blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4133775

EP4133775 - CROSS-LINK INTERFERENCE MEASUREMENT CONFIGURATION [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  12.01.2024
Database last updated on 20.07.2024
FormerRequest for examination was made
Status updated on  13.01.2023
FormerThe international publication has been made
Status updated on  16.10.2021
Most recent event   Tooltip10.04.2024New entry: Reply to examination report 
Applicant(s)For all designated states
QUALCOMM INCORPORATED
ATTN: International IP Administration
5775 Morehouse Drive
San Diego, California 92121-1714 / US
[2023/07]
Inventor(s)01 / XU, Huilin
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / MA, Ruifeng
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2023/07]
Representative(s)Loveless, Ian Mark
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[2023/07]
Application number, filing date20929776.110.04.2020
[2023/07]
WO2020CN84191
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021203410
Date:14.10.2021
Language:EN
[2021/41]
Type: A1 Application with search report 
No.:EP4133775
Date:15.02.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 14.10.2021 takes the place of the publication of the European patent application.
[2023/07]
Search report(s)International search report - published on:CN14.10.2021
(Supplementary) European search report - dispatched on:EP02.01.2024
ClassificationIPC:H04W24/08, H04W24/02, H04W24/10, // H04W56/00
[2024/04]
CPC:
H04W24/08 (EP); H04W24/10 (EP,US); H04B17/336 (US);
H04W24/02 (EP); H04W56/001 (US); H04W56/0045 (EP)
Former IPC [2023/07]H04W24/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/07]
TitleGerman:VERBINDUNGSÜBERGREIFENDE INTERFERENZMESSUNGSKONFIGURATION[2023/07]
English:CROSS-LINK INTERFERENCE MEASUREMENT CONFIGURATION[2023/07]
French:CONFIGURATION DE MESURE D'INTERFÉRENCE DE LIAISON TRANSVERSALE[2023/07]
Entry into regional phase17.08.2022National basic fee paid 
17.08.2022Search fee paid 
17.08.2022Designation fee(s) paid 
17.08.2022Examination fee paid 
Examination procedure17.08.2022Examination requested  [2023/07]
23.05.2023Amendment by applicant (claims and/or description)
02.01.2024Date on which the examining division has become responsible
12.01.2024Despatch of a communication from the examining division (Time limit: M04)
10.04.2024Reply to a communication from the examining division
Fees paidRenewal fee
17.08.2022Renewal fee patent year 03
21.03.2023Renewal fee patent year 04
18.03.2024Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XAI]EP3567759  (LG ELECTRONICS INC [KR]) [X] 1,2,15-17 * paragraph [0011] - paragraph [0012] * * paragraph [0191] - paragraph [0193] * * paragraph [0222] - paragraph [0226] * * paragraph [0233] * [A] 6,9-14 [I] 3-5,7,8;
 [E]WO2021138827  (QUALCOMM INC [US], et al) [E] 1,15-17 * paragraph [0093] - paragraph [0100]; figure 4 * * paragraph [0137] *;
 [E]EP3930367  (GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP LTD [CN]) [E] 1,15-17* paragraph [0033] - paragraph [0038]; figure 2 *;
 [XA]  - NOKIA ET AL, "On Cross-link interference measurement framework", vol. RAN WG1, no. Nagoya, Japan; 20170918 - 20170921, (20170917), 3GPP DRAFT; R1-1715747 ON CROSS-LINK INTERFERENCE MEASUREMENT FRAMEWORK, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170917), XP051339209 [X] 1,2,15-17 * page 2 - page 4 * [A] 6,9-14
 [XA]  - ERICSSON, "Remaining issues for RIM/CLI", vol. RAN WG2, no. Online; 20200420 - 20200430, (20200409), 3GPP DRAFT; R2-2003380, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_109bis-e/Docs/R2-2003380.zip R2-2003380 - Remaining issues for CLI.docx, (20200409), XP052354346 [X] 1,2,15-17 * page 4 * [A] 6,9-14
International search[A]US2018323916  (YANG WEIDONG [US], et al) [A] 1-132 * description, paragraphs [0021]-[0065] *;
 [A]CN108809577  (HUAWEI TECH CO LTD) [A] 1-132 * the whole document *;
 [A]CN109391995  (HUAWEI TECH CO LTD) [A] 1-132* the whole document *;
 [A]CN110383722  (LG ELECTRONICS INC) [A] 1-132 * the whole document *;
 [A]CN110896562  (RES INST CHINA MOBILE COMMUNICATIONS CORP, et al) [A] 1-132 * the whole document *
by applicantUS2018323916
 CN108809577
 CN109391995
 CN110383722
 CN110896562
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.