EP3865627 - SUBMERGED CABLE-STAYED FLOATING TUNNEL STRUCTURE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 28.07.2023 Database last updated on 29.06.2024 | |
Former | Grant of patent is intended Status updated on 16.04.2023 | ||
Former | Request for examination was made Status updated on 25.02.2022 | ||
Former | The application has been published Status updated on 16.07.2021 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states CCCC Third Harbor Engineering Co., Ltd. 139 Pingjiang Road Xu Hui District Shanghai 200032 / CN | For all designated states China Communications Construction Company Limited 85 Deshengmenwai Street Xi Cheng District Beijing 100088 / CN | [2023/35] |
Former [2021/33] | For all designated states CCCC Third Harbor Engineering Co., Ltd. 139 Pingjiang Road Xu Hui District Xu Hui District Shanghai 200032 / CN | ||
For all designated states China Communications Construction Company Limited 85 Deshengmenwai Street Xi Cheng District 100088 Beijing / CN | Inventor(s) | 01 /
Xu, Lixin 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 02 /
Shi, Beiling 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 03 /
Zhao, Hui 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 04 /
Sun, Hongchun 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 05 /
Qiu, Song 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 06 /
Du, Yu 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 07 /
Sun, Xu 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | 08 /
Mo, Yasi 139 Pingjiang Road Xu Hui District Shanghai, 200032 / CN | [2021/33] | Representative(s) | Clarenbach, Carl-Philipp, et al Gleiss Große Schrell und Partner mbB Patentanwälte Rechtsanwälte Leitzstraße 45 70469 Stuttgart / DE | [2021/33] | Application number, filing date | 21152291.7 | 19.01.2021 | [2021/33] | Priority number, date | CN20201063382 | 20.01.2020 Original published format: CN202010063382 | [2021/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3865627 | Date: | 18.08.2021 | Language: | EN | [2021/33] | Type: | B1 Patent specification | No.: | EP3865627 | Date: | 30.08.2023 | Language: | EN | [2023/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.07.2021 | Classification | IPC: | E02D29/067, E02D29/063, E02D29/07 | [2021/33] | CPC: |
E02D29/067 (EP,CN);
E02D29/063 (EP);
E02D29/07 (EP);
E02D29/16 (CN);
E02D2600/30 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/13] |
Former [2021/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GETAUCHTE, SEILGESPANNTE, SCHWIMMENDE TUNNELSTRUKTUR | [2021/33] | English: | SUBMERGED CABLE-STAYED FLOATING TUNNEL STRUCTURE | [2021/33] | French: | STRUCTURE DE TUNNEL FLOTTANTE À HAUBANS SUBMERGÉS | [2021/33] | Examination procedure | 16.02.2022 | Amendment by applicant (claims and/or description) | 18.02.2022 | Examination requested [2022/13] | 18.02.2022 | Date on which the examining division has become responsible | 17.04.2023 | Communication of intention to grant the patent | 20.07.2023 | Fee for grant paid | 20.07.2023 | Fee for publishing/printing paid | 20.07.2023 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 31.01.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 30.08.2023 | CZ | 30.08.2023 | DK | 30.08.2023 | EE | 30.08.2023 | ES | 30.08.2023 | FI | 30.08.2023 | HR | 30.08.2023 | IT | 30.08.2023 | LT | 30.08.2023 | LV | 30.08.2023 | NL | 30.08.2023 | PL | 30.08.2023 | RO | 30.08.2023 | RS | 30.08.2023 | SE | 30.08.2023 | SK | 30.08.2023 | SM | 30.08.2023 | GR | 01.12.2023 | IS | 30.12.2023 | PT | 02.01.2024 | [2024/27] |
Former [2024/23] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/22] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/20] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/14] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/10] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/09] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
LT | 30.08.2023 | ||
SE | 30.08.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/08] | LT | 30.08.2023 | |
GR | 01.12.2023 | Documents cited: | Search | [A]GB2016065 (PRECONTRAINTE STRUCTURES SOC F) [A] 1-9 * the whole document *; | [A]US5899635 (KUJA MICHAEL W [US], et al) [A] 1-9 * page 3, paragraph 4 - page 19, paragraph 8; figures 9-12 *; | [A]CN1590658 (LIU JISHENG [CN]) [A] 1-9 * the whole document *; | [A]CN107700543 (CCCC FIRST HARBOR ENG CO LTD, et al) [A] 1-9* page 2, paragraph 3 - page 7, paragraph 5; figures 1-2 * |