EP3980491 - POLYETHYLENE BLEND [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 16.11.2022 | ||
Former | Request for examination was made Status updated on 11.03.2022 | ||
Former | The international publication has been made Status updated on 18.12.2020 | ||
Former | unknown Status updated on 23.06.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT, SI | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Univation Technologies, LLC 5555 San Felipe Suite 700 Houston, TX 77056 / US | [2022/15] | Inventor(s) | 01 /
BORSE, Nitin 230 Abner Jackson Parkway Lake Jackson, TX 77566 / US | 02 /
CHANDAK, Swapnil B. 5555 San Felipe Street Suite 1950 Houston, TX 77056 / US | [2022/15] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2022/15] | Application number, filing date | 20733147.1 | 28.05.2020 | [2022/15] | WO2020US34803 | Priority number, date | US201962859447P | 10.06.2019 Original published format: US 201962859447 P | [2022/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020251764 | Date: | 17.12.2020 | Language: | EN | [2020/51] | Type: | A1 Application with search report | No.: | EP3980491 | Date: | 13.04.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.12.2020 takes the place of the publication of the European patent application. | [2022/15] | Type: | B1 Patent specification | No.: | EP3980491 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | International search report - published on: | EP | 17.12.2020 | Classification | IPC: | C08L23/08, C08J5/18 | [2022/15] | CPC: |
C08L23/0815 (EP,US);
C08J5/18 (EP,US);
C08J2323/08 (EP,US);
C08J2423/06 (EP,US);
C08L2203/162 (US);
C08L2205/025 (US);
C08L2207/064 (US)
(-)
| C-Set: |
C08L23/0815, C08L23/06 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | POLYETHYLENMISCHUNG | [2022/15] | English: | POLYETHYLENE BLEND | [2022/15] | French: | MÉLANGE DE POLYÉTHYLÈNE | [2022/15] | Entry into regional phase | 27.12.2021 | National basic fee paid | 27.12.2021 | Designation fee(s) paid | 27.12.2021 | Examination fee paid | Examination procedure | 27.12.2021 | Examination requested [2022/15] | 27.12.2021 | Date on which the examining division has become responsible | 27.07.2022 | Amendment by applicant (claims and/or description) | 17.11.2022 | Communication of intention to grant the patent | 17.03.2023 | Fee for grant paid | 17.03.2023 | Fee for publishing/printing paid | 17.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 20.03.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | MC | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | IE | 28.05.2023 | LU | 28.05.2023 | CH | 31.05.2023 | LI | 31.05.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | [2024/26] |
Former [2024/21] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
IE | 28.05.2023 | ||
LU | 28.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/14] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 28.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/10] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 28.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/09] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 28.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/08] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 28.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/03] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/01] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/51] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/50] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/48] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
PT | 04.09.2023 | ||
Former [2023/46] | ES | 03.05.2023 | |
PT | 04.09.2023 | Cited in | International search | [A]EP0308088 (MOBIL OIL CORP [US]) [A] 1-10 * page 2, line 21 - line 24 * * page 2, line 40 - line 43; examples 1,2; claim -; tables 1,2 *; | [A]US5334428 (DOBRESKI DAVID V [US], et al) [A] 1-10* example -; claim - *; | [I]WO9426816 (EXXON CHEMICAL PATENTS INC [US]) [I] 1-10 * page 1, line 20 * * page 18, line 34 - page 19, line 10 * * page 19, line 30 - page 20, line 4 * * Samples 2,3-6,9,10;; tables X4-X8 *; | [A]US6649698 (MEHTA SAMEER D [US]) [A] 1-10 * column 1, line 6 - line 11 * * column 1, line 60 - column 2, line 8 * * column 2, line 31 - line 36; example -; claim - *; | [A]US2005003175 (NYGARD PAULA L [US], et al) [A] 1-10 * paragraphs [0001] , [0003]; example -; claim - *; | [A]WO2014058659 (DOW GLOBAL TECHNOLOGIES LLC [US]) [A] 1-10 * claim - * | by applicant | US2825721 | US3023203 | US3324101 | US3622251 | US3704287 | US3709853 | BE839380 | US4003712 | US4011382 | US4100105 | US4302566 | US4453399 | US4543399 | US4588790 | US4882400 | US4988783 | US4994534 | US5352749 | US5462999 | US5541270 | US5627242 | EP0649992 | US5665818 | EP0794200 | EP0634421 | US5677375 | EP0802202 | US6355733 | US6489408 | US2003113496 | US2003139530 | US6649698 | US6989344 | US2006173123 | US2007260016 | US2008038533 | US7504467 | US2011010938 | US2012028017 | US2016297907 | WO2017132092 |