blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4111759

EP4111759 - DETERMINING AN APPLICABLE TIME FOR A PATHLOSS REFERENCE SIGNAL [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  02.12.2022
Database last updated on 12.07.2024
FormerThe international publication has been made
Status updated on  03.09.2021
Formerunknown
Status updated on  25.02.2021
Most recent event   Tooltip12.01.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
QUALCOMM INCORPORATED
ATTN: International IP Administration
5775 Morehouse Drive
San Diego, California 92121-1714 / US
[2023/01]
Inventor(s)01 / ZHOU, Yan
5775 Morehouse Drive
San Diego, California 92121 / US
02 / LUO, Tao
5775 Morehouse Drive
San Diego, California 92121 / US
 [2023/01]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2023/01]
Application number, filing date21705855.125.01.2021
[2023/01]
WO2021US70076
Priority number, dateUS202062980864P24.02.2020         Original published format: US 202062980864 P
US20211724818313.01.2021         Original published format: US202117248183
[2023/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021174239
Date:02.09.2021
Language:EN
[2021/35]
Type: A1 Application with search report 
No.:EP4111759
Date:04.01.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 02.09.2021 takes the place of the publication of the European patent application.
[2023/01]
Search report(s)International search report - published on:EP02.09.2021
ClassificationIPC:H04W52/24
[2023/01]
CPC:
H04W52/242 (EP,US); H04L5/0048 (EP,US); H04L43/16 (US);
H04L5/005 (EP); H04L5/0055 (EP); H04W24/08 (US);
H04W56/001 (EP,US); H04B17/327 (EP); H04L5/0023 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/01]
TitleGerman:BESTIMMUNG EINER APPLIZIERBAREN ZEIT FÜR EIN WEGVERLUSTREFERENZSIGNAL[2023/01]
English:DETERMINING AN APPLICABLE TIME FOR A PATHLOSS REFERENCE SIGNAL[2023/01]
French:DÉTERMINATION D'UN MOMENT D'APPLICATION POUR UN SIGNAL DE RÉFÉRENCE DE PERTE DE TRAJET[2023/01]
Entry into regional phase24.06.2022National basic fee paid 
24.06.2022Designation fee(s) paid 
24.06.2022Examination fee paid 
Examination procedure24.06.2022Examination requested  [2023/01]
24.06.2022Date on which the examining division has become responsible
27.03.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
18.01.2023Renewal fee patent year 03
11.01.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]WO2018228437  (HUAWEI TECH CO LTD [CN]) [A] 1-30* paragraph [0006] - paragraph [0032] *;
 [I]  - QUALCOMM INCORPORATED, "Enhancements on Multi-beam Operation", vol. RAN WG1, no. 20200224 - 20200306, (20200215), 3GPP DRAFT; R1-2000975, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_100_e/Docs/R1-2000975.zip R1-2000975 Enhancements on Multi-beam Operation.docx, (20200215), XP051853548 [I] 1-30 * 3. Activation Time for Pathloss RS *
 [A]  - ZTE, "Maintenance of enhancements on multi-beam operation", vol. RAN WG1, no. e-Meeting; 20200224 - 20200306, (20200215), 3GPP DRAFT; R1-2000240, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_100_e/Docs/R1-2000240.zip R1-2000240 Maintenance of enhancements on multi-beam operation.doc, (20200215), XP051853235 [A] 1-30 * 2.2 MAC-CE based path-loss RS update for PUSCH and SRS *
 [A]  - NTT DOCOMO ET AL, "Remaining issues on multi-beam operation", vol. RAN WG1, no. e-Meeting; 20200224 - 20200306, (20200214), 3GPP DRAFT; R1-2000926, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_100_e/Docs/R1-2000926.zip R1-2000926.docx, (20200214), XP051853104 [A] 1-30 * 8.10.2 "Known conditions for TCI state" *
 [A]  - SAMSUNG, "Enhancements on MIMO for NR", vol. TSG RAN, no. Sitges, Spain; 20191209 - 20191212, (20191202), 3GPP DRAFT; RP-192434, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/TSG_RAN/TSGR_86/Docs/RP-192434.zip RP-192434 SR for RAN_86_NR-eMIMO.docx, (20191202), XP051835463 [A] 1-30 * 2.1 RAN1 2.1.1. Agreements *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.