EP3907951 - SYSTEMS AND METHODS FOR LOCATING VALID LTE CHANNELS OF AN LTE BAND [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 06.10.2022 | ||
Former | Request for examination was made Status updated on 05.11.2021 | ||
Former | The application has been published Status updated on 08.10.2021 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): BE, IT | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states PCTEL, Inc. 471 Brighton Drive Bloomingdale, IL 60108 / US | [2023/14] |
Former [2021/45] | For all designated states PC-Tel, Inc. 471 Brighton Drive Bloomingdale, IL 60108 / US | Inventor(s) | 01 /
ZHA, Wei Bloomingdale, 60108 / US | 02 /
SOLTANIAN, Amir Bloomingdale, 60108 / US | 03 /
RETNAM, Antony Thanesh Soosai Bloomingdale, 60108 / US | [2021/45] | Representative(s) | Haseltine Lake Kempner LLP Cheapside House 138 Cheapside London EC2V 6BJ / GB | [2021/45] | Application number, filing date | 21177448.4 | 13.07.2020 | [2021/45] | Priority number, date | US201916512865 | 16.07.2019 Original published format: US201916512865 | [2021/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3907951 | Date: | 10.11.2021 | Language: | EN | [2021/45] | Type: | B1 Patent specification | No.: | EP3907951 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Type: | B8 Corrected title page of specification | No.: | EP3907951 | Date: | 12.04.2023 | [2023/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.10.2021 | Classification | IPC: | H04L27/26, H04J11/00 | [2021/45] | CPC: |
H04L27/2678 (EP);
H04W56/001 (CN);
H04W24/08 (US);
H04B17/318 (US);
H04J11/0069 (EP);
H04L27/26025 (EP);
H04L27/2662 (EP);
H04L5/0007 (US);
H04W28/0231 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/49] |
Former [2021/45] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN ZUR LOKALISIERUNG GÜLTIGER LTE-KANÄLE EINES LTE-BANDES | [2021/45] | English: | SYSTEMS AND METHODS FOR LOCATING VALID LTE CHANNELS OF AN LTE BAND | [2021/45] | French: | SYSTÈMES ET PROCÉDÉS PERMETTANT DE LOCALISER DES CANAUX LTE VALIDES D'UNE BANDE LTE | [2021/45] | Examination procedure | 29.10.2021 | Examination requested [2021/49] | 29.10.2021 | Date on which the examining division has become responsible | 07.10.2022 | Communication of intention to grant the patent | 13.12.2022 | Receipt of the translation of the claim(s) | 21.01.2023 | Fee for grant paid | 21.01.2023 | Fee for publishing/printing paid | Parent application(s) Tooltip | EP20185563.2 / EP3767905 | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 26.07.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | LU | 13.07.2023 | BE | 31.07.2023 | [2024/27] |
Former [2024/18] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
LU | 13.07.2023 | ||
Former [2024/14] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Documents cited: | Search | [A]US2018270771 (CHENDAMARAI KANNAN ARUMUGAM [US], et al) [A] 1 * paragraph [0118] *; | [A]WO2019070184 (ERICSSON TELEFON AB L M [SE]) [A] 1 * page 1, line 20 - page 2, line 13 *; | [A] - OPPO, "Remaining details on SS block transmissions", 3GPP DRAFT; R1-1720853, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20171101), pages 1 - 3, XP051369092 [A] 1-7 * paragraph [02.2] * | [A] - QUALCOMM INCORPORATED, "Synchronization Block Design Implications on RAN4", vol. RAN WG4, no. Hangzhou, China; 20170519 - 20170525, (20170514), 3GPP DRAFT; R4-1704568, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN4/Docs/, (20170514), XP051276818 [A] 1 * paragraph [0002] * | [A] - Fabian Schuh, "LTE: Der Mobilfunk der Zukunft. Synchronization and Cell Search", Ausgew?hlte Kapitel der Nachrichtentechnik, WS 2009/2010, DE, (20100204), URL: http://www.lmk.lnt.de/fileadmin/Lehre/Seminar09/Ausarbeitungen/Ausarbeitung_Schuh.pdf, (20131025), XP055085456 [A] 1,2 * paragraph [3.2.2] * |