EP3938074 - MINERALIZATION CARTRIDGE AND METHOD FOR THE OPERATION THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.06.2024 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 07.07.2023 | ||
Former | Grant of patent is intended Status updated on 08.03.2023 | ||
Former | Examination is in progress Status updated on 16.01.2023 | ||
Former | Grant of patent is intended Status updated on 02.01.2023 | ||
Former | Examination is in progress Status updated on 14.10.2022 | ||
Former | Request for examination was made Status updated on 17.12.2021 | ||
Former | The international publication has been made Status updated on 28.09.2020 | ||
Former | unknown Status updated on 27.03.2020 | Most recent event Tooltip | 14.06.2024 | No opposition filed within time limit | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states ACLARIS GmbH, Lindau Zweigniederlassung Rebstein Balgacherstrasse 20 9445 Rebstein / CH | [2024/23] |
Former [2023/07] | For all designated states ACLARIS Water Innovations GmbH Lindau, Zweigniederlassung Rebstein Balgacherstrasse 20 9445 Rebstein / CH | ||
Former [2022/03] | For all designated states Aquis Wasser-Luft-Systeme GmbH, Lindau, Zweigniederlassung Rebstein Balgacherstrasse 20 9445 Rebstein / CH | Inventor(s) | 01 /
HEITELE, Bernd Eggerstrasse 11a 9437 Marbach / CH | [2023/32] |
Former [2022/03] | 01 /
HEITELE, Bernd 9437 Marbach / CH | Representative(s) | Otten, Roth, Dobler & Partner mbB Patentanwälte Großtobeler Straße 39 88276 Berg / Ravensburg / DE | [2022/03] | Application number, filing date | 20711871.2 | 13.03.2020 | [2022/03] | WO2020EP56865 | Priority number, date | DE201910106690 | 15.03.2019 Original published format: DE102019106690 | DE201910118850 | 11.07.2019 Original published format: DE102019118850 | [2022/03] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020187745 | Date: | 24.09.2020 | Language: | DE | [2020/39] | Type: | A1 Application with search report | No.: | EP3938074 | Date: | 19.01.2022 | Language: | DE | The application published by WIPO in one of the EPO official languages on 24.09.2020 takes the place of the publication of the European patent application. | [2022/03] | Type: | B1 Patent specification | No.: | EP3938074 | Date: | 09.08.2023 | Language: | DE | [2023/32] | Search report(s) | International search report - published on: | EP | 24.09.2020 | Classification | IPC: | B01D37/02, C02F1/00, C02F1/68, C02F1/28, C02F1/42, C02F1/44 | [2022/03] | CPC: |
C02F1/003 (EP,KR,US);
B01D37/025 (EP,KR);
B01D37/02 (CN);
C02F1/688 (EP,KR,US);
C02F1/001 (CN);
C02F1/006 (EP,KR);
C02F1/283 (EP,CN,KR);
C02F1/42 (EP,CN,KR);
C02F1/441 (EP,CN,KR);
C02F1/68 (CN);
C02F1/686 (US);
C02F2201/004 (EP,KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | MINERALISIERUNGSKARTUSCHE UND VERFAHREN ZU DEREN BETRIEB | [2022/03] | English: | MINERALIZATION CARTRIDGE AND METHOD FOR THE OPERATION THEREOF | [2022/03] | French: | CARTOUCHE DE MINÉRALISATION ET SON PROCÉDÉ DE FONCTIONNEMENT | [2022/03] | Entry into regional phase | 28.07.2021 | National basic fee paid | 28.07.2021 | Designation fee(s) paid | 28.07.2021 | Examination fee paid | Examination procedure | 28.07.2021 | Examination requested [2022/03] | 28.07.2021 | Date on which the examining division has become responsible | 24.01.2022 | Amendment by applicant (claims and/or description) | 09.09.2022 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the invitation to file a copy of earlier search results or a statement of non-availability not received in time | 14.09.2022 | Request for decision received: Application is deemed to be withdrawn | 06.10.2022 | Result of request for decision (Application is deemed to be withdrawn): Request accepted | 18.10.2022 | Despatch of a communication from the examining division (Time limit: M01) | 03.11.2022 | Reply to a communication from the examining division | 03.01.2023 | Communication of intention to grant the patent | 13.01.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 09.03.2023 | Communication of intention to grant the patent | 28.06.2023 | Fee for grant paid | 28.06.2023 | Fee for publishing/printing paid | 28.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 13.05.2024 | No opposition filed within time limit [2024/29] | Fees paid | Renewal fee | 23.03.2022 | Renewal fee patent year 03 | 22.03.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 09.08.2023 | DK | 09.08.2023 | EE | 09.08.2023 | FI | 09.08.2023 | HR | 09.08.2023 | LT | 09.08.2023 | LV | 09.08.2023 | NL | 09.08.2023 | RO | 09.08.2023 | RS | 09.08.2023 | SE | 09.08.2023 | SK | 09.08.2023 | SM | 09.08.2023 | NO | 09.11.2023 | GR | 10.11.2023 | IS | 09.12.2023 | PT | 11.12.2023 | [2024/23] |
Former [2024/22] | CZ | 09.08.2023 | |
DK | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/20] | FI | 09.08.2023 | |
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/10] | FI | 09.08.2023 | |
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/09] | FI | 09.08.2023 | |
LT | 09.08.2023 | ||
NL | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
Former [2024/08] | LT | 09.08.2023 | |
NL | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | Cited in | International search | [I]JPH11319855 (SHARP KK); | [A]US6553894 (HAMON JEAN-PIERRE [FR], et al); | [I]WO2012163392 (SAKOWSKY JON [US]); | [A]WO2013053627 (UNILEVER NV [NL], et al); | [I]WO2019038622 (FORMASTER S A [PL]) |