blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4153910

EP4153910 - AN ELECTRODE BOILER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.09.2024
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  20.10.2023
FormerGrant of patent is intended
Status updated on  15.06.2023
FormerRequest for examination was made
Status updated on  24.02.2023
FormerThe international publication has been made
Status updated on  26.11.2021
Formerunknown
Status updated on  31.07.2020
Most recent event   Tooltip27.09.2024No opposition filed within time limitpublished on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Parat Halvorsen AS
Tjørsvågstrand 27
4400 Flekkefjord / NO
[2023/13]
Inventor(s)01 / STRØMLAND, Fred
4400 Flekkefjord / NO
 [2023/13]
Representative(s)AWA Norway AS
P.O. Box 1052 Hoff
0218 Oslo / NO
[N/P]
Former [2023/13]AWA Norway AS
Hoffsveien 1A
0275 Oslo / NO
Application number, filing date20744162.722.05.2020
[2023/13]
WO2020NO50135
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021235938
Date:25.11.2021
Language:EN
[2021/47]
Type: A1 Application with search report 
No.:EP4153910
Date:29.03.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 25.11.2021 takes the place of the publication of the European patent application.
[2023/13]
Type: B1 Patent specification 
No.:EP4153910
Date:22.11.2023
Language:EN
[2023/47]
Search report(s)International search report - published on:EP25.11.2021
ClassificationIPC:F22B1/28, F22B1/30
[2023/13]
CPC:
F22B1/303 (EP); F22B1/285 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/13]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ELEKTRODENKESSEL[2023/13]
English:AN ELECTRODE BOILER[2023/13]
French:CHAUDIÈRE À ÉLECTRODES[2023/13]
Entry into regional phase21.12.2022National basic fee paid 
21.12.2022Designation fee(s) paid 
21.12.2022Examination fee paid 
Examination procedure22.03.2021Request for preliminary examination filed
International Preliminary Examining Authority: EP
21.12.2022Amendment by applicant (claims and/or description)
21.12.2022Examination requested  [2023/13]
21.12.2022Date on which the examining division has become responsible
16.06.2023Communication of intention to grant the patent
16.10.2023Fee for grant paid
16.10.2023Fee for publishing/printing paid
16.10.2023Receipt of the translation of the claim(s)
Opposition(s)23.08.2024No opposition filed within time limit [2024/44]
Fees paidRenewal fee
21.12.2022Renewal fee patent year 03
06.04.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT22.11.2023
CZ22.11.2023
EE22.11.2023
ES22.11.2023
HR22.11.2023
IT22.11.2023
LT22.11.2023
LV22.11.2023
PL22.11.2023
RO22.11.2023
RS22.11.2023
SK22.11.2023
SM22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
[2024/36]
Former [2024/35]AT22.11.2023
CZ22.11.2023
EE22.11.2023
ES22.11.2023
HR22.11.2023
LT22.11.2023
LV22.11.2023
PL22.11.2023
RO22.11.2023
RS22.11.2023
SM22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
Former [2024/34]AT22.11.2023
EE22.11.2023
ES22.11.2023
HR22.11.2023
LT22.11.2023
LV22.11.2023
PL22.11.2023
RS22.11.2023
SM22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
Former [2024/33]AT22.11.2023
ES22.11.2023
HR22.11.2023
LT22.11.2023
LV22.11.2023
PL22.11.2023
RS22.11.2023
SM22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
Former [2024/26]AT22.11.2023
ES22.11.2023
HR22.11.2023
LT22.11.2023
LV22.11.2023
PL22.11.2023
RS22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
Former [2024/23]AT22.11.2023
ES22.11.2023
LT22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
PT22.03.2024
Former [2024/21]LT22.11.2023
BG22.02.2024
GR23.02.2024
IS22.03.2024
Former [2024/20]GR23.02.2024
IS22.03.2024
Cited inInternational search[A]GB193405  (BRITISH THOMSON HOUSTON CO LTD) [A] 1-3 * page 8, line 8 - line 92; figure 9a *;
 [XA]US4418269  (EATON-WILLIAMS RAYMOND H [GB]) [X] 1 * column 2, line 42 - column 3, line 62; figures 1,4,5 * * column 6, line 27 - column 7, line 9 * [A] 2,3;
 [XI]FR2604846  (ELECTRICITE DE FRANCE [FR]) [X] 1,2 * page 2, line 27 - page 6, line 3; figure 1 * [I] 3;
 [A]US2015316253  (ILIN ANDREY PAVLOVICH [RU]) [A] 1-3* paragraphs [0070] - [0072]; figures 24-28 *
by applicantGB472479
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.