EP4057572 - DEPLOYING A NETWORK MANAGEMENT CONTROLLER IN AN EXISTING DATA CENTER FABRIC [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 28.04.2023 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 10.03.2023 | ||
Former | The application has been published Status updated on 12.08.2022 | Most recent event Tooltip | 20.06.2024 | Change: Despatch of examination report + time limit | Applicant(s) | For all designated states Juniper Networks, Inc. 1133 Innovation Way Sunnyvale, CA 94089 / US | [2022/37] | Inventor(s) | 01 /
JEEVARAJ, Sridevi Sunnyvale, 94089 / US | 02 /
KRISHNAN, Suresh Palguna Sunnyvale, 94089 / US | 03 /
VENKATASUBBIAH, Ganesha Hebbale Sunnyvale, 94089 / US | [2022/37] | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2022/37] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | Application number, filing date | 21177640.6 | 03.06.2021 | [2022/37] | Priority number, date | US202117249760 | 11.03.2021 Original published format: US202117249760 | [2022/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4057572 | Date: | 14.09.2022 | Language: | EN | [2022/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.11.2021 | Classification | IPC: | H04L12/24 | [2022/37] | CPC: |
H04L41/0806 (EP);
H04L12/4641 (CN);
H04L41/0816 (EP,US);
H04L41/0813 (CN);
H04L41/0853 (US);
H04L41/0883 (US);
H04L41/22 (US);
H04L41/0823 (EP);
H04L41/0856 (EP);
Y02D30/00 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/15] |
Former [2022/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | EINSATZ EINES NETZWERKVERWALTUNGSSTEUERGERÄTS IN EINER BESTEHENDEN DATENZENTRUMSSTRUKTUR | [2022/37] | English: | DEPLOYING A NETWORK MANAGEMENT CONTROLLER IN AN EXISTING DATA CENTER FABRIC | [2022/37] | French: | DÉPLOIEMENT D'UN CONTRÔLEUR DE GESTION DE RÉSEAU DANS UNE MATRICE DE CENTRE DE DONNÉES EXISTANTE | [2022/37] | Examination procedure | 08.03.2023 | Amendment by applicant (claims and/or description) | 08.03.2023 | Examination requested [2023/15] | 08.03.2023 | Date on which the examining division has become responsible | 03.05.2023 | Despatch of a communication from the examining division (Time limit: M04) | 01.09.2023 | Reply to a communication from the examining division | 30.10.2023 | Despatch of a communication from the examining division (Time limit: M04) | 27.02.2024 | Reply to a communication from the examining division | 26.04.2024 | Despatch of a communication from the examining division (Time limit: M06) | Fees paid | Renewal fee | 20.06.2023 | Renewal fee patent year 03 | 19.06.2024 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]EP3672157 (JUNIPER NETWORKS INC [US]); | [XI]US10742501 (PIANIGIANI JACOPO [US], et al) |