blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4013991

EP4013991 - SYSTEM FOR RELEASING PRESSURE IN A PRESSURE VESSEL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.08.2024
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  25.08.2023
FormerGrant of patent is intended
Status updated on  02.05.2023
FormerRequest for examination was made
Status updated on  20.05.2022
FormerThe international publication has been made
Status updated on  19.02.2021
Formerunknown
Status updated on  15.07.2020
Most recent event   Tooltip02.08.2024No opposition filed within time limitpublished on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2022/25]
Inventor(s)01 / SCHILD, Johannes
Apfelweg 14/1
74232 Abstatt / DE
 [2022/25]
Application number, filing date20736943.025.06.2020
[2022/25]
WO2020EP67810
Priority number, dateDE20191021203712.08.2019         Original published format: DE102019212037
[2022/25]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2021028104
Date:18.02.2021
Language:DE
[2021/07]
Type: A1 Application with search report 
No.:EP4013991
Date:22.06.2022
Language:DE
The application published by WIPO in one of the EPO official languages on 18.02.2021 takes the place of the publication of the European patent application.
[2022/25]
Type: B1 Patent specification 
No.:EP4013991
Date:27.09.2023
Language:DE
[2023/39]
Search report(s)International search report - published on:EP18.02.2021
ClassificationIPC:F17C13/04
[2022/25]
CPC:
F17C13/04 (EP,CN,KR); F17C1/00 (CN); F17C13/12 (CN);
F17C2201/0109 (EP,CN,KR); F17C2201/056 (EP,CN,KR); F17C2205/0326 (EP,CN,KR);
F17C2205/0332 (EP,CN,KR); F17C2205/0338 (EP,CN,KR); F17C2205/0385 (EP,CN,KR);
F17C2205/0391 (EP,CN,KR); F17C2205/0394 (EP,CN,KR); F17C2221/012 (EP,CN,KR);
F17C2223/0123 (EP,CN,KR); F17C2270/0178 (EP,CN,KR); Y02E60/32 (EP,CN,KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SYSTEM ZUR DRUCKENTLASTUNG EINES DRUCKBEHÄLTERS[2022/25]
English:SYSTEM FOR RELEASING PRESSURE IN A PRESSURE VESSEL[2022/25]
French:SYSTÈME DE LIBÉRATION DE PRESSION DANS UN RÉCIPIENT SOUS PRESSION[2022/25]
Entry into regional phase14.03.2022National basic fee paid 
14.03.2022Designation fee(s) paid 
14.03.2022Examination fee paid 
Examination procedure14.03.2022Examination requested  [2022/25]
14.03.2022Date on which the examining division has become responsible
06.09.2022Amendment by applicant (claims and/or description)
03.05.2023Communication of intention to grant the patent
17.08.2023Fee for grant paid
17.08.2023Fee for publishing/printing paid
17.08.2023Receipt of the translation of the claim(s)
Opposition(s)28.06.2024No opposition filed within time limit [2024/36]
Fees paidRenewal fee
30.06.2022Renewal fee patent year 03
30.06.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ27.09.2023
DK27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
PL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
[2024/33]
Former [2024/26]CZ27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
PL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
Former [2024/23]CZ27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
Former [2024/20]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RS27.09.2023
SE27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
Former [2024/14]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RS27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/10]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
RS27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/09]FI27.09.2023
LT27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/08]LT27.09.2023
NO27.12.2023
GR28.12.2023
Cited inInternational search[A]WO2006093060  (TOYOTA MOTOR CO LTD [JP], et al) [A] 1-11 * the whole document *;
 [A]DE102013018779  (DAIMLER AG [DE]) [A] 1-11* the whole document *;
 [A]DE102014215719  (BAYERISCHE MOTOREN WERKE AG [DE]) [A] 1-11 * figure 1 * * paragraph [0028] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.