blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4136901

EP4136901 - NETWORK-INFERRED SYNCHRONIZATION FOR POSITIONING MEASUREMENTS [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  20.01.2023
Database last updated on 05.10.2024
FormerThe international publication has been made
Status updated on  22.10.2021
Formerunknown
Status updated on  04.05.2021
Most recent event   Tooltip24.07.2024Change - representative 
Applicant(s)For all designated states
QUALCOMM INCORPORATED
ATTN: International IP Administration
5775 Morehouse Drive
San Diego, California 92121-1714 / US
[2023/08]
Inventor(s)01 / YERRAMALLI, Srinivas
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / EDGE, Stephen William
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / FERRARI, Lorenzo
5775 Morehouse Drive
San Diego, California 92121-1714 / US
04 / PRAKASH, Rajat
5775 Morehouse Drive
San Diego, California 92121-1714 / US
05 / ZHANG, Xiaoxia
5775 Morehouse Drive
San Diego, California 92121-1714 / US
06 / MANOLAKOS, Alexandros
5775 Morehouse Drive
San Diego, California 92121-1714 / US
07 / FISCHER, Sven
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2023/08]
Representative(s)Reddie & Grose LLP
The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[N/P]
Former [2023/08]Loveless, Ian Mark
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
Application number, filing date21721337.005.04.2021
[2023/08]
WO2021US25781
Priority number, dateUS202063011869P17.04.2020         Original published format: US 202063011869 P
US20211722161502.04.2021         Original published format: US202117221615
[2023/08]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021211321
Date:21.10.2021
Language:EN
[2021/42]
Type: A1 Application with search report 
No.:EP4136901
Date:22.02.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 21.10.2021 takes the place of the publication of the European patent application.
[2023/08]
Search report(s)International search report - published on:EP21.10.2021
ClassificationIPC:H04W64/00
[2023/08]
CPC:
H04W64/006 (EP); H04W64/00 (KR); H04W4/029 (EP,US);
G01S5/0045 (EP); G01S5/02216 (EP,KR,US); G01S5/0236 (KR,US);
H04L5/0048 (EP,KR,US); H04W24/08 (KR); G01S1/68 (EP);
H04L5/005 (EP); H04W56/0015 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/08]
TitleGerman:NETZWERKABGELEITETE SYNCHRONISATION FÜR POSITIONSMESSUNGEN[2023/08]
English:NETWORK-INFERRED SYNCHRONIZATION FOR POSITIONING MEASUREMENTS[2023/08]
French:SYNCHRONISATION INFÉRÉE PAR LE RÉSEAU POUR LES MESURES DE POSITIONNEMENT[2023/08]
Entry into regional phase18.08.2022National basic fee paid 
18.08.2022Designation fee(s) paid 
18.08.2022Examination fee paid 
Examination procedure18.08.2022Examination requested  [2023/08]
18.08.2022Date on which the examining division has become responsible
30.05.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
21.02.2023Renewal fee patent year 03
18.03.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]  - QUALCOMM INCORPORATED, "Comparison of 5GC-LMF and RAN-LMC based Positioning", vol. RAN WG3, no. Chongqing, China; 20191014 - 20191018, (20191004), 3GPP DRAFT; R3-195824_(LOCAL LMF BENEFITS), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG3_Iu/TSGR3_105bis/Docs/R3-195824.zip R3-195824_(Local LMF Benefits).docx, (20191004), XP051810037 [Y] 1-46 * figures 6, 7 *
 [Y]  - QUALCOMM INCORPORATED, "Stage 2 for Multi-RTT positioning", vol. RAN WG2, no. Reno, Nevada, USA; 20191118 - 20191122, (20191108), 3GPP DRAFT; R2-1915558, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_108/Docs/R2-1915558.zip R2-1915558_(TP for mRTT Stage 2).docx, (20191108), XP051817272 [Y] 1-46 * page 2, paragraph 2 * * page 12, paragraph 3.1 * * figures 8.x.3.1.3.1-1 *
 [Y]  - QUALCOMM INCORPORATED, "DL and UL NR Positioning Procedures", vol. RAN WG2, no. Chongqing, China; 20191014 - 20191018, (20191004), 3GPP DRAFT; R2-1913395_(POSITIONING PROCEDURES+DRAFT LPP CR), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG2_RL2/TSGR2_107bis/Docs/R2-1913395.zip R2-1913395_(Positioning Procedures+Draft LPP CR).docx, (20191004), XP051804974 [Y] 13,33,42 * page 16, paragraph 3.2 *
 [Y]  - QUALCOMM INCORPORATED, "Combined Downlink and Uplink NR Positioning Procedures", vol. RAN WG2, no. Spokane, USA; 20181112 - 20181116, (20181102), pages 1 - 18, 3GPP DRAFT; R2-1817899_(POSITIONING PROCEDURES), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F104/Docs/R2%2D1817899%2Ezip, (20181102), XP051481785 [Y] 14,15,34,35,43,44 * figure 4 *
 [Y]  - HUAWEI ET AL, "Physical layer procedure for NR positioning", vol. RAN WG1, no. Chongqing, China; 20191014 - 20191020, (20191005), 3GPP DRAFT; R1-1910036, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_98b/Docs/R1-1910036.zip R1-1910036.docx, (20191005), XP051808396 [Y] 7,27 * figure 1 * * page 5, paragraph 2.1.2 *
by applicant   - 3GPP Technical Report (TR) 22.804
    - 3GPP TS 37.355
    - 3GPP Technical Specification (TS) 37.355
    - 3GPP TS 38.455
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.