EP3876807 - SURFACE CLEANING UTENSIL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.04.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 29.04.2022 | ||
Former | Grant of patent is intended Status updated on 05.12.2021 | ||
Former | Request for examination was made Status updated on 13.08.2021 | ||
Former | The international publication has been made Status updated on 25.07.2020 | ||
Former | unknown Status updated on 17.01.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Koninklijke Philips N.V. High Tech Campus 52 5656 AG Eindhoven / NL | [2021/37] | Inventor(s) | 01 /
ESPIN FRANCO, Fermin High Tech Campus 5 5656 AE Eindhoven / NL | [2021/37] | Representative(s) | Vollering, Stefanus Franciscus Maria Philips Domestic Appliances IP Department High Tech Campus 42 5656 AE Eindhoven / NL | [N/P] |
Former [2022/22] | de Vries, Janna, et al Philips Domestic Appliances Nederland B.V. High Tech Campus 42 5656 AE Eindhoven / NL | ||
Former [2021/37] | Kapoor, Pavan Puneet Philips Domestic Appliances IP Department High Tech Campus 42 5656 AE Eindhoven / NL | Application number, filing date | 20700203.1 | 09.01.2020 | [2021/37] | WO2020EP50340 | Priority number, date | EP20190152057 | 16.01.2019 Original published format: EP 19152057 | [2021/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020148136 | Date: | 23.07.2020 | Language: | EN | [2020/30] | Type: | A1 Application with search report | No.: | EP3876807 | Date: | 15.09.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.07.2020 takes the place of the publication of the European patent application. | [2021/37] | Type: | B1 Patent specification | No.: | EP3876807 | Date: | 01.06.2022 | Language: | EN | [2022/22] | Search report(s) | International search report - published on: | EP | 23.07.2020 | Classification | IPC: | A47L11/40 | [2021/37] | CPC: |
A47L11/4038 (EP);
A47L9/0472 (US);
A46B13/008 (US);
A46B13/02 (US);
A47L11/283 (US);
A47L11/40 (RU);
A47L11/4069 (EP,US);
A47L11/408 (US);
A47L11/4088 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | OBERFLÄCHENREINIGUNGSUTENSIL | [2021/37] | English: | SURFACE CLEANING UTENSIL | [2021/37] | French: | USTENSILE DE NETTOYAGE DE SURFACE | [2021/37] | Entry into regional phase | 11.06.2021 | National basic fee paid | 11.06.2021 | Designation fee(s) paid | 11.06.2021 | Examination fee paid | Examination procedure | 11.06.2021 | Examination requested [2021/37] | 11.06.2021 | Date on which the examining division has become responsible | 06.12.2021 | Communication of intention to grant the patent | 19.04.2022 | Fee for grant paid | 19.04.2022 | Fee for publishing/printing paid | 22.04.2022 | Receipt of the translation of the claim(s) | 04.05.2022 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | Opposition(s) | 02.03.2023 | No opposition filed within time limit [2023/19] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 22.04.2022 | Request for further processing filed | 22.04.2022 | Full payment received (date of receipt of payment) Request granted | 04.05.2022 | Decision despatched | Fees paid | Renewal fee | 31.01.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 01.06.2022 | AT | 01.06.2022 | CZ | 01.06.2022 | DK | 01.06.2022 | EE | 01.06.2022 | ES | 01.06.2022 | FI | 01.06.2022 | HR | 01.06.2022 | IT | 01.06.2022 | LT | 01.06.2022 | LV | 01.06.2022 | MC | 01.06.2022 | NL | 01.06.2022 | PL | 01.06.2022 | RO | 01.06.2022 | RS | 01.06.2022 | SE | 01.06.2022 | SK | 01.06.2022 | SM | 01.06.2022 | BG | 01.09.2022 | NO | 01.09.2022 | GR | 02.09.2022 | IS | 01.10.2022 | PT | 03.10.2022 | IE | 09.01.2023 | LU | 09.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | [2024/29] |
Former [2024/11] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
IT | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 09.01.2023 | ||
LU | 09.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/08] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
IE | 09.01.2023 | ||
LU | 09.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/49] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
LU | 09.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
LU | 09.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
LU | 09.01.2023 | ||
Former [2023/21] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
DK | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/17] | AL | 01.06.2022 | |
AT | 01.06.2022 | ||
CZ | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/12] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
IS | 01.10.2022 | ||
PT | 03.10.2022 | ||
Former [2023/09] | AT | 01.06.2022 | |
CZ | 01.06.2022 | ||
EE | 01.06.2022 | ||
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RO | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
SK | 01.06.2022 | ||
SM | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
PT | 03.10.2022 | ||
Former [2023/08] | AT | 01.06.2022 | |
ES | 01.06.2022 | ||
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2023/07] | AT | 01.06.2022 | |
FI | 01.06.2022 | ||
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2023/02] | FI | 01.06.2022 | |
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
NL | 01.06.2022 | ||
PL | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/50] | FI | 01.06.2022 | |
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
PL | 01.06.2022 | ||
RS | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/49] | FI | 01.06.2022 | |
HR | 01.06.2022 | ||
LT | 01.06.2022 | ||
LV | 01.06.2022 | ||
SE | 01.06.2022 | ||
BG | 01.09.2022 | ||
NO | 01.09.2022 | ||
GR | 02.09.2022 | ||
Former [2022/47] | FI | 01.06.2022 | |
LT | 01.06.2022 | ||
SE | 01.06.2022 | ||
NO | 01.09.2022 | Cited in | International search | [A]US3082451 (SMITHSON CHARLES B) [A] 1-7 * abstract *; | [A]US4041567 (BURGOON JACK L) [A] 1-7 * abstract *; | [A]EP0254833 (IDROPLINA SRL [IT]) [A] 1-7* abstract *; | [A]US2009263177 (JORDAN TODD A [US]) [A] 1-7 * abstract *; | [A]WO2018162091 (KAERCHER ALFRED SE & CO KG [DE]) [A] 1-7 * page 12, paragraph last - page 26, line 8; figures 1-8 * | by applicant | EP2395894 | US9414729 | WO2018153706 |