EP3929634 - LIGHT-EMITTING DEVICE, PIXEL COMPRISING A PLURALITY OF SUCH DEVICES, PIXEL MATRIX AND ASSOCIATED MANUFACTURING METHODS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.01.2024 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.02.2023 | ||
Former | Grant of patent is intended Status updated on 12.10.2022 | ||
Former | Request for examination was made Status updated on 26.11.2021 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): BE, IT | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Commissariat à l'Energie Atomique et aux Energies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | [2021/52] | Inventor(s) | 01 /
BEN BAKIR, Badhise 38054 GRENOBLE CEDEX 9 / FR | 02 /
GASSE, Adrien 38054 GRENOBLE CEDEX 9 / FR | 03 /
LE BLEVENNEC, Gilles 38054 GRENOBLE CEDEX 9 / FR | 04 /
OLIVIER, Nicolas 38054 GRENOBLE CEDEX 9 / FR | [2021/52] | Representative(s) | Cabinet Camus Lebkiri 25 rue de Maubeuge 75009 Paris / FR | [2021/52] | Application number, filing date | 21177529.1 | 03.06.2021 | [2021/52] | Priority number, date | FR20200006161 | 12.06.2020 Original published format: FR 2006161 | [2021/52] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3929634 | Date: | 29.12.2021 | Language: | FR | [2021/52] | Type: | B1 Patent specification | No.: | EP3929634 | Date: | 22.03.2023 | Language: | FR | [2023/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.11.2021 | Classification | IPC: | G02B5/20, H01L25/075, H01L33/50, H01L33/60 | [2021/52] | CPC: |
H01L33/507 (EP);
H01L33/502 (CN);
H01L33/06 (US);
G02B5/0252 (EP);
G02B5/201 (EP);
G02B5/285 (EP);
G09F9/33 (CN);
H01L25/0753 (EP);
H01L25/167 (US);
H01L27/156 (CN,US);
H01L33/005 (US);
H01L33/10 (US);
H01L33/60 (EP,US);
H01L2933/0041 (EP);
H01L2933/005 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/29] |
Former [2021/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LICHTEMITTIERENDE VORRICHTUNG, PIXEL MIT EINER VIELZAHL SOLCHER VORRICHTUNGEN, PIXELMATRIX UND ENTSPRECHENDE HERSTELLUNGSVERFAHREN | [2021/52] | English: | LIGHT-EMITTING DEVICE, PIXEL COMPRISING A PLURALITY OF SUCH DEVICES, PIXEL MATRIX AND ASSOCIATED MANUFACTURING METHODS | [2021/52] | French: | DISPOSITIF D'EMISSION DE LUMIERE, PIXEL COMPORTANT PLUSIEURS TELS DISPOSITIFS, MATRICE DE PIXELS ET PROCEDES DE FABRICATION ASSOCIES | [2021/52] | Examination procedure | 03.06.2021 | Examination requested [2021/52] | 13.10.2022 | Communication of intention to grant the patent | 10.02.2023 | Fee for grant paid | 10.02.2023 | Fee for publishing/printing paid | 10.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.01.2024 | No opposition filed within time limit [2024/09] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.03.2023 | CZ | 22.03.2023 | DK | 22.03.2023 | EE | 22.03.2023 | ES | 22.03.2023 | FI | 22.03.2023 | HR | 22.03.2023 | IT | 22.03.2023 | LT | 22.03.2023 | LV | 22.03.2023 | MC | 22.03.2023 | NL | 22.03.2023 | PL | 22.03.2023 | RO | 22.03.2023 | RS | 22.03.2023 | SE | 22.03.2023 | SI | 22.03.2023 | SK | 22.03.2023 | SM | 22.03.2023 | IE | 03.06.2023 | LU | 03.06.2023 | NO | 22.06.2023 | GR | 23.06.2023 | BE | 30.06.2023 | IS | 22.07.2023 | PT | 24.07.2023 | [2024/27] |
Former [2024/21] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
IE | 03.06.2023 | ||
LU | 03.06.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/15] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
LU | 03.06.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/10] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/09] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/50] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/49] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/48] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/46] | ES | 22.03.2023 | |
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/38] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/37] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/36] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/35] | HR | 22.03.2023 | |
LT | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/34] | LT | 22.03.2023 | |
RS | 22.03.2023 | ||
Former [2023/33] | LT | 22.03.2023 | Documents cited: | Search | [A]EP2423736 (SHARP KK [JP]) [A] 1,12,14 * paragraphs [0030] , [0037] , [0038] , [0053]; figures 8,9 *; | [A]EP3024030 (COMMISSARIAT ENERGIE ATOMIQUE [FR], et al) [A] 12,14 * paragraph [0053] - paragraph [0065]; figures 3A-3J * * paragraph [0065] * * paragraph [0075]; figure 2 *; | [A]WO2018084919 (VERLASE TECH LLC [US]) [A] 1,12,14 * paragraphs [0005] , [0009] , [0015] , [0060] - [0062] * * paragraphs [0061] , [0069] - [0071]; figure 14 * * paragraphs [0026] , [0080] , [0081] , [0084]; figures 20A,20B * * paragraphs [0088] , [0089] * * paragraphs [0098] , [0099] , [0100] , [0103]; figures 22F, 23-26 *; | [A]FR3061605 (ALEDIA [FR]) [A] 6 * page 17, paragraph 16 - paragraph 25; figures 6,8 * * page 14, line 16 - line 21 *; | [A] - JOAO M M SANTOS ET AL, "Hybrid GaN LED with capillary-bonded II-VI MQW color-converting membrane for visible light communicat", SEMICONDUCTOR SCIENCE AND TECHNOLOGY, IOP PUBLISHING LTD, GB, vol. 30, no. 3, doi:10.1088/0268-1242/30/3/035012, ISSN 0268-1242, (20150127), page 35012, (20150127), XP020281496 [A] 1-14 * page 2, column 1, line 43 - column 2, line 19; figure 1 * DOI: http://dx.doi.org/10.1088/0268-1242/30/3/035012 | by applicant | - GUAN-SYUN CHEN et al., "Monolithic red/green/blue micro-LEDs with HBR and DBR structures", IEEE Photonics Technology Letters, (20180201), vol. 30, no. 3 |