blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3950215

EP3950215 - MACHINE WITH A SAFETY SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.11.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  09.12.2022
FormerGrant of patent is intended
Status updated on  04.07.2022
FormerRequest for examination was made
Status updated on  18.03.2022
FormerThe application has been published
Status updated on  07.01.2022
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): BE, FR
published on 03.07.2024 [2024/27]
Applicant(s)For all designated states
SCM Group S.p.A.
Via Emilia 77
47921 Rimini (RN) / IT
[2022/06]
Inventor(s)01 / FERRI, Fabio
47921 Rimini / IT
 [2022/06]
Representative(s)Tiburzi, Andrea, et al
Barzanò & Zanardo Roma S.p.A. Via Piemonte 26
00187 Roma / IT
[2022/06]
Application number, filing date21184938.512.07.2021
[2022/06]
Priority number, dateIT2020001961807.08.2020         Original published format: IT202000019618
[2022/06]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3950215
Date:09.02.2022
Language:EN
[2022/06]
Type: B1 Patent specification 
No.:EP3950215
Date:11.01.2023
Language:EN
[2023/02]
Search report(s)(Supplementary) European search report - dispatched on:EP14.12.2021
ClassificationIPC:B23Q1/01, B23Q11/00
[2022/06]
CPC:
B23Q1/012 (EP); B23Q11/0082 (EP); B23Q11/0085 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/16]
Former [2022/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MASCHINE MIT SICHERHEITSSYSTEM[2022/06]
English:MACHINE WITH A SAFETY SYSTEM[2022/06]
French:MACHINE AVEC SYSTÊME DE SÉCURITÉ[2022/31]
Former [2022/06]MACHINE AVEC SYSTÈME DE SÉCURITÉ
Examination procedure10.03.2022Examination requested  [2022/16]
10.03.2022Date on which the examining division has become responsible
05.07.2022Communication of intention to grant the patent
07.11.2022Fee for grant paid
07.11.2022Fee for publishing/printing paid
07.11.2022Receipt of the translation of the claim(s)
Opposition(s)12.10.2023No opposition filed within time limit [2023/51]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
MC11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SI11.01.2023
SK11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
LU12.07.2023
BE31.07.2023
FR31.07.2023
[2024/27]
Former [2024/18]CZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
MC11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SI11.01.2023
SK11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
LU12.07.2023
Former [2024/14]CZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
MC11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SI11.01.2023
SK11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2024/11]CZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SI11.01.2023
SK11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/50]CZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SK11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/49]CZ11.01.2023
DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RO11.01.2023
RS11.01.2023
SE11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/48]DK11.01.2023
EE11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RS11.01.2023
SE11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/46]DK11.01.2023
ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RS11.01.2023
SE11.01.2023
SM11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/39]ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RS11.01.2023
SE11.01.2023
NO11.04.2023
GR12.04.2023
IS11.05.2023
PT11.05.2023
Former [2023/38]ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
PL11.01.2023
RS11.01.2023
SE11.01.2023
NO11.04.2023
GR12.04.2023
PT11.05.2023
Former [2023/37]ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
RS11.01.2023
SE11.01.2023
NO11.04.2023
GR12.04.2023
PT11.05.2023
Former [2023/36]ES11.01.2023
FI11.01.2023
HR11.01.2023
LT11.01.2023
LV11.01.2023
NL11.01.2023
RS11.01.2023
SE11.01.2023
NO11.04.2023
PT11.05.2023
Former [2023/35]ES11.01.2023
HR11.01.2023
LT11.01.2023
NL11.01.2023
RS11.01.2023
NO11.04.2023
PT11.05.2023
Former [2023/34]ES11.01.2023
LT11.01.2023
NL11.01.2023
RS11.01.2023
PT11.05.2023
Former [2023/33]ES11.01.2023
LT11.01.2023
NL11.01.2023
Former [2023/31]NL11.01.2023
Documents cited:Search[A]DE102004041821  (ABB RESEARCH LTD [CH]) [A] 1* figure 1; claims 1,9 *;
 [A]DE202009007035U  (HOMAG HOLZBEARBEITUNGSSYSTEME [DE]) [A] 1-13 * figures 1-3; claim 1 *;
 [A]WO2017103811  (SCM GROUP SPA [IT]) [A] 1-13 * paragraph [0091]; figure 14; claim 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.