blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4062570

EP4062570 - FEEDBACK RESOURCE DETERMINATION FOR SIDELINK COMMUNICATIONS [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  26.08.2022
Database last updated on 04.06.2024
FormerThe international publication has been made
Status updated on  29.05.2021
Formerunknown
Status updated on  09.12.2020
Most recent event   Tooltip27.11.2023New entry: Renewal fee paid 
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2022/39]
Inventor(s)01 / BLASCO SERRANO, Ricardo
Hyljeveneentie 1 F 12
02260 Espoo / FI
02 / DO, Hieu
Vasavägen 75, lgh 1203
177 32 Järfälla / SE
 [2022/39]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2022/39]Haseltine Lake Kempner LLP
Redcliff Quay
120 Redcliff Street
Bristol BS1 6HU / GB
Application number, filing date20816622.319.11.2020
[2022/39]
WO2020IB60939
Priority number, dateUS201962937758P19.11.2019         Original published format: US 201962937758 P
[2022/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021099999
Date:27.05.2021
Language:EN
[2021/21]
Type: A1 Application with search report 
No.:EP4062570
Date:28.09.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 27.05.2021 takes the place of the publication of the European patent application.
[2022/39]
Search report(s)International search report - published on:EP27.05.2021
ClassificationIPC:H04L1/18, H04L5/00, H04L1/00
[2022/39]
CPC:
H04L1/1864 (EP); H04W72/02 (US); H04L1/0061 (EP,US);
H04L1/1861 (EP); H04L1/1893 (EP); H04L1/1896 (EP);
H04L5/0051 (EP,US); H04L5/0055 (EP); H04L5/0094 (EP);
H04W72/20 (US); H04L1/0072 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/39]
TitleGerman:RÜCKKOPPLUNGSRESSOURCENBESTIMMUNG FÜR SIDELINK-KOMMUNIKATION[2022/39]
English:FEEDBACK RESOURCE DETERMINATION FOR SIDELINK COMMUNICATIONS[2022/39]
French:DÉTERMINATION DES RESSOURCES DE RÉTROACTION POUR LES COMMUNICATIONS PAR LIAISON LATÉRALE[2022/39]
Entry into regional phase18.06.2022National basic fee paid 
18.06.2022Designation fee(s) paid 
18.06.2022Examination fee paid 
Examination procedure18.06.2022Examination requested  [2022/39]
18.06.2022Date on which the examining division has become responsible
17.11.2022Amendment by applicant (claims and/or description)
Fees paidRenewal fee
28.11.2022Renewal fee patent year 03
27.11.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]US2017347394  (YASUKAWA SHIMPEI [JP], et al) [X] 1-5,8,10-17,20,22-40 * figure 4 * * paragraph [0068] - paragraph [0076] * * paragraph [0140] * * claims 1,3 *[I] 6,7,9,18,19,21;
 [XI]US2019044667  (GUO LI [US], et al) [X] 1-5,8,10-17,20,22-40 * figure 17 * * paragraph [0213] - paragraph [0225] * [I] 6,7,9,18,19,21;
 [XI]WO2019029652  (HUAWEI TECH CO LTD [CN]) [X] 1-5,8,10-17,20,22-40 * paragraph [0176] - paragraph [0177] * * paragraph [0147] * * claims 1,12,14,17 * * figure 16 * [I] 6,7,9,18,19,21;
 [XI]WO2019197025  (ERICSSON TELEFON AB L M [SE]) [X] 1-5,8,10-17,20,22-40 * page 37, line 30 - page 43, line 15 * * figure 9 * [I] 6,7,9,18,19,21;
 [XI]  - ITL, "Physical layer procedure for NR V2X", vol. RAN WG1, no. Prague, CZ; 20190826 - 20190830, (20190816), 3GPP DRAFT; R1-1909117_V2X_PHY PROCEDURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_98/Docs/R1-1909117.zip, (20190816), XP051765720 [X] 1-5,8,10-17,20,22-40 * Section 3 * [I] 6,7,9,18,19,21
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.