blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4038653

EP4038653 - QUICK DISCONNECT SWITCH [Right-click to bookmark this link]
Former [2022/32]QUICK-BREAK DISCONNECT SWITCH
[2023/24]
StatusThe patent has been granted
Status updated on  03.11.2023
Database last updated on 05.08.2024
FormerGrant of patent is intended
Status updated on  12.06.2023
FormerRequest for examination was made
Status updated on  08.07.2022
FormerThe international publication has been made
Status updated on  10.04.2021
Formerunknown
Status updated on  04.11.2020
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): PL, SK
published on 04.09.2024 [2024/36]
Applicant(s)For all designated states
Lell, Peter
Am Mühlbachbogen 85
85368 Moosburg / DE
[2022/32]
Inventor(s)01 / see applicant
...
 [2022/32]
Representative(s)Simandi, Claus
Simandi Patentanwälte
Kurfürstendamm 45
10719 Berlin / DE
[2022/32]
Application number, filing date20797034.402.10.2020
[2022/32]
WO2020EP77628
Priority number, dateEP2019020121202.10.2019         Original published format: EP 19201212
[2022/32]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2021064160
Date:08.04.2021
Language:DE
[2021/14]
Type: A1 Application with search report 
No.:EP4038653
Date:10.08.2022
Language:DE
The application published by WIPO in one of the EPO official languages on 08.04.2021 takes the place of the publication of the European patent application.
[2022/32]
Type: B1 Patent specification 
No.:EP4038653
Date:06.12.2023
Language:DE
[2023/49]
Search report(s)International search report - published on:EP08.04.2021
ClassificationIPC:H01H39/00, F42B3/00, // F15B15/10, F15B15/19
[2023/24]
CPC:
H01H39/006 (EP,US); H01H39/00 (CN); F42B3/006 (EP);
F15B15/10 (EP); F15B15/19 (EP); H01H2039/008 (EP)
Former IPC [2022/32]H01H39/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/32]  
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SCHNELLTRENNSCHALTER[2022/32]
English:QUICK DISCONNECT SWITCH[2023/24]
French:SECTIONNEUR RAPIDE[2023/24]
Former [2022/32]QUICK-BREAK DISCONNECT SWITCH
Former [2022/32]SECTIONNEUR À COUPURE RAPIDE
Entry into regional phase02.05.2022National basic fee paid 
02.05.2022Designation fee(s) paid 
02.05.2022Examination fee paid 
Examination procedure30.07.2021Request for preliminary examination filed
International Preliminary Examining Authority: EP
02.05.2022Examination requested  [2022/32]
02.05.2022Date on which the examining division has become responsible
18.11.2022Amendment by applicant (claims and/or description)
13.06.2023Communication of intention to grant the patent
23.10.2023Fee for grant paid
23.10.2023Fee for publishing/printing paid
23.10.2023Receipt of the translation of the claim(s)
Fees paidRenewal fee
31.10.2022Renewal fee patent year 03
31.10.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ06.12.2023
ES06.12.2023
HR06.12.2023
PL06.12.2023
RO06.12.2023
RS06.12.2023
SK06.12.2023
SM06.12.2023
NO06.03.2024
GR07.03.2024
IS06.04.2024
[2024/36]
Former [2024/35]CZ06.12.2023
ES06.12.2023
HR06.12.2023
RO06.12.2023
RS06.12.2023
SM06.12.2023
NO06.03.2024
GR07.03.2024
IS06.04.2024
Former [2024/33]ES06.12.2023
HR06.12.2023
RS06.12.2023
SM06.12.2023
NO06.03.2024
GR07.03.2024
IS06.04.2024
Former [2024/32]ES06.12.2023
HR06.12.2023
RS06.12.2023
NO06.03.2024
GR07.03.2024
IS06.04.2024
Former [2024/27]ES06.12.2023
HR06.12.2023
RS06.12.2023
NO06.03.2024
GR07.03.2024
Former [2024/20]GR07.03.2024
Cited inInternational search[XI]DE19817133  (LELL PETER [DE]) [X] 1,2,4,7-10,12-17 * column 5, lines 10-25; figures 17, 18a, 18b; claims 5, 6, 35, 40 * * column 1, lines 3-9 * * column 3, lines 5-15 * * column 3, line 51 - column 4, line 17; figures 8a - 11e * * column 6, lines 56-62 * [I] 3,5,6,11;
 [XI]US2004112239  (PARKS BRENT [US], et al) [X] 1-5,7,13-15,17 * paragraphs [0002] , [0 41] - [0047]; figures 3A, 3B * * paragraphs [0030] - [0040]; figures 1, 2A, 2B *[I] 6,8-12,16;
 [XI]FR2957452  (SNPE MATERIAUX ENERGETIQUES [FR]) [X] 1,2,7-10,12-15 * page 9, lines 17-28; figures 13A, 13B; claims 1-6, 8 * [I] 3-6,11,16;
 [XI]AT517907B  (HIRTENBERGER AUTOMOTIVE SAFETY GMBH & CO KG [AT]) [X] 1,8-11,13,14 * paragraphs [0029] - [0031]; figures 1-3; claims 1-3, 7, 8, 10 * [I] 4,6
ExaminationAT517907
by applicantEP0563947
 DE4402994
 DE4438157
 DE19616993
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.