blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4048583

EP4048583 - GENERATION OF ELECTRICAL POWER OFFSHORE [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  08.07.2024
Database last updated on 14.09.2024
FormerRequest for examination was made
Status updated on  29.07.2022
FormerThe international publication has been made
Status updated on  01.05.2021
Formerunknown
Status updated on  24.11.2020
Most recent event   Tooltip08.07.2024New entry: Communication of intention to grant a patent 
Applicant(s)For all designated states
Subsea 7 Norway AS
Kanalsletta 9
4033 Stavanger / NO
[2022/35]
Inventor(s)01 / CHANG, Paul Douglas
Øvre Stokka Vei 38
4023 Stavanger / NO
02 / KLOSTER, Ernst Kristen Helgøy
Duesvei 22
4023 Stavanger / NO
 [2022/35]
Representative(s)Keltie LLP
No. 1 London Bridge
London SE1 9BA / GB
[2022/35]
Application number, filing date20807292.622.10.2020
[2022/35]
WO2020EP79820
Priority number, dateGB2019001550325.10.2019         Original published format: GB 201915503
[2022/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021078899
Date:29.04.2021
Language:EN
[2021/17]
Type: A1 Application with search report 
No.:EP4048583
Date:31.08.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 29.04.2021 takes the place of the publication of the European patent application.
[2022/35]
Search report(s)International search report - published on:EP29.04.2021
ClassificationIPC:B63B21/50, F03D9/25, F03D13/25, F03B13/06, F16L1/19, H02G9/12, B63B35/44
[2022/35]
CPC:
B63B21/50 (EP,GB,US); B63B35/44 (GB,US); B63B21/20 (US);
B63B21/26 (US); B63B27/29 (US); F03B13/06 (EP);
F03D13/25 (EP,GB); F03D9/257 (EP); F16L1/19 (EP);
B63B2021/505 (GB); B63B2035/4433 (GB); B63B2035/4453 (US);
B63B2035/446 (EP,GB,US); B63B2035/4466 (US); B63B21/502 (EP);
F03D9/14 (EP); F05B2240/93 (EP); F05B2240/97 (EP);
H02G9/12 (EP); Y02E10/20 (EP); Y02E10/727 (EP);
Y02E60/16 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/35]
TitleGerman:OFFSHORE-STROMERZEUGUNG[2022/35]
English:GENERATION OF ELECTRICAL POWER OFFSHORE[2022/35]
French:GÉNÉRATION D'ÉNERGIE ÉLECTRIQUE EN MER[2022/35]
Entry into regional phase17.05.2022National basic fee paid 
17.05.2022Designation fee(s) paid 
17.05.2022Examination fee paid 
Examination procedure20.08.2021Request for preliminary examination filed
International Preliminary Examining Authority: EP
17.05.2022Examination requested  [2022/35]
17.05.2022Date on which the examining division has become responsible
09.12.2022Amendment by applicant (claims and/or description)
09.07.2024Communication of intention to grant the patent
Fees paidRenewal fee
28.10.2022Renewal fee patent year 03
30.10.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]DE102012100981  (SCHRAMM RAINER [DE]);
 [IAY]US2014044541  (DUPIN DE LA GUERIVIERE PAUL [FR]);
 [A]WO2014055027  (HEXICON AB [SE]);
 [XA]EP2789849  (MITSUBISHI HEAVY IND LTD [JP])
by applicantWO9729943
 WO9745318
 WO9748596
 WO0210589
 US6408781
 WO2006042178
 JP3944445B
 WO2008152505
 WO2019043105
 GB2578473
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.