EP4078855 - RADIO-FREQUENCY DATA TRANSPORT INFRASTRUCTURE VIA OPTICAL FIBERS [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 29.12.2023 Database last updated on 20.07.2024 | |
Former | Grant of patent is intended Status updated on 12.07.2023 | ||
Former | Request for examination was made Status updated on 23.09.2022 | ||
Former | The international publication has been made Status updated on 25.06.2021 | ||
Former | unknown Status updated on 21.12.2020 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): LT, NO | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states LATELEC 135, rue de Périole 31500 Toulouse / FR | [2022/43] | Inventor(s) | 01 /
REBIERE, Yoann 12 Avenue Latécoère Bâtiment 1, Appartement 14 31520 RAMONVILLE / FR | 02 /
BACOU, Alexandre 619, route des Guiralets 82700 SAINT PORQUIER / FR | [2022/43] | Representative(s) | Ipside 6, Impasse Michel Labrousse 31100 Toulouse / FR | [2022/43] | Application number, filing date | 20823866.7 | 16.12.2020 | [2022/43] | WO2020EP86492 | Priority number, date | FR20190014594 | 17.12.2019 Original published format: FR 1914594 | [2022/43] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2021122795 | Date: | 24.06.2021 | Language: | FR | [2021/25] | Type: | A1 Application with search report | No.: | EP4078855 | Date: | 26.10.2022 | Language: | FR | The application published by WIPO in one of the EPO official languages on 24.06.2021 takes the place of the publication of the European patent application. | [2022/43] | Type: | B1 Patent specification | No.: | EP4078855 | Date: | 31.01.2024 | Language: | FR | [2024/05] | Search report(s) | International search report - published on: | EP | 24.06.2021 | Classification | IPC: | H04B10/2575 | [2022/43] | CPC: |
H04B10/25756 (EP);
H04B10/25753 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | INFRASTRUKTUR FÜR RADIOFREQUENZDATENTRANSPORT ÜBER GLASFASERN | [2022/43] | English: | RADIO-FREQUENCY DATA TRANSPORT INFRASTRUCTURE VIA OPTICAL FIBERS | [2022/43] | French: | INFRASTRUCTURE DE TRANSPORT DE DONNÉES RADIOFRÉQUENCES PAR FIBRE OPTIQUE | [2022/43] | Entry into regional phase | 30.06.2022 | National basic fee paid | 30.06.2022 | Designation fee(s) paid | 30.06.2022 | Examination fee paid | Examination procedure | 30.06.2022 | Examination requested [2022/43] | 30.06.2022 | Date on which the examining division has become responsible | 13.07.2023 | Communication of intention to grant the patent | 10.11.2023 | Fee for grant paid | 10.11.2023 | Fee for publishing/printing paid | 10.11.2023 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 22.12.2022 | Renewal fee patent year 03 | 27.12.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | LT | 31.01.2024 | NO | 30.04.2024 | IS | 31.05.2024 | [2024/33] |
Former [2024/32] | IS | 31.05.2024 | Cited in | International search | [A]EP1227605 (LGC WIRELESS INC [US]) [A] 1-10 * abstract * * paragraphs [0031] , [0 32] * * paragraphs [0046] - [0054] * * figures 1, 3A, 3B *; | [A]WO2019224377 (LATELEC [FR]) [A] 1-10* the whole document * |