blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4017073

EP4017073 - METHOD AND APPARATUS FOR REALIZING NETWORK CAPABILITY OPENING, ELECTRONIC DEVICE AND STORAGE MEDIUM [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  20.05.2022
Database last updated on 24.08.2024
FormerThe international publication has been made
Status updated on  24.09.2021
Most recent event   Tooltip24.11.2023New entry: Renewal fee paid 
Applicant(s)For all designated states
Tencent Technology (Shenzhen) Company Limited
35/F, Tencent Building
Kejizhongyi Road
Midwest District of Hi-tech Park
Nanshan District
Shenzhen, Guangdong, 518057 / CN
[N/P]
Former [2022/29]For all designated states
Tencent Technology (Shenzhen) Company Limited
35/F, Tencent Building
Kejizhongyi Road
Midwest District of Hi-tech Park
Nanshan District
Shenzhen City, Guangdong 518057 / CN
Former [2022/25]For all designated states
TENCENT TECHNOLOGY (SHENZHEN) COMPANY LIMITED
35/F, Tencent Building
Kejizhongyi Road
Midwest District of Hi-tech Park
Nanshan District
Shenzhen, GUANGDONG 518057 / CN
Inventor(s)01 / XIONG, Chunshan
35/F,Tencent Building, Kejizhongyi Road Midwest
District of Hi-tech Park Nanshan District
Shenzhen, Guangdong 518057 / CN
 [2022/25]
Representative(s)EP&C
P.O. Box 3241
2280 GE Rijswijk / NL
[2022/25]
Application number, filing date20925912.611.11.2020
[2022/25]
WO2020CN128209
Priority number, dateCN20201017904515.03.2020         Original published format: CN202010179045
[2022/25]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021184783
Date:23.09.2021
Language:ZH
[2021/38]
Type: A1 Application with search report 
No.:EP4017073
Date:22.06.2022
Language:EN
[2022/25]
Search report(s)International search report - published on:CN23.09.2021
(Supplementary) European search report - dispatched on:EP24.10.2022
ClassificationIPC:H04W24/02, H04L65/752, H04L65/80, // H04L43/08
[2022/47]
CPC:
H04W24/02 (EP,CN); H04W8/24 (US); H04L65/752 (EP);
H04L65/80 (EP); H04W28/065 (CN,US); H04L43/08 (EP)
Former IPC [2022/25]H04W24/02, H04W28/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/25]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM REALISIEREN EINER NETZWERKFÄHIGEN ÖFFNUNG, ELEKTRONISCHE VORRICHTUNG UND SPEICHERMEDIUM[2022/25]
English:METHOD AND APPARATUS FOR REALIZING NETWORK CAPABILITY OPENING, ELECTRONIC DEVICE AND STORAGE MEDIUM[2022/25]
French:PROCÉDÉ ET APPAREIL POUR RÉALISER UNE OUVERTURE DE CAPACITÉ DE RÉSEAU, DISPOSITIF ÉLECTRONIQUE ET SUPPORT DE STOCKAGE[2022/25]
Entry into regional phase15.03.2022Translation filed 
15.03.2022National basic fee paid 
15.03.2022Search fee paid 
15.03.2022Designation fee(s) paid 
15.03.2022Examination fee paid 
Examination procedure15.03.2022Examination requested  [2022/25]
26.04.2023Amendment by applicant (claims and/or description)
26.04.2023Date on which the examining division has become responsible
Fees paidRenewal fee
21.11.2022Renewal fee patent year 03
23.11.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]  - HUAWEI ET AL, "Solution for the KI#3: Network Information Provisioning to EAS with low latency", vol. SA WG2, no. Incheon, South Korea; 20200113 - 20200117, (20200107), 3GPP DRAFT; S2-2000361, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_sa/WG2_Arch/TSGS2_136AH_Incheon/Docs/S2-2000361.zip S2-2000361_Solution for KI#3 Network Information Provisioning to Local Applications with low latency v1.6.doc, (20200107), XP051842434 [X] 1,6,18 * the whole document * [I] 2-5,7-17
 [A]  - HUAWEI ET AL, "Local NEF Selection and Reselection for Network Information Provisioning with low latency", vol. SA WG2, no. Incheon, South Korea; 20200113 - 20200117, (20200107), 3GPP DRAFT; S2-2000654, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_sa/WG2_Arch/TSGS2_136AH_Incheon/Docs/S2-2000654.zip S2-2000654_Local NEF Selection and Reselection for Network Information Provisioning with low latency.doc, (20200107), XP051842712 [A] 1-18 * the whole document *
 [A]  - ANONYMOUS, "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Procedures for the 5G System (5GS); Stage 2 (Release 16)", vol. SA WG2, no. V16.3.0, (20191222), pages 1 - 558, 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 23.502, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: ftp://ftp.3gpp.org/Specs/archive/23_series/23.502/23502-g30.zip 23502-g30.docx, (20191222), XP051840932 [A] 1-18 * 4.15 Network Exposure; page 274 - page 307 *
 [T]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on enhancement of support for Edge Computing in 5G Core network (5GC) (Release 17)", no. V0.4.0, (20200803), pages 1 - 184, 3GPP STANDARD; TECHNICAL REPORT; 3GPP TR 23.748, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: ftp://ftp.3gpp.org/Specs/archive/23_series/23.748/23748-040.zip draft-23748-040-rm-v2.doc, (20200803), XP051925858 [T] 1-18 * 6.47 Solution #47: User Plane based Network Information Provisioning; page 173 - page 177 * * 6.49 Solution #49: Network Information Provisioning to EAS with low latency based on User Plane; page 177 - page 180 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.