EP3911774 - NICKEL BASED ALLOY HAVING HIGH MECHANICAL STRENGTH AT HIGH TEMPERATURE [Right-click to bookmark this link] | |||
Former [2021/47] | NICKEL-BASED SUPERALLOY HAVING HIGH MECHANICAL STRENGTH AT A HIGH TEMPERATURE | ||
[2022/39] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 06.09.2022 | ||
Former | Request for examination was made Status updated on 22.10.2021 | ||
Former | The international publication has been made Status updated on 25.07.2020 | ||
Former | unknown Status updated on 06.03.2020 | Most recent event Tooltip | 30.08.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 02.10.2024 [2024/40] | Applicant(s) | For all designated states SAFRAN 2, Boulevard du Général Martial Valin 75015 Paris / FR | For all designated states Universite de Nantes 1, quai de Tourville 44000 Nantes / FR | For all designated states Centre national de la recherche scientifique 3, rue Michel Ange 75016 Paris / FR | [2021/47] | Inventor(s) | 01 /
RAME, Jérémy c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-Point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 02 /
MENOU, Edern c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-Point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 03 /
DESGRANGES, Clara c/o SAFRAN AIRCRAFT ENGINES PI (AJI) Rond-Point René Ravaud-Réau 77550 MOISSY-CRAMAYEL / FR | 04 /
TANCRET, Franck 6 avenue Ludovic Cormerais 44000 NANTES / FR | [2023/09] |
Former [2021/47] | 01 /
RAME, Jérémy 77550 MOISSY-CRAMAYEL / FR | ||
02 /
MENOU, Edern 77550 MOISSY-CRAMAYEL / FR | |||
03 /
DESGRANGES, Clara 77550 MOISSY-CRAMAYEL / FR | |||
04 /
TANCRET, Franck 44000 NANTES / FR | Representative(s) | Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | [2021/47] | Application number, filing date | 20706569.9 | 14.01.2020 | [2021/47] | WO2020FR50049 | Priority number, date | FR20190000390 | 16.01.2019 Original published format: FR 1900390 | [2021/47] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2020148504 | Date: | 23.07.2020 | Language: | FR | [2020/30] | Type: | A1 Application with search report | No.: | EP3911774 | Date: | 24.11.2021 | Language: | FR | The application published by WIPO in one of the EPO official languages on 23.07.2020 takes the place of the publication of the European patent application. | [2021/47] | Type: | B1 Patent specification | No.: | EP3911774 | Date: | 01.03.2023 | Language: | FR | [2023/09] | Search report(s) | International search report - published on: | EP | 23.07.2020 | Classification | IPC: | C22C19/05, C23C28/00, F01D5/00 | [2021/47] | CPC: |
C22C19/057 (EP,US);
C23C28/00 (EP);
C23C28/30 (EP);
C23C28/321 (EP,US);
C23C28/3215 (EP);
C23C28/345 (EP);
C23C28/3455 (EP,US);
C23C4/02 (EP);
C23C4/11 (EP);
C23C4/134 (EP);
F01D5/28 (EP);
F01D5/288 (EP,US);
C22C2204/00 (US);
F05B2280/10741 (EP,US);
F05D2300/13 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | NICKELBASISLEGIERUNG MIT HOHER MECHANISCHER FESTIGKEIT BEI HOHER TEMPERATUR | [2022/39] | English: | NICKEL BASED ALLOY HAVING HIGH MECHANICAL STRENGTH AT HIGH TEMPERATURE | [2022/39] | French: | SUPERALLIAGE A BASE DE NICKEL A TENUE MECANIQUE ELEVEE A HAUTE TEMPERATURE | [2021/47] |
Former [2021/47] | SUPERLEGIERUNG AUF NICKELBASIS MIT HOHER MECHANISCHER FESTIGKEIT BEI HOHER TEMPERATUR | ||
Former [2021/47] | NICKEL-BASED SUPERALLOY HAVING HIGH MECHANICAL STRENGTH AT A HIGH TEMPERATURE | Entry into regional phase | 11.08.2021 | National basic fee paid | 11.08.2021 | Designation fee(s) paid | 11.08.2021 | Examination fee paid | Examination procedure | 11.08.2021 | Examination requested [2021/47] | 11.08.2021 | Date on which the examining division has become responsible | 07.09.2022 | Communication of intention to grant the patent | 08.12.2022 | Fee for grant paid | 08.12.2022 | Fee for publishing/printing paid | 08.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 20.01.2022 | Renewal fee patent year 03 | 19.01.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | [2024/40] |
Former [2024/26] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Cited in | International search | [A]EP0971041 (ONERA (OFF NAT AEROSPATIALE) [FR]) [A] 1-13* claim 1 *; | [A]EP1319729 (SIEMENS AG [DE]) [A] 1-13 * claim 1 *; | [A]EP2128284 (IHI CORP [JP]) [A] 1-13 * claims 1,12 *; | [A]EP2333121 (UNITED TECHNOLOGIES CORP [US]) [A] 1-13 * claims 11,12 *; | [A]WO2018078269 (SAFRAN [FR], et al) [A] 1-13 * claims 1,7,8 * |