EP4107869 - BEAM FAILURE RECOVERY FOR SINGLE DCI-BASED M-TRP URLLC TRANSMISSIONS [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 25.11.2022 Database last updated on 02.08.2024 | |
Former | The international publication has been made Status updated on 27.08.2021 | Most recent event Tooltip | 29.12.2023 | New entry: Renewal fee paid | Applicant(s) | For all designated states Panasonic Intellectual Property Corporation of America 2050 W 190th Street Suite 450 Torrance, CA 90504 / US | [2022/52] | Inventor(s) | 01 /
TRAN, Xuan Tuong c/o Panasonic R&D Center Singapore 202 Bedok South Avenue 1 02-11 Singapore 469332 / SG | 02 /
SUZUKI, Hidetoshi c/o Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi, Osaka 571-8501 / JP | 03 /
HUANG, Lei c/o Panasonic R&D Center Singapore 202 Bedok South Avenue 1 02-11 Singapore 469332 / SG | 04 /
KOH, Tien-Ming Benjamin c/o Panasonic R&D Center Singapore 202 Bedok South Avenue 1 02-11 Singapore 469332 / SG | 05 /
KANG, Yang c/o Panasonic R&D Center Singapore 202 Bedok South Avenue 1 02-11 Singapore 469332 / SG | 06 /
NISHIO, Akihiko c/o Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi, Osaka 571-8501 / JP | 07 /
OGAWA, Yoshihiko c/o Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi, Osaka 571-8501 / JP | [2022/52] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2022/52] | Application number, filing date | 20919951.2 | 03.12.2020 | [2022/52] | WO2020SG50714 | Priority number, date | SG20201001583T | 22.02.2020 Original published format: SG10202001583T | [2022/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2021167528 | Date: | 26.08.2021 | Language: | EN | [2021/34] | Type: | A1 Application with search report | No.: | EP4107869 | Date: | 28.12.2022 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.08.2021 takes the place of the publication of the European patent application. | [2022/52] | Search report(s) | International search report - published on: | SG | 26.08.2021 | (Supplementary) European search report - dispatched on: | EP | 19.06.2023 | Classification | IPC: | H04B7/06, H04W76/19, H04W72/04, H04B7/022, H04B7/08 | [2023/29] | CPC: |
H04B7/022 (EP);
H04B7/0695 (KR,US);
H04B7/088 (EP,KR,US);
H04B7/0408 (KR,US);
H04B7/06964 (EP);
H04W24/08 (KR);
H04W72/21 (KR,US);
H04W72/23 (KR,US);
H04W76/18 (US);
Y02D30/70 (EP)
(-)
|
Former IPC [2022/52] | H04B7/06, H04W76/19, H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/52] | Title | German: | STRAHLFEHLERBESEITIGUNG FÜR EINZELNE DCI-BASIERTE M-TRP-URLLC-ÜBERTRAGUNGEN | [2022/52] | English: | BEAM FAILURE RECOVERY FOR SINGLE DCI-BASED M-TRP URLLC TRANSMISSIONS | [2022/52] | French: | REPRISE SUR DÉFAILLANCE DE FAISCEAU POUR DES TRANSMISSIONS M-TRP URLLC À BASE DE DCI UNIQUE | [2022/52] | Entry into regional phase | 17.08.2022 | National basic fee paid | 17.08.2022 | Search fee paid | 17.08.2022 | Designation fee(s) paid | 17.08.2022 | Examination fee paid | Examination procedure | 17.08.2022 | Examination requested [2022/52] | 14.12.2023 | Amendment by applicant (claims and/or description) | 14.12.2023 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 17.08.2022 | Renewal fee patent year 03 | 28.12.2023 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]US2019037498 (TSENG YUNG-LAN [TW], et al) [X] 1,8,10-12,14,15 * paragraphs [0028] , [0055] , [0061] , [0063] , [0064] , [0066] , [0067]; figure 10 * [I] 6,7,9,13; | [E]WO2021013182 (FG INNOVATION CO LTD [CN]) [E] 1-5,8-12,14,15* paragraphs [0006] - [0008] - [0026] - [0030] - [0033] , [0051] , [0055] , [0061] , [0064] , [0120] , [0277] , [0278] , [0314] , [0316] * | International search | [A]WO2019216418 (SHARP KK [JP], et al) [A] 0 * The whole document *; | [X]US2020053824 (HE LINHAI [US]) [X] 1, 9, 12-13, 24-27, 30- 31 * Figure 1; Paragraphs [0041], [0055], [0060], [0064], [0066] *; | [A] - "On Beam Failure Recovery for SCell", 3GPP TSG-RAN WG1 #99, (20191122), URL: https://www.3gpp.org/ftp/tsg_ran/WG1_RL1/rSGR1_99/Docs/R1-1913140.zip, (20210303), XP051823779 [A] 0 * The whole document * | [A] - "On Beam Failure Recovery for SCell", 3GPP TSG-RAN WG1, Chongqing, China, (20191020), URL: https://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1911006.zip, (20210303), XP051789786 [A] 0 * The whole document * | [A] - "CR to 38.307: Additional NR UE channel bandwidth for FR1", 3GPP TSG RAN WG1, Chongqing, China, (20191020), URL: https://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1910857.zip, (20210303), XP051793207 [A] 0 * The whole document * | by applicant | US2019037498 | WO2021013182 |