blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4135456

EP4135456 - METHOD FOR PROCESSING MULTIPLE RESOURCE CONFLICTS AND TERMINAL DEVICE [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  19.01.2024
Database last updated on 27.07.2024
FormerGrant of patent is intended
Status updated on  12.09.2023
FormerRequest for examination was made
Status updated on  13.01.2023
FormerThe international publication has been made
Status updated on  29.10.2021
Most recent event   Tooltip26.07.2024Lapse of the patent in a contracting state
New state(s): AT, BG, ES, FI, GR, HR, NL, RS
published on 28.08.2024 [2024/35]
Applicant(s)For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
[2023/07]
Inventor(s)01 / FU, Zhe
No.18, Haibin Road, Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
 [2023/07]
Representative(s)Taor, Simon Edward William, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2023/07]
Application number, filing date20932549.721.04.2020
[2023/07]
WO2020CN85997
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021212346
Date:28.10.2021
Language:ZH
[2021/43]
Type: A1 Application with search report 
No.:EP4135456
Date:15.02.2023
Language:EN
[2023/07]
Type: B1 Patent specification 
No.:EP4135456
Date:21.02.2024
Language:EN
[2024/08]
Search report(s)International search report - published on:CN28.10.2021
(Supplementary) European search report - dispatched on:EP07.03.2023
ClassificationIPC:H04W72/563, // H04W72/23
[2023/14]
CPC:
H04W72/563 (EP,KR); H04W72/23 (EP,KR,US); H04W72/1268 (KR);
H04W72/21 (KR); H04W72/569 (EP,US)
Former IPC [2023/07]H04W72/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/07]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR VERARBEITUNG MEHRERER RESSOURCENKONFLIKTE UND ENDGERÄTEVORRICHTUNG[2023/07]
English:METHOD FOR PROCESSING MULTIPLE RESOURCE CONFLICTS AND TERMINAL DEVICE[2023/07]
French:PROCÉDÉ DE TRAITEMENT DE CONFLITS DE RESSOURCES MULTIPLES, ET DISPOSITIF TERMINAL[2023/07]
Entry into regional phase09.11.2022Translation filed 
09.11.2022National basic fee paid 
09.11.2022Search fee paid 
09.11.2022Designation fee(s) paid 
09.11.2022Examination fee paid 
Examination procedure09.11.2022Examination requested  [2023/07]
13.06.2023Amendment by applicant (claims and/or description)
13.06.2023Date on which the examining division has become responsible
13.09.2023Communication of intention to grant the patent
16.01.2024Fee for grant paid
16.01.2024Fee for publishing/printing paid
16.01.2024Receipt of the translation of the claim(s)
Fees paidRenewal fee
09.11.2022Renewal fee patent year 03
17.03.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT21.02.2024
BG21.02.2024
ES21.02.2024
FI21.02.2024
HR21.02.2024
LT21.02.2024
NL21.02.2024
NO21.05.2024
RS21.05.2024
GR22.05.2024
IS21.06.2024
[2024/35]
Former [2024/33]LT21.02.2024
NO21.05.2024
IS21.06.2024
Former [2024/32]IS21.06.2024
Documents cited:Search[X]  - NOKIA ET AL, "Analysis of Intra-UE Data Prioritization Schemes", vol. RAN WG2, no. Reno, NV, USA; 20190513 - 20190517, (20190502), 3GPP DRAFT; R2-1906187 ANALYSIS OF INTRA-UE DATA PRIORITIZATION SCHEMES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F106/Docs/R2%2D1906187%2Ezip, (20190502), XP051710512 [X] 1-15 * paragraph [0002] *
 [X]  - SAMSUNG, "Report of [Offline-036][IIOT] Data Data and Data SR prioritization", vol. RAN WG2, no. 20200224 - 20200306, (20200311), 3GPP DRAFT; R2-2002190, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_109_e/Docs/R2-2002190.zip R2-2002190 O036 Summary_Ph3_r2_clean.doc, (20200311), XP051864722 [X] 1-15 * paragraph [2.2.2] * * paragraph [2.2.5] *
 [X]  - QUALCOMM INCORPORATED, "Open issues in Intra-UE prioritization", vol. RAN WG2, no. 20200224 - 20200306, (20200214), 3GPP DRAFT; R2-2001289, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_109_e/Docs/R2-2001289.zip R2-2001289 Open issues in Intra-UE prioritization.doc, (20200214), XP051849597 [X] 1-15 * paragraph [02.2] * * paragraph [02.9] - paragraph [0003] *
 [X]  - ASUSTEK, "Prioritization between CG and uplink grant for Msg3 or MSGA payload", vol. RAN WG2, no. Online Meeting ;20200420 - 20200430, (20200410), 3GPP DRAFT; R2-2003647, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_109bis-e/Docs/R2-2003647.zip R2-2003647 Prioritization between CG and uplink grant for Msg3 or MSGA payload.docx, (20200410), XP051871550 [X] 1-15 * paragraph [0002] - paragraph [0003] * * paragraph [5.4.1] *
International search[X]WO2019095112  (GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP LTD [CN]) [X] 1, 18, 35, 52 * claims 1-58 *;
 [X]WO2019162929  (ERICSSON TELEFON AB L M [SE]) [X] 1, 18, 35, 52 * claims 1-24 *;
 [A]CN110249671  (LG ELECTRONICS INC) [A] 1-52* entire document *;
 [A]CN110636626  (HUAWEI TECH CO LTD) [A] 1-52 * entire document *;
 [X]  - ASUSTeK, "Prioritization between CG and uplink grant for Msg3 or MSGA payload", 3GPP Draft; R2-2003647, (20200410), vol. RAN WG2, pages 1 - 6, XP051871550 [X] 1-52 * section 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.