blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4027556

EP4027556 - METHOD AND DEVICE FOR REPORTING HARQ FEEDBACK TO BASE STATION IN NR V2X [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  09.06.2024
Database last updated on 12.07.2024
FormerExamination is in progress
Status updated on  28.07.2023
FormerRequest for examination was made
Status updated on  10.06.2022
FormerThe international publication has been made
Status updated on  10.04.2021
Most recent event   Tooltip09.06.2024New entry: Communication of intention to grant a patent 
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
SEOUL 07336 / KR
[2022/28]
Inventor(s)01 / LEE, Seungmin
IP Center, LG Electronics Inc. 19, Yangjae-daero
11-gil, Seocho-gu
Seoul 06772 / KR
02 / HWANG, Daesung
IP Center, LG Electronics Inc. 19, Yangjae-daero
11-gil, Seocho-gu
Seoul 06772 / KR
03 / KO, Woosuk
IP Center, LG Electronics Inc. 19, Yangjae-daero
11-gil, Seocho-gu
Seoul 06772 / KR
 [2022/28]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2022/28]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date20873326.105.10.2020
[2022/28]
WO2020KR13464
Priority number, dateUS201962911177P04.10.2019         Original published format: US 201962911177 P
[2022/28]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021066599
Date:08.04.2021
Language:KO
[2021/14]
Type: A1 Application with search report 
No.:EP4027556
Date:13.07.2022
Language:EN
[2022/28]
Search report(s)International search report - published on:KR08.04.2021
(Supplementary) European search report - dispatched on:EP25.10.2022
ClassificationIPC:H04L1/1829, H04L1/1867, H04L5/00, H04W72/23, // H04W52/34, H04L1/00, H04W4/40
[2024/26]
CPC:
H04L1/1864 (EP); H04L5/0055 (KR); H04W72/232 (US);
H04L1/0072 (EP); H04L1/1812 (KR,US); H04L1/1822 (KR);
H04L1/1861 (EP); H04L1/1893 (EP,US); H04L5/0005 (KR);
H04L5/0053 (EP); H04W4/40 (EP,KR); H04W72/1263 (US);
H04W72/23 (EP,KR); H04W72/25 (US); H04L2001/0092 (EP);
H04W52/346 (EP) (-)
Former IPC [2022/47]H04L1/18, H04L1/00, H04L5/00, H04W4/40, H04W72/04, H04W72/12, // H04W52/34
Former IPC [2022/28]H04L1/18, H04L1/00, H04L5/00, H04W4/40, H04W52/32, H04W72/04, H04W72/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/28]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR MELDUNG VON HARQ-FEEDBACK AN EINE BASISSTATION IN NR V2X[2022/28]
English:METHOD AND DEVICE FOR REPORTING HARQ FEEDBACK TO BASE STATION IN NR V2X[2022/28]
French:PROCÉDÉ ET DISPOSITIF POUR SIGNALER UNE RÉTROACTION HARQ À UNE STATION DE BASE DANS NR V2X[2022/28]
Entry into regional phase07.04.2022Translation filed 
07.04.2022National basic fee paid 
07.04.2022Search fee paid 
07.04.2022Designation fee(s) paid 
07.04.2022Examination fee paid 
Examination procedure07.04.2022Examination requested  [2022/28]
11.05.2023Amendment by applicant (claims and/or description)
11.05.2023Date on which the examining division has become responsible
28.07.2023Despatch of a communication from the examining division (Time limit: M04)
28.11.2023Reply to a communication from the examining division
08.02.2024Despatch of a communication from the examining division (Time limit: M04)
03.04.2024Reply to a communication from the examining division
10.06.2024Communication of intention to grant the patent
Fees paidRenewal fee
25.10.2022Renewal fee patent year 03
25.10.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]  - CMCC, "Discussion on mode-1 resource allocation for NR sidelink", vol. RAN WG1, no. Chongqing, China; 20191014 - 20191020, (20191001), 3GPP DRAFT; R1-1910163, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1910163.zip, (20191001), XP051788970 [Y] 1-15 * the whole document *
 [Y]  - MOTOROLA MOBILITY ET AL, "HARQ enhancement for URLLC", vol. RAN WG1, no. Taipei; 20190121 - 20190125, (20190120), 3GPP DRAFT; R1-1900940 HARQ ENHANCEMENT FOR URLLC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/R1%2D1900940%2Ezip, (20190120), XP051593784 [Y] 1-15 * section 2.2 *
International search[Y]US2019020506  (CHENG YU-HSIN [TW], et al) [Y] 4-8 * See paragraph [0067]; and figure 1. *;
 [YX]  - vivo, "Discussion on mode 1 resource allocation mechanism", 3GPP Draft; R1-1908149_Discussion on mode 1 resource allocation mechanism, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20190817), vol. RAN WG1, no. Prague, CZ; 20190826 - 20190830, XP051764768 [Y] 4-8 * See sections 2.2 and 3.2; and figures 6 and 8. * [X] 1-3,9-20
 [A]  - ITL, "Physical layer procedure for NR V2X", 3GPP Draft; R1-1909117_V2X_PHY procedure, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20190816), vol. RAN WG1, no. Prague, CZ; 20190826 - 20190830, XP051765720 [A] 1-20 * See section 3; and figure 3. *
 [A]  - LG Electronics, "Discussion on resource allocation for NR sidelink Mode 1", 3GPP Draft; R1-1908901 Discussion on resource allocation for mode 1_LG, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20190817), vol. RAN WG1, no. Prague; 20190826 - 20190830, XP051765509 [A] 1-20 * See section 2.5. *
 [A]  - Samsung, "On Resource Allocation for NR V2X Mode 1", 3GPP Draft; R1-1908476 On Resource Allocation for NR V2X Mode 1-Samsung, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, (20190817), vol. RAN WG1, no. Prague, CZ; 20190826 - 20190830, XP051765085 [A] 1-20 * See sections 2-6. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.