blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4304888

EP4304888 - CURRENT COLLECTOR AND METHOD FOR OPERATING [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  15.12.2023
Database last updated on 14.09.2024
FormerThe international publication has been made
Status updated on  16.09.2022
Formerunknown
Status updated on  27.03.2021
Most recent event   Tooltip17.05.2024Change: Validation statespublished on 19.06.2024  [2024/25]
17.05.2024Change - extension statespublished on 19.06.2024  [2024/25]
Applicant(s)For all designated states
Schunk Transit Systems GmbH
Hauptstraße 97
35435 Wettenberg / DE
[2024/03]
Inventor(s)01 / PFEFFER, Daniel
35325 Mücke / DE
 [2024/03]
Representative(s)advotec.
Patent- und Rechtsanwaltspartnerschaft
Tappe mbB
Georg-Schlosser-Straße 6
35390 Gießen / DE
[2024/03]
Application number, filing date21712738.010.03.2021
[2024/03]
WO2021EP56098
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2022188972
Date:15.09.2022
Language:DE
[2022/37]
Type: A1 Application with search report 
No.:EP4304888
Date:17.01.2024
Language:DE
The application published by WIPO in one of the EPO official languages on 15.09.2022 takes the place of the publication of the European patent application.
[2024/03]
Search report(s)International search report - published on:EP15.09.2022
ClassificationIPC:B60L5/38, B60L5/40
[2024/03]
CPC:
B60L5/38 (EP,GB,US); B60L5/39 (GB); B60L5/40 (EP);
H01R41/00 (GB); B60L2200/26 (EP,GB,US); B60L2240/36 (EP);
B60L2240/62 (EP); B60L2240/662 (EP); B60L2240/70 (EP);
B60L2250/16 (EP); B60L2270/145 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/03]
TitleGerman:STROMABNEHMER UND VERFAHREN ZUM BETRIEB[2024/03]
English:CURRENT COLLECTOR AND METHOD FOR OPERATING[2024/03]
French:COLLECTEUR DE COURANT ET SON PROCÉDÉ DE FONCTIONNEMENT[2024/03]
Entry into regional phase05.09.2023National basic fee paid 
05.09.2023Designation fee(s) paid 
05.09.2023Examination fee paid 
Examination procedure05.09.2023Examination requested  [2024/03]
05.09.2023Date on which the examining division has become responsible
18.04.2024Amendment by applicant (claims and/or description)
Fees paidRenewal fee
05.09.2023Renewal fee patent year 03
22.03.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XYI]DE4438720  (ABB PATENT GMBH [DE]);
 [Y]JP2011205774  (RAILWAY TECHNICAL RES INST, et al);
 [A]EP2838752  (SIEMENS AG OESTERREICH [AT]);
 [YA]DE102017214418  (SIEMENS AG [DE])
by applicantUS2013081915
 DE102009054484
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.