EP3997331 - CONNECTION FOR SPLIT WIND TURBINE BLADE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 02.01.2023 | ||
Former | Request for examination was made Status updated on 15.04.2022 | ||
Former | The international publication has been made Status updated on 22.01.2021 | ||
Former | unknown Status updated on 21.07.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): BE, CH, IT, SI | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states VESTAS WIND SYSTEMS A/S Hedeager 42 8200 Aarhus N / DK | [2022/19] | Inventor(s) | 01 /
HEDGES, Andrew 43 Princess Avenue Surbiton Greater London KT6 7JL / GB | 02 /
ERNST, Robert Marselisborg Havnevej 8000 Århus C / DK | 03 /
MASMANIDIS, Iordanis 16 Myrtle Grove Portsmouth PO3 6HB / GB | [2022/19] | Representative(s) | Vestas Patents Department Hedeager 42 8200 Aarhus N / DK | [2022/19] | Application number, filing date | 20739567.4 | 09.07.2020 | [2022/20] | WO2020DK50210 | Priority number, date | DK2019PA70462 | 12.07.2019 Original published format: DK PA201970462 | [2022/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021008665 | Date: | 21.01.2021 | Language: | EN | [2021/03] | Type: | A1 Application with search report | No.: | EP3997331 | Date: | 18.05.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.01.2021 takes the place of the publication of the European patent application. | [2022/20] | Type: | B1 Patent specification | No.: | EP3997331 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | International search report - published on: | EP | 21.01.2021 | Classification | IPC: | F03D1/06 | [2022/19] | CPC: |
F03D1/0675 (EP);
F05B2240/302 (EP);
Y02E10/72 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERBINDUNG FÜR GETEILTES WINDTURBINENBLATT | [2022/19] | English: | CONNECTION FOR SPLIT WIND TURBINE BLADE | [2022/19] | French: | RACCORD POUR PALE D'ÉOLIENNE À DEUX BLOCS | [2022/19] | Entry into regional phase | 07.02.2022 | National basic fee paid | 07.02.2022 | Designation fee(s) paid | 07.02.2022 | Examination fee paid | Examination procedure | 07.02.2022 | Examination requested [2022/20] | 07.02.2022 | Date on which the examining division has become responsible | 22.08.2022 | Amendment by applicant (claims and/or description) | 03.01.2023 | Communication of intention to grant the patent | 28.04.2023 | Fee for grant paid | 28.04.2023 | Fee for publishing/printing paid | 28.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 26.07.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | NL | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | LU | 09.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | [2024/26] |
Former [2024/22] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
LU | 09.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/18] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
LU | 09.07.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/16] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/09] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/52] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
NL | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Cited in | International search | [XY]DE102010015392 (AERO DYNAMIK CONSULT GMBH [DE]) [X] 1-3,8,10-13,15,17 * paragraphs [0016] , [0017] , [0018]; figures 2-10 * [Y] 4-7,9,14,16; | [Y]US2018298879 (JOHNSON STEPHEN BERTRAM [US], et al) [Y] 4-7,9,14,16* paragraphs [0044] - [0051]; figures 2-5; claims 1-4 * |