blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3866397

EP3866397 - METHOD AND APPARATUS FOR CHANGING NETWORK CONFIGURATION IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.08.2024
Database last updated on 30.09.2024
FormerThe patent has been granted
Status updated on  15.09.2023
FormerGrant of patent is intended
Status updated on  10.05.2023
FormerRequest for examination was made
Status updated on  05.11.2021
FormerThe application has been published
Status updated on  16.07.2021
Most recent event   Tooltip22.08.2024No opposition filed within time limitpublished on 25.09.2024  [2024/39]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
[2021/33]
Inventor(s)01 / Jeong, Sangsoo
c/o 129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
 [2021/33]
Representative(s)Gulde & Partner
Patent- und Rechtsanwaltskanzlei mbB
Wallstraße 58/59
10179 Berlin / DE
[2021/33]
Application number, filing date21156598.111.02.2021
[2021/33]
Priority number, dateKR2020001910817.02.2020         Original published format: KR 20200019108
KR2020003468420.03.2020         Original published format: KR 20200034684
[2021/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3866397
Date:18.08.2021
Language:EN
[2021/33]
Type: B1 Patent specification 
No.:EP3866397
Date:18.10.2023
Language:EN
[2023/42]
Search report(s)(Supplementary) European search report - dispatched on:EP30.06.2021
ClassificationIPC:H04L41/08
[2023/22]
CPC:
H04L41/08 (EP); H04W48/16 (US); H04W48/18 (US);
H04W60/04 (US); H04W76/11 (US); H04W8/08 (US)
Former IPC [2021/33]H04L12/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/49]
Former [2021/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM ÄNDERN DER NETZWERKKONFIGURATION IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM[2021/33]
English:METHOD AND APPARATUS FOR CHANGING NETWORK CONFIGURATION IN WIRELESS COMMUNICATION SYSTEM[2021/33]
French:PROCÉDÉ ET APPAREIL DE MODIFICATION DE RÉSEAU DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2021/33]
Examination procedure29.10.2021Amendment by applicant (claims and/or description)
29.10.2021Examination requested  [2021/49]
29.10.2021Date on which the examining division has become responsible
11.05.2023Communication of intention to grant the patent
05.09.2023Fee for grant paid
05.09.2023Fee for publishing/printing paid
05.09.2023Receipt of the translation of the claim(s)
Divisional application(s)EP23195436.3  / EP4262165
Opposition(s)19.07.2024No opposition filed within time limit [2024/39]
Fees paidRenewal fee
23.02.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT18.10.2023
CZ18.10.2023
DK18.10.2023
EE18.10.2023
ES18.10.2023
HR18.10.2023
IT18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RO18.10.2023
RS18.10.2023
SE18.10.2023
SK18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
[2024/36]
Former [2024/35]AT18.10.2023
CZ18.10.2023
DK18.10.2023
EE18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RO18.10.2023
RS18.10.2023
SE18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/33]AT18.10.2023
DK18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/27]AT18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/23]AT18.10.2023
ES18.10.2023
LT18.10.2023
NL18.10.2023
BG18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/21]LT18.10.2023
NL18.10.2023
BG18.01.2024
GR19.01.2024
IS18.02.2024
Former [2024/20]NL18.10.2023
GR19.01.2024
IS18.02.2024
Former [2024/17]NL18.10.2023
Documents cited:Search[XYI]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Procedures for the 5G System (5GS); Stage 2 (Release 16)", vol. SA WG2, no. V16.3.0, (20191222), pages 1 - 558, 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 23.502, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: ftp://ftp.3gpp.org/Specs/archive/23_series/23.502/23502-g30.zip 23502-g30.docx, (20191222), XP051840932 [X] 1,5,9,12 * 4.17.9 Delegated service discovery when NF service consumer and NF service producer are in same PLMN; 5.2.7.3 Nnrf_NFDiscovery service, 5.2.7.3.1 General * [Y] 3,4,7,8,11,14,15 [I] 4,8,11,15
 [Y]  - ERICSSON, "Reselection clarification", vol. SA WG2, no. Sapporo, Japan; 20190624 - 20190628, (20190618), 3GPP DRAFT; S2-1906969_CR_501_RESELECTION CLARIFICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG2%5FArch/TSGS2%5F134%5FSapporo/Docs/S2%2D1906969%2Ezip, (20190618), XP051751949 [Y] 3,4,7,8,11,14,15 * 6.3.1 General *
 [A]  - NOKIA ET AL, "eSBA communication schema Model C", vol. SA WG2, no. Kochi, India; 20190121 - 20190125, (20190124), 3GPP DRAFT; S2-1901162-WASS2-1900561-CR_502_NF COMS_MODELC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/SA2/Docs/S2%2D1901162%2Ezip, (20190124), XP051595724 [A] 1-15 * 4.y.x Service discovery with Two step selection method *
 [A]  - LG ELECTRONICS, "Clarification related to Subscription data type", vol. SA WG2, no. Montreal, Canada; 20180226 - 20180302, (20180213), 3GPP DRAFT; S2-181527 (WAS 1340)_23.502_SUBSCRIPTION TYPE CLARIFICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG2%5FArch/TSGS2%5F126%5FMontreal/Docs/, (20180213), XP051408079 [A] 1-15 * 4.2.2.2.3 Registration with AMF re-allocation *
 [A]  - DEUTSCHE TELEKOM AG? ET AL, "Introduction of indirect communication between NF services, and implicit discovery", vol. SA WG2, no. Santa Cruz, Tenerife, Spain; 20190225 - 20190301, (20190219), 3GPP DRAFT; S2-1901515-WAS-S2-1901378-23.501-CR0736-INDIRECT-COMMUNICATION-AND-IMPLICIT-DISCOVERY-REV4, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ;, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG2%5FArch/TSGS2%5F131%5FTenerife/Docs/S2%2D1901515%2Ezip, (20190219), XP051597550 [A] 1-15 * Changes in Rev4; 6.3.1 General; Annex X; *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.