EP3759449 - TRIPEDAL FLEXURE MEMBER AND LOAD/TORQUE MEASUREMENT SYSTEMS USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 05.08.2022 | ||
Former | Grant of patent is intended Status updated on 23.06.2022 | ||
Former | Request for examination was made Status updated on 04.12.2020 | ||
Former | The international publication has been made Status updated on 03.08.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Futek Advanced Sensor Technology 10 Thomas Irvine CA 92618 / US | [2021/01] | Inventor(s) | 01 /
LISIAK, Maciej 141 Avenida Florencia, Apt. C San Clemente, CA 92672 / US | [2021/24] |
Former [2021/01] | 01 /
LISIAK, Maciej 141 Avenida Florencia Apt. C San Clemente, California 92672 / US | Representative(s) | Schaumburg und Partner Patentanwälte mbB Mauerkircherstraße 31 81679 München / DE | [N/P] |
Former [2021/01] | Schaumburg und Partner Patentanwälte mbB Postfach 86 07 48 81634 München / DE | Application number, filing date | 20745569.2 | 03.01.2020 | [2021/01] | WO2020US12119 | Priority number, date | US201916257541 | 25.01.2019 Original published format: US201916257541 | [2021/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020154077 | Date: | 30.07.2020 | Language: | EN | [2020/31] | Type: | A1 Application with search report | No.: | EP3759449 | Date: | 06.01.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.07.2020 takes the place of the publication of the European patent application. | [2021/01] | Type: | B1 Patent specification | No.: | EP3759449 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | International search report - published on: | US | 30.07.2020 | (Supplementary) European search report - dispatched on: | EP | 17.11.2021 | Classification | IPC: | G01L1/22, G01G3/13, G01G3/14, G01L1/00, G01L1/04, G01L1/18, G01L1/20 | [2021/01] | CPC: |
G01L1/205 (EP,IL);
G01L1/2243 (IL,US);
G01G3/1412 (IL,US);
G01L1/2206 (EP,IL)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | TRIPEDALES BIEGEELEMENT UND LAST-/DREHMOMENTMESSSYSTEME DAMIT | [2021/01] | English: | TRIPEDAL FLEXURE MEMBER AND LOAD/TORQUE MEASUREMENT SYSTEMS USING SAME | [2021/01] | French: | ÉLÉMENT DE FLEXION À TROIS PIEDS ET SYSTÈMES DE MESURE DE CHARGE/COUPLE L'UTILISANT | [2021/01] | Entry into regional phase | 02.10.2020 | National basic fee paid | 02.10.2020 | Search fee paid | 02.10.2020 | Designation fee(s) paid | 02.10.2020 | Examination fee paid | Examination procedure | 02.10.2020 | Examination requested [2021/01] | 08.02.2022 | Amendment by applicant (claims and/or description) | 24.06.2022 | Communication of intention to grant the patent | 02.08.2022 | Fee for grant paid | 02.08.2022 | Fee for publishing/printing paid | 02.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 27.01.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.09.2022 | AT | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | IT | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IE | 03.01.2023 | LU | 03.01.2023 | IS | 07.01.2023 | PT | 09.01.2023 | BE | 31.01.2023 | FR | 31.01.2023 | [2024/29] |
Former [2024/26] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
IT | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IE | 03.01.2023 | ||
LU | 03.01.2023 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
BE | 31.01.2023 | ||
FR | 31.01.2023 | ||
Former [2024/08] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IE | 03.01.2023 | ||
LU | 03.01.2023 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
BE | 31.01.2023 | ||
FR | 31.01.2023 | ||
Former [2023/52] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
LU | 03.01.2023 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
BE | 31.01.2023 | ||
FR | 31.01.2023 | ||
Former [2023/49] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
LU | 03.01.2023 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
BE | 31.01.2023 | ||
Former [2023/43] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
LU | 03.01.2023 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/37] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/34] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/30] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/29] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/26] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/23] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/22] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/20] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/10] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/09] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
Former [2023/08] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | Documents cited: | Search | [A]GB1335520 (PEAK COMPONENTS LTD) [A] 1-11* column 2, line 14 - line 40; figure 1 *; | [A]US3969935 (SHOBERG RALPH S) [A] 1-11 * column 1, line 5 - line 9 * * column 1, line 52 - line 65 * * column 3, line 36 - line 50; figure 6 *; | [A]US4785896 (JACOBSON WALTER E [US]) [A] 1-11 * column 2, line 37 - column 3, line 8; figures 1-3 * | International search | [A]US4448085 (LEE SHIH-YING [US]) [A] 1-11 * entire document *; | [A]US4785896 (JACOBSON WALTER E [US]) [A] 1-11 * entire document *; | [A]US2011277562 (BERME NECIP [US]) [A] 1-11 * entire document *; | [A]US2014000387 (SMITH DAVID EDWARD [GB]) [A] 1-11* entire document * | by applicant | US4785896 |