EP3920210 - BIASABLE FLUX OPTIMIZER/COLLIMATOR FOR PVD SPUTTER CHAMBER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 28.04.2023 | ||
Former | Grant of patent is intended Status updated on 06.12.2022 | ||
Former | Request for examination was made Status updated on 10.06.2022 | ||
Former | The application has been published Status updated on 05.11.2021 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states Applied Materials, Inc. 3050 Bowers Avenue Santa Clara, CA 95054 / US | [2021/49] | Inventor(s) | 01 /
RIKER, Martin Lee Milpitas, 95035 / US | 02 /
ZHANG, Fuhong San Jose, 95123 / US | 03 /
INFANTE, Anthony San Mateo, 94403 / US | 04 /
WANG, Zheng Mountain View, 94040 / US | [2021/49] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2021/49] | Application number, filing date | 21188409.3 | 27.09.2016 | [2021/49] | Priority number, date | US201562246967P | 27.10.2015 Original published format: US 201562246967 P | [2021/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3920210 | Date: | 08.12.2021 | Language: | EN | [2021/49] | Type: | B1 Patent specification | No.: | EP3920210 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.10.2021 | Classification | IPC: | H01L21/285, H01L21/768, C23C14/16, H01J37/34, H01J37/32 | [2021/49] | CPC: |
H01J37/3447 (EP,KR,US);
C23C14/3407 (CN);
C23C14/046 (US);
C23C14/35 (CN,KR);
C23C14/542 (CN);
H01J37/32403 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/28] |
Former [2021/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORSPANNBARER FLUSSOPTIMIERER/KOLLIMATOR FÜR PVD-SPUTTERKAMMER | [2022/43] | English: | BIASABLE FLUX OPTIMIZER/COLLIMATOR FOR PVD SPUTTER CHAMBER | [2021/49] | French: | DISPOSITIF D'OPTIMISATION/COLLIMATEUR DE FLUX POUVANT ÊTRE POLARISÉ POUR CHAMBRE DE PULVÉRISATION PVD | [2021/49] |
Former [2021/49] | VORSPANNBARER FLUSSOPTIMIERER/KOLLIMATOR FÜR PVDSPUTTERKAMMER | Examination procedure | 02.06.2022 | Amendment by applicant (claims and/or description) | 02.06.2022 | Examination requested [2022/28] | 02.06.2022 | Date on which the examining division has become responsible | 07.12.2022 | Communication of intention to grant the patent | 17.04.2023 | Fee for grant paid | 17.04.2023 | Fee for publishing/printing paid | 17.04.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP16860473.4 / EP3369108 | Divisional application(s) | EP23175161.1 / EP4235744 | Opposition(s) | 01.03.2024 | No opposition filed within time limit [2024/19] | Fees paid | Renewal fee | 29.07.2021 | Renewal fee patent year 03 | 29.07.2021 | Renewal fee patent year 04 | 29.07.2021 | Renewal fee patent year 05 | 21.09.2021 | Renewal fee patent year 06 | 21.09.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | IT | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | MC | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | NO | 31.08.2023 | GR | 01.09.2023 | GB | 27.09.2023 | IE | 27.09.2023 | LU | 27.09.2023 | BE | 30.09.2023 | CH | 30.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | [2024/36] |
Former [2024/35] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
GB | 27.09.2023 | ||
IE | 27.09.2023 | ||
LU | 27.09.2023 | ||
CH | 30.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/33] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
GB | 27.09.2023 | ||
IE | 27.09.2023 | ||
LU | 27.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/28] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
MC | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
LU | 27.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/27] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
IT | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SI | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
LU | 27.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/10] | AT | 31.05.2023 | |
CZ | 31.05.2023 | ||
DK | 31.05.2023 | ||
EE | 31.05.2023 | ||
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RO | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
PT | 02.10.2023 | ||
Former [2024/08] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
SK | 31.05.2023 | ||
SM | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/03] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
FI | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2024/01] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
LT | 31.05.2023 | ||
LV | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/52] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
NL | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/51] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
HR | 31.05.2023 | ||
PL | 31.05.2023 | ||
RS | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/50] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
PL | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
GR | 01.09.2023 | ||
IS | 30.09.2023 | ||
Former [2023/48] | AT | 31.05.2023 | |
ES | 31.05.2023 | ||
SE | 31.05.2023 | ||
NO | 31.08.2023 | ||
Former [2023/46] | ES | 31.05.2023 | Documents cited: | Search | [A]WO9313542 (MATERIALS RESEARCH CORP [US]); | [A]US5650052 (EDELSTEIN SERGIO [US], et al); | [A]US2009308739 (RIKER MARTIN LEE [US], et al); | [AP]WO2016085805 (APPLIED MATERIALS INC [US]) |