blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4023010

EP4023010 - FEEDBACK CHANNEL MAPPING AND MULTIPLEXING HARQ REPORTS IN NR SIDELINK COMMUNICATION [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  10.03.2023
Database last updated on 19.07.2024
FormerRequest for examination was made
Status updated on  03.06.2022
FormerThe international publication has been made
Status updated on  14.05.2021
Most recent event   Tooltip02.07.2024New entry: Reply to examination report 
Applicant(s)For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
[2022/27]
Inventor(s)01 / LIN, Huei-Ming
No. 8, Lane 91, Zhongyi Street
Shihlin District
Taipei 111 / TW
 [2022/27]
Representative(s)Penza, Giancarlo
Bugnion S.p.A.
Viale Lancetti, 17
20158 Milano / IT
[N/P]
Former [2022/27]Fassio, Valeria
Bugnion S.p.A.
Viale Lancetti, 17
20158 Milano / IT
Application number, filing date20885109.703.11.2020
[2022/27]
WO2020CN126194
Priority number, dateUS201962930065P04.11.2019         Original published format: US 201962930065 P
[2022/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021088810
Date:14.05.2021
Language:EN
[2021/19]
Type: A1 Application with search report 
No.:EP4023010
Date:06.07.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 14.05.2021 takes the place of the publication of the European patent application.
[2022/27]
Search report(s)International search report - published on:CN14.05.2021
(Supplementary) European search report - dispatched on:EP05.08.2022
ClassificationIPC:H04L5/00, H04W72/04, H04W28/04, H04L1/18, H04W92/18
[2022/36]
CPC:
H04L1/1861 (EP,IL,KR); H04W72/20 (EP,IL,KR); H04L5/0055 (EP,CN);
H04W72/02 (US); H04L1/1812 (CN,US); H04L1/1864 (EP,IL,KR);
H04L1/1896 (KR); H04L27/2607 (US); H04L5/0005 (EP);
H04L5/0053 (EP,US); H04L5/0094 (EP); H04W4/08 (KR);
H04W4/40 (KR); H04W4/70 (CN); H04W72/0446 (KR,US);
H04W72/0453 (US); H04W76/14 (KR); H04W92/18 (EP,IL,KR) (-)
Former IPC [2022/27]H04W72/04, H04W28/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/27]
TitleGerman:RÜCKKOPPLUNGSKANALABBILDUNG UND MULTIPLEXIEREN VON HARQ-BERICHTEN IN DER NR-SIDELINK-KOMMUNIKATION[2022/27]
English:FEEDBACK CHANNEL MAPPING AND MULTIPLEXING HARQ REPORTS IN NR SIDELINK COMMUNICATION[2022/27]
French:MAPPAGE DE CANAL DE RÉTROACTION ET MULTIPLEXAGE DE RAPPORTS HARQ DANS UNE COMMUNICATION DE LIAISON LATÉRALE NR[2022/27]
Entry into regional phase30.03.2022National basic fee paid 
30.03.2022Search fee paid 
30.03.2022Designation fee(s) paid 
30.03.2022Examination fee paid 
Examination procedure30.03.2022Examination requested  [2022/27]
23.01.2023Amendment by applicant (claims and/or description)
23.01.2023Date on which the examining division has become responsible
10.03.2023Despatch of a communication from the examining division (Time limit: M04)
03.07.2023Reply to a communication from the examining division
07.09.2023Despatch of a communication from the examining division (Time limit: M04)
28.12.2023Reply to a communication from the examining division
04.03.2024Despatch of a communication from the examining division (Time limit: M04)
02.07.2024Reply to a communication from the examining division
Fees paidRenewal fee
22.11.2022Renewal fee patent year 03
20.11.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]  - ASUSTEK, "Discussion on sidelink physical layer procedure on NR V2X", vol. RAN WG1, no. Xi'an, China; 20190408 - 20190412, (20190329), pages 1 - 4, 3GPP DRAFT; R1-1904680, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F96b/Docs/R1%2D1904680%2Ezip, (20190329), XP051691688 [X] 1,3,12,13 * Sections 1-3 * [A] 2,8-11 [I] 4-7
 [XAI]  - LG ELECTRONICS, "Feature lead summary for agenda item 7.2.4.1.2 Physical layer procedures", vol. RAN WG1, no. Taipei, Taiwan; 20190121 - 20190125, (20190125), 3GPP DRAFT; R1-1901439, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5FAH/NR%5FAH%5F1901/Docs/R1%2D1901439%2Ezip, (20190125), XP051601351 [X] 1,3,12,13 * Sections 1-3 * [A] 2,8-11 [I] 4-7
 [XAI]  - NTT DOCOMO ET AL, "NR Sidelink Physical Layer Procedure", vol. RAN WG1, no. Xi'an, China; 20190408 - 20190412, (20190403), 3GPP DRAFT; R1-1905425, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F96b/Docs/R1%2D1905425%2Ezip, (20190403), XP051707495 [X] 1,3,12,13 * Sections 1-3 * [A] 2,8-11 [I] 4-7
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.