blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4128713

EP4128713 - ESTABLISHMENT OF A TELECOMMUNICATIONS SERVICE [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  05.04.2024
Database last updated on 07.10.2024
FormerExamination is in progress
Status updated on  11.08.2023
FormerRequest for examination was made
Status updated on  06.01.2023
FormerThe international publication has been made
Status updated on  02.10.2021
Formerunknown
Status updated on  27.03.2021
Most recent event   Tooltip05.04.2024Application deemed to be withdrawnpublished on 08.05.2024  [2024/19]
Applicant(s)For all designated states
British Telecommunications public limited company
1 Braham Street
London E1 8EE / GB
[2023/06]
Inventor(s)01 / CORSTON-PETRIE, Andrew
Ground Floor, Faraday Building
1 Knightrider Street
London EC4V 5BT / GB
02 / BROWN, Ruth
Ground Floor, Faraday Building
1 Knightrider Street
London EC4V 5BT / GB
03 / HART, Jonathan
Ground Floor, Faraday Building
1 Knightrider Street
London EC4V 5BT / GB
 [2023/06]
Representative(s)British Telecommunications public limited company Intellectual Property Department
9th Floor
One Braham
Braham Street
London E1 8EE / GB
[2023/06]
Application number, filing date21712839.619.03.2021
[2023/06]
WO2021EP57160
Priority number, dateGB2020000440626.03.2020         Original published format: GB 202004406
[2023/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021191091
Date:30.09.2021
Language:EN
[2021/39]
Type: A1 Application with search report 
No.:EP4128713
Date:08.02.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 30.09.2021 takes the place of the publication of the European patent application.
[2023/06]
Search report(s)International search report - published on:EP30.09.2021
ClassificationIPC:H04L29/08, H04L12/725, H04W40/24, H04L12/24
[2023/06]
CPC:
H04L45/306 (EP); H04W40/24 (GB); H04L67/63 (EP,US);
H04L41/342 (US); H04L45/04 (GB,US); H04L67/141 (GB,US);
H04W76/10 (GB); H04L41/40 (EP,GB) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/06]
TitleGerman:AUFBAU EINES TELEKOMMUNIKATIONSDIENSTES[2023/06]
English:ESTABLISHMENT OF A TELECOMMUNICATIONS SERVICE[2023/06]
French:ÉTABLISSEMENT D'UN SERVICE DE TÉLÉCOMMUNICATIONS[2023/06]
Entry into regional phase30.08.2022National basic fee paid 
30.08.2022Designation fee(s) paid 
30.08.2022Examination fee paid 
Examination procedure30.08.2022Examination requested  [2023/06]
30.08.2022Date on which the examining division has become responsible
03.05.2023Amendment by applicant (claims and/or description)
10.08.2023Despatch of a communication from the examining division (Time limit: M04)
21.12.2023Application deemed to be withdrawn, date of legal effect  [2024/19]
12.01.2024Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2024/19]
Fees paidRenewal fee
03.01.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]US2017104847  (ZHANG QIONG [US], et al) [X] 1,16,20,25 * paragraph [0005] - paragraph [0007] * * paragraph [0019] * * paragraph [0048] * * paragraph [0054] - paragraph [0070] * * paragraph [0079] * * paragraph [0093] - paragraph [0095] * * paragraph [0099] - paragraph [0103] * * figures 2-8 * [I] 2-15,17-19,21-24;
 [A]WO2019120524  (ERICSSON TELEFON AB L M [SE]) [A] 1-25 * page 3, line 2 - line 31 * * page 13, line 25 - page 15, line 10 * * page 24, line 18 - line 25 * * page 25, line 30 - page 266, line 26 *;
 [A]  - "5G End-to-End Architecture Framework", (20191110), 3GPP DRAFT; S6-192010, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/Meetings_3GPP_SYNC/SA6/Docs/S6-192010.zip NGMN_E2EArchFramework_v3.0.8.docx, (20191110), XP051824217 [A] 1-25 * page 19, "5 Network Slicing" * * page 53, "10 ORCHESTRATION ARCHITECTURE FLAVOURS" - page 57, "11.2.4 Federated Network Slicing Service Model" *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.