blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3837942

EP3837942 - WORK MACHINE ZONE GENERATION AND CONTROL SYSTEM WITH GEOSPATIAL CONSTRAINTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.07.2023
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  19.08.2022
FormerGrant of patent is intended
Status updated on  12.05.2022
FormerRequest for examination was made
Status updated on  31.12.2021
FormerThe application has been published
Status updated on  21.05.2021
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): BG
published on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Deere & Company
One John Deere Place
Moline, IL 61265 / US
[2021/25]
Inventor(s)01 / Sidon, Jeffrey S.
John Deere GmbH & Co KG
John-Deere-Str. 70
68163 Mannheim / DE
02 / Helmich, Sam
John Deere GmbH & Co KG
John-Deere-Str. 70
68163 Mannheim / DE
03 / Anderson, Scott W.
John Deere GmbH & Co KG
John-Deere-Str. 70
68163 Mannheim / DE
04 / Glass, David
John Deere GmbH & Co KG
John-Deere-Str. 70
68163 Mannheim / DE
 [2021/25]
Representative(s)Holst, Sönke
John Deere GmbH & Co. KG
Global Intellectual Property Services
John-Deere-Strasse 70
68163 Mannheim / DE
[2021/25]
Application number, filing date20208171.717.11.2020
[2021/25]
Priority number, dateUS201962949072P17.12.2019         Original published format: US 201962949072 P
US20201678033803.02.2020         Original published format: US202016780338
[2021/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3837942
Date:23.06.2021
Language:EN
[2021/25]
Type: B1 Patent specification 
No.:EP3837942
Date:21.09.2022
Language:EN
[2022/38]
Search report(s)(Supplementary) European search report - dispatched on:EP11.05.2021
ClassificationIPC:A01B79/00, A01D41/127
[2021/25]
CPC:
A01B79/005 (EP,US); A01D41/127 (EP,US); G06F18/2321 (US);
G06V20/188 (US); E02F9/262 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/05]
Former [2021/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ARBEITSMASCHINENZONENERZEUGUNG UND STEUERUNGSSYSTEM MIT RÄUMLICHEN BESCHRÄNKUNGEN[2021/25]
English:WORK MACHINE ZONE GENERATION AND CONTROL SYSTEM WITH GEOSPATIAL CONSTRAINTS[2021/25]
French:SYSTÈME DE GÉNÉRATION ET DE CONTRÔLE DE ZONE DE MACHINE DE TRAVAIL AVEC DES CONTRAINTES GÉOSPATIALES[2021/25]
Examination procedure23.12.2021Examination requested  [2022/05]
23.12.2021Date on which the examining division has become responsible
13.05.2022Communication of intention to grant the patent
09.08.2022Fee for grant paid
09.08.2022Fee for publishing/printing paid
09.08.2022Receipt of the translation of the claim(s)
Opposition(s)22.06.2023No opposition filed within time limit [2023/35]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.11.2020
AL21.09.2022
AT21.09.2022
BG21.09.2022
CY21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
IT21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
MK21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
[2024/34]
Former [2024/32]HU17.11.2020
AL21.09.2022
AT21.09.2022
CY21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
IT21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
MK21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2024/27]AL21.09.2022
AT21.09.2022
CY21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
IT21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
MK21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2024/26]AL21.09.2022
AT21.09.2022
CY21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
IT21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2024/21]AL21.09.2022
AT21.09.2022
CY21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/52]AL21.09.2022
AT21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
FR21.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/49]AL21.09.2022
AT21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
BE30.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/48]AL21.09.2022
AT21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
IE17.11.2022
LU17.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/37]AL21.09.2022
AT21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
LU17.11.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/34]AL21.09.2022
AT21.09.2022
CZ21.09.2022
DK21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/30]AL21.09.2022
AT21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
NL21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/29]AL21.09.2022
AT21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/26]AT21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/23]AT21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
PT23.01.2023
Former [2023/22]AT21.09.2022
CZ21.09.2022
ES21.09.2022
FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RO21.09.2022
RS21.09.2022
SE21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
PT23.01.2023
Former [2023/20]FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RS21.09.2022
SE21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
Former [2023/10]FI21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RS21.09.2022
SE21.09.2022
NO21.12.2022
GR22.12.2022
Former [2023/09]FI21.09.2022
LT21.09.2022
LV21.09.2022
RS21.09.2022
SE21.09.2022
NO21.12.2022
Former [2023/08]FI21.09.2022
LT21.09.2022
RS21.09.2022
SE21.09.2022
NO21.12.2022
Documents cited:Search[A]EP1943877  (DEERE & CO [US]) [A] 1-15 * paragraphs [0019] - [0022]; figures 1-5 *;
 [A]US2018257657  (BLANK SEBASTIAN [US], et al) [A] 1-15 * paragraphs [0019] , [0022] - [0025] - [0045] - [0061]; figures 1, 4a, 4b *;
 [A]US10091925  (AHARONI EHUD [IL], et al) [A] 1-15 * column 9, line 41 - column 10, line 36; figures 1-3D *;
 [A]US2019069470  (PFEIFFER DOHN W [US], et al) [A] 1-15 * abstract *;
 [A]US10255670  (WU DOLLY Y [US], et al) [A] 1-15* column 28, line 62 - column 29, line 35; figures 1, 16, 17 *;
 [A]US10408645  (BLANK SEBASTIAN [US], et al) [A] 1-15 * column 26, line 60 - column 27, line 36; figures 1A-3, 11, 12A, 12B *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.