blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4158710

EP4158710 - METHOD FOR FUELING FUEL CELL SYSTEMS, AND FUEL CELL SYSTEM ASSEMBLY [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  03.03.2023
Database last updated on 25.09.2024
FormerThe international publication has been made
Status updated on  03.12.2021
Formerunknown
Status updated on  27.04.2021
Most recent event   Tooltip01.05.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2023/14]
Inventor(s)01 / KRAUSE, Christian
70176 Stuttgart / DE
02 / OLBRICH, Stephan
70435 Stuttgart / DE
03 / STRAHL, Stephan
70619 Stuttgart / DE
04 / MANGA, Bilge
71229 Leonberg / DE
 [2023/14]
Application number, filing date21719573.414.04.2021
[2023/14]
WO2021EP59624
Priority number, dateDE20201020669828.05.2020         Original published format: DE102020206698
[2023/14]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2021239315
Date:02.12.2021
Language:DE
[2021/48]
Type: A1 Application with search report 
No.:EP4158710
Date:05.04.2023
Language:DE
The application published by WIPO in one of the EPO official languages on 02.12.2021 takes the place of the publication of the European patent application.
[2023/14]
Search report(s)International search report - published on:EP02.12.2021
ClassificationIPC:H01M8/04082, H01M8/04955
[2023/14]
CPC:
H01M8/04201 (EP,KR,US); H01M8/04089 (KR); H01M8/04303 (US);
H01M8/04388 (KR); H01M8/0444 (KR,US); H01M8/04753 (KR,US);
H01M8/04947 (KR); H01M8/04955 (EP,KR); Y02E60/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/14]
TitleGerman:VERFAHREN ZUM BETANKEN VON BRENNSTOFFZELLENSYSTEMEN UND BRENNSTOFFZELLENSYSTEMVERBUND[2023/14]
English:METHOD FOR FUELING FUEL CELL SYSTEMS, AND FUEL CELL SYSTEM ASSEMBLY[2023/14]
French:PROCÉDÉ DE RAVITAILLEMENT DE SYSTÈMES DE PILES À COMBUSTIBLE ET ENSEMBLE DE SYSTÈMES DE PILES À COMBUSTIBLE[2023/14]
Entry into regional phase02.01.2023National basic fee paid 
02.01.2023Designation fee(s) paid 
02.01.2023Examination fee paid 
Examination procedure02.01.2023Examination requested  [2023/14]
02.01.2023Date on which the examining division has become responsible
01.06.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
02.05.2023Renewal fee patent year 03
30.04.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US6964821  (HIRAKATA SYUJI [JP]) [A] 1-10 * claims 1, 10 *;
 [A]DE102010027881  (DEUTSCH ZENTR LUFT & RAUMFAHRT [DE], et al) [A] 1-10* paragraph [0028] - paragraph [0029] *;
 [A]DE102017214975  (AUDI AG [DE], et al) [A] 1-10 * paragraphs [0013] - [0017] * * paragraph [0030] *
by applicantDE10028331
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.