EP3986117 - SYSTEM FOR CULTIVATING PLANTS AND OPERATION METHOD THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.10.2023 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 18.11.2022 | ||
Former | Grant of patent is intended Status updated on 14.07.2022 | ||
Former | Examination is in progress Status updated on 27.05.2022 | ||
Former | Request for examination was made Status updated on 25.03.2022 | ||
Former | The international publication has been made Status updated on 25.12.2020 | ||
Former | unknown Status updated on 31.07.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): BE, IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states ZERO SRL Via Pietro Bassani, 1 33170 Pordenone / IT | [2022/17] | Inventor(s) | 01 /
ALESSIO, Andrea c/o Zero SRL Via Pietro Bassani, 1 33170 Pordenone / IT | 02 /
MODESTO, Daniele c/o Zero SRL Via Pietro Bassani, 1 33170 Pordenone / IT | [2022/17] | Representative(s) | Studio Torta S.p.A., et al Via Viotti, 9 10121 Torino / IT | [N/P] |
Former [2022/17] | Zamprogno, Bruno, et al STUDIO TORTA S.p.A. Via Viotti, 9 10121 Torino / IT | Application number, filing date | 20744103.1 | 19.06.2020 | [2022/17] | WO2020IB55798 | Priority number, date | IT20190009603 | 20.06.2019 Original published format: IT201900009603 | [2022/17] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020255074 | Date: | 24.12.2020 | Language: | EN | [2020/52] | Type: | A1 Application with search report | No.: | EP3986117 | Date: | 27.04.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.12.2020 takes the place of the publication of the European patent application. | [2022/17] | Type: | B1 Patent specification | No.: | EP3986117 | Date: | 21.12.2022 | Language: | EN | [2022/51] | Search report(s) | International search report - published on: | EP | 24.12.2020 | Classification | IPC: | A01G31/06 | [2022/17] | CPC: |
A01G31/06 (EP,US);
A01G27/006 (US);
A01G9/023 (US);
A01G2031/006 (US);
Y02P60/21 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM ZUM KULTIVIEREN VON PFLANZEN UND BETRIEBSVERFAHREN DAFÜR | [2022/17] | English: | SYSTEM FOR CULTIVATING PLANTS AND OPERATION METHOD THEREOF | [2022/17] | French: | SYSTÈME DE CULTURE DE PLANTES ET PROCÉDÉ DE FONCTIONNEMENT ASSOCIÉ | [2022/17] | Entry into regional phase | 21.12.2021 | National basic fee paid | 21.12.2021 | Designation fee(s) paid | 21.12.2021 | Examination fee paid | Examination procedure | 20.04.2021 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 21.12.2021 | Amendment by applicant (claims and/or description) | 21.12.2021 | Examination requested [2022/17] | 21.12.2021 | Date on which the examining division has become responsible | 30.05.2022 | Despatch of a communication from the examining division (Time limit: M02) | 13.06.2022 | Reply to a communication from the examining division | 15.07.2022 | Communication of intention to grant the patent | 15.11.2022 | Fee for grant paid | 15.11.2022 | Fee for publishing/printing paid | 15.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 22.09.2023 | No opposition filed within time limit [2023/48] | Fees paid | Renewal fee | 27.06.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 21.12.2022 | AT | 21.12.2022 | CZ | 21.12.2022 | DK | 21.12.2022 | EE | 21.12.2022 | ES | 21.12.2022 | FI | 21.12.2022 | HR | 21.12.2022 | IT | 21.12.2022 | LT | 21.12.2022 | LV | 21.12.2022 | MC | 21.12.2022 | NL | 21.12.2022 | PL | 21.12.2022 | RO | 21.12.2022 | RS | 21.12.2022 | SE | 21.12.2022 | SI | 21.12.2022 | SK | 21.12.2022 | SM | 21.12.2022 | NO | 21.03.2023 | GR | 22.03.2023 | IS | 21.04.2023 | PT | 21.04.2023 | IE | 19.06.2023 | LU | 19.06.2023 | BE | 30.06.2023 | [2024/26] |
Former [2024/21] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
IE | 19.06.2023 | ||
LU | 19.06.2023 | ||
Former [2024/15] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
LU | 19.06.2023 | ||
Former [2024/11] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2024/09] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/46] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/39] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/38] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/37] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/35] | AT | 21.12.2022 | |
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/34] | EE | 21.12.2022 | |
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/33] | ES | 21.12.2022 | |
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/29] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/25] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/23] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/22] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
Former [2023/20] | LT | 21.12.2022 | |
NO | 21.03.2023 | Cited in | International search | [A]CN206686836U (HUNAN XIZHIRUN BIOTECHNOLOGY CO LTD) [A] 1-19 * figures 1-6 *; | [A]US2018338430 (COBZEV ANTON N [CA], et al) [A] 1-19* paragraph [0030]; figures 2,5,6,10 *; | [A]CN109699488 (QINGDAO AIKU PARKER AGRICULTURAL TECH CO LTD) [A] 1-19 * paragraphs [0039] - [0042] - [0084]; figures 2,3 * |