 30.11.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]GB1291470 (AGA AB [SE]) [X] 1 * figures 1, 2 *[I] 2,5-8; | [Y]US3747215 (JOYNER C) [Y] 3,4 * figure - *; | [Y]ES2103196 (CARDONA LABARGA CARLOS FERNAND [ES]) [Y] 3,4 * figure - *; | [A]WO03003933 (DE CLERCK RENE [BE]) [A] 1-10 * figure - *; | [XDY]WO2013021386 (KAMIL TECH LTD [GB], et al) [XD] 1,2 * figure - * [Y] 3,4; | [Y]WO2017099282 (DS CO LTD [KR]) [Y] 3,4 * figure 5 *; | [Y]EP3187143 (REALITY DENTAL LABORATORY CORP [JP]) [Y] 3,4 * paragraph [0066]; figure - *; | [XI] - Carl E. Misch, "Chapter 28 Principles for Abutment and Prosthtic Screws and Screw-Retained Components and Prostheses", (20180617), Pocket Dentistry Fastest Clinical Dentistry Insight Engine, URL: https://pocketdentistry.com/28-principles-for-abutment-and-prosthetic-screws-and-screw-retained-components-and-prostheses/, (20210126), XP002801855 [X] 1 * figures 28-1 * [I] 2,5-8 | by applicant | WO2008009080 | US2014178839 |